NV B-2 Residential/Small Commercial
Nevada B-2 Residential and Small Commercial General Building Contractor Examination
Nevada One CallEnglish
Exam overviewPractice session
Per NRS 455.110, before beginning a non-emergency excavation in an area known or reasonably known to contain a subsurface installation, the excavator shall notify the association for operators (811) at least how long, and not more than how long, before the work is scheduled to start?
Loading your practice session…