GCC Mines & Works Plant Engineering Exam
GCC Mines & Works Engineer — Plant Engineering Examination (South Africa)
Materials Handling Processing SafetyEnglish
Exam overviewPractice session
An inclined overland conveyor belt moves run-of-mine ore at a rate of 900 tonnes per hour (250 kg/s) at a belt speed v = 2.5 m/s up a vertical lift height H = 40 m. If total friction drag force along idlers is calculated as F_f = 15.0 kN and drive efficiency η = 85%, calculate the minimum electric motor power required to drive the conveyor. (g = 9.81 m/s²).
Loading your practice session…