1 Chapter 1: Gravity Sewers, System Components & Materials
1.1 Gravity Sewer Principles & System Layout 1.2 Sewer Pipe Materials, Sizing & Joining Methods 1.3 Manholes, Drop Structures & Appurtenances 1.4 Gravity Sewer Hydraulics, Slope & Scour Velocity
2 Chapter 2: Lift Stations, Pumping Systems & Force Mains
2.1 Lift Station Design: Wet Well vs Dry Well Systems 2.2 Wastewater Pumps & Operating Principles 2.3 Level Controls, Pump Sequencing & SCADA Telemetry 2.4 Force Mains, Valves & Surge Protection 2.5 Lift Station Emergency Power, Maintenance & Operation
3 Chapter 3: Sewer Inspection, Testing & Cleaning
3.1 Hydraulic Jetting & High-Velocity Cleaning 3.2 Mechanical Rodding, Bucketing & Clearing Methods 3.3 Closed-Circuit Television (CCTV) Inspection & NASSCO PACP 3.4 Sewer Testing Methods: Smoke, Dye & Acoustic 3.5 Root, Grease & Debris Management
4 Chapter 4: Inflow & Infiltration (I/I), SSOs & FOG Management
4.1 Inflow vs Infiltration Fundamentals & RDII 4.2 Sanitary Sewer Overflows (SSOs) & Combined Sewer Overflows (CSOs) 4.3 SSO Emergency Response, Containment & NPDES Reporting 4.4 Fats, Oils, and Grease (FOG) Control Programs 4.5 Sewer System Rehabilitation & Trenchless Methods
5 Chapter 5: Safety, Confined Space Entry & Environmental Hazards
5.1 OSHA 1910.146 Permit-Required Confined Space Standards 5.2 Atmospheric Testing, Monitoring & Calibration Sequence 5.3 Ventilation, PPE & Emergency Rescue Equipment 5.4 Hydrogen Sulfide (H2S), Toxic Gases & Crown Corrosion 5.5 Trenching, Excavation & Traffic Safety (MUTCD & 811)
6 Chapter 6: Operator Math, Hydraulics & System Administration
6.1 Flow, Velocity & Cross-Sectional Area Calculations 6.2 Lift Station Hydraulics, Pumping Rate & Drawdown Math 6.3 Sewer Slope, Invert Elevations & Grade Calculations 6.4 Chemical Dosing, Feed Rate & Quantity Calculations 6.5 Regulatory Framework, Recordkeeping & System Mapping
7 Chapter 7: Equipment Operation, Tools & Preventive Maintenance
7.1 Gas Detectors, Flow Meters & Blowers: Operation and Calibration 7.2 Balling, Flushing, Poly Pigs & Cleaning-Method Selection 7.3 Heavy Equipment, Excavation & Hydro Excavation 7.4 Electrical Equipment: VFDs, Motor Control Centers & Low-Voltage Devices 7.5 Preventive Maintenance Programs, SOP/OEM Compliance & Support Tools
8 Chapter 8: System Restoration, Mapping & Emergency Operations
8.1 Manhole, Tap & Lateral Rehabilitation and Exfiltration Control 8.2 Appurtenance Inspection: Air Release Valves, Siphons, Regulators & Outfalls 8.3 Blueprints, GIS, Asset Management & System Mapping 8.4 Emergency Bypass Pumping & System Failure Response 8.5 New Pipe Installation Inspection & Acceptance Testing
9 Chapter 9: Monitoring, Safety Programs & System Administration
9.1 Flow Monitoring, Flow Meters & Sensor Calibration 9.2 Wastewater Characteristics & Abnormal Discharge Identification 9.3 Chemical Handling, Inventory, Feed Systems & Spill Response 9.4 Electrical Safety, Lockout/Tagout, Fire Safety & Occupational Health 9.5 Customer Service, Safety Programs, Operator Training & Regulatory Administration
7.5 Preventive Maintenance Programs, SOP/OEM Compliance & Support Tools
Key Takeaways Explain This Topic AI
Maintenance strategies rank as reactive, preventive, and predictive; predictive methods such as vibration analysis and thermography detect failure before it interrupts service.
Manufacturer O&M manuals and written SOPs define the required maintenance interval, and deviating from them can void warranty coverage.
Any hydrant or potable connection used to fill a jet truck requires backflow protection — an air gap or a reduced-pressure zone assembly — because the truck is a high-hazard cross-connection.
Pipe locators trace metallic lines directly; non-metallic PVC requires a sonde, a traceable rod, or installed tracer wire.
Last updated: September 2026
7.5 Preventive Maintenance Programs, SOP/OEM Compliance & Support Tools
Exam Focus: Two criteria tasks converge here: perform preventative maintenance including repair, replacement, and installation of equipment — motors, pumps, valves, engines, generators, level sensing equipment , and maintain all equipment in accordance with SOP/OEM specifications . A third task, operate equipment and/or tools , lists the support equipment covered at the end of this section.
Three Maintenance Strategies
Strategy Trigger Cost profile
Reactive (run-to-failure) The equipment breaks Lowest planning cost, highest total cost — overtime, collateral damage, possible SSO
Preventive (PM) Elapsed calendar time or accumulated runtime hours Predictable; some maintenance performed unnecessarily
Predictive (PdM) Measured condition indicates developing failure Highest skill requirement, lowest total cost
Run-to-failure is a legitimate strategy for non-critical, redundant, cheap assets — a spare yard light. It is never acceptable for a lift station pump whose failure causes a sanitary sewer overflow.
Predictive techniques an operator may collect data for:
Vibration analysis — spectral signatures distinguish imbalance, misalignment, bearing defects, and cavitation.
Infrared thermography — a hot spot in an MCC bucket reveals a loose lug or a failing contact before it burns open.
Insulation resistance trending — the megger readings from Section 2.5 charted over time.
Oil analysis — water content and wear metals in gear oil signal seal failure.
Runtime and amp trending — rising amps at constant head indicates a wearing impeller or a partially fouled line.
Building the PM Schedule from OEM and SOP
The OEM operation and maintenance manual is the governing document for interval and procedure: lubricant type and quantity, torque values, clearances, and service intervals. Two consequences follow:
Warranty. Failing to perform documented maintenance at the specified interval, or substituting a non-specified lubricant, commonly voids coverage on a major asset.
Defensibility. After an SSO, the regulator asks whether the utility maintained the asset as specified. The maintenance record is the answer.
A standard operating procedure (SOP) translates the manual into the utility's own step-by-step instruction, incorporating local isolation points, lockout requirements, and confined-space rules. Completed work is recorded in a computerized maintenance management system (CMMS) that generates work orders on schedule, records labor and parts, and builds the equipment history used for repair-versus-replace decisions.
Representative PM Tasks
Asset Typical preventive tasks
Motors Insulation resistance test, amp draw on all three phases, bearing lubrication per manual, vibration check, cooling-fin cleaning
Pumps Impeller and wear-ring clearance, mechanical seal chamber oil check for water intrusion, packing adjustment, suction and discharge gauge readings, rag removal
Valves Exercise each valve through full travel on a schedule, lubricate stems, check packing, verify position indicators
Engines and generators Oil and filter, coolant and antifreeze protection level, belts and hoses, battery condition and charger output, fuel quality and tank level
Level sensing Clean grease and rag buildup off floats and transducers, verify against a manual measurement, check the desiccant breather
Generator testing deserves emphasis: a monthly no-load exercise run circulates oil and charges the battery but does not prove capacity. Only a periodic load test — with the station's real load or a load bank — confirms the unit can carry the station during an actual outage. Wet stacking, the accumulation of unburned fuel in a diesel exhaust from chronic light-load running, is the failure mode that no-load-only exercising creates.
Valve exercising is the second commonly neglected item. A force main isolation valve that has not been operated in ten years is very likely seized, and the crew discovers this during the emergency in which they need it.
Support Tools the Criteria Name
Chain pull hoists and overhead cranes. Used to lift submersible pumps and covers out of wet wells. Verify the rated capacity against the load, inspect chain and slings for stretch, gouges, and heat damage before each use, never side-load a hoist, and never allow a worker under a suspended load. Lifting a pump out of a wet well often occurs at an open permit-required confined space, so the entry protections stay in force.
Backflow prevention devices. When a jet or combination truck fills from a fire hydrant , the truck's contaminated tank becomes a direct high-hazard cross-connection to the potable distribution system. Protection is required — an approved reduced-pressure zone (RPZ) assembly on the fill connection, or a physical air gap of at least twice the fill pipe diameter above the tank's flood rim. This is one of the most consequential rules in the trade: a backflow event from a sewer-cleaning truck contaminates drinking water.
Hydrant operations. Obtain the required use permit and metering assembly from the water utility, open the hydrant fully (a partially opened dry-barrel hydrant does not seat the drain valve and will erode the seat), open and close slowly to avoid water hammer, flush briefly to clear rust before filling, and confirm the barrel drains after use so it does not freeze.
Metal detectors and pipe locators. An electromagnetic locator transmits a signal onto a conductive target and traces it with a receiver. Because PVC and vitrified clay are non-conductive , they cannot be traced directly. Non-metallic lines require a sonde (a small transmitter pushed through the pipe on a rod or camera), a traceable rod , or tracer wire installed alongside the pipe at construction. Magnetic locators find buried iron — valve boxes and cast manhole covers under pavement overlays.
Portable pumps and flushing units. Verify priming, check suction hose for collapse and air leaks, confirm discharge routing, and never place an engine-driven unit where its exhaust can enter a manhole or a work space.