NV C-1K Industrial Piping
Nevada C-1K Industrial Piping Contractor Examination
Gas PipingEnglish
Exam overviewPractice session
Per 2018 UPC Section 1213.3 (and the parallel 2018 UMC Chapter 13 rule), a new low-pressure industrial fuel-gas system that is not welded and will operate at not more than 14 inches water column shall stand an air, CO2, or nitrogen test of not less than:
Loading your practice session…