5.3 Strike-Off, Cleaning, Mass, and Density

ACI Concrete Field Testing Technician Grade I Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Orientation: Certification Requirements, Written Exam, Performance Exam, and Study Sources

1.1 Credential Purpose and Official Definition 1.2 Eligibility and the Two-Part Certification Path 1.3 Written Exam Format and Dual Passing Rule 1.4 Performance Exam Format and Grading 1.5 Current Study Sources and CP-1 41st Edition 1.6 Validity, Recertification, and Myth Control

2 JTA, Performance Checklists, Common Fail Points, and Field Mindset

2.1 JTA as the Exam Blueprint 2.2 Written Knowledge Versus Performance Skill 2.3 Performance Checklists and the Six Demonstrations 2.4 Timing, Sequence, and Verbal Description Discipline 2.5 Common Fail Points and Result Recording 2.6 Field Mindset, Exam Habits, and Second Trials

3 ASTM C172: Sampling Fresh Concrete and Field Sample Control

3.1 Representative Sampling Purpose and Exam Role 3.2 Sampling Locations and Middle-Discharge Control 3.3 Composite Sample Timing, Remixing, and Protection 3.4 Sample Size, Large Aggregate, and Wet Sieving 3.5 Sequence With Slump, Temperature, Air, Density, and Specimens 3.6 Performance Exam Verbal Description and Field Habits

4 ASTM C1064 Temperature and ASTM C143 Slump

4.1 ASTM C1064 Purpose, Equipment, and Timing 4.2 Sensor Placement, Stabilization, and Reporting 4.3 Temperature Field Errors and Performance Habits 4.4 ASTM C143 Scope, Equipment, and Setup 4.5 Filling, Rodding, Lifting, and Measuring Slump 4.6 Invalid Slump Results, Reporting, and Integrated Habits

5 ASTM C138: Density, Unit Weight, Yield, and Gravimetric Air

5.1 Purpose, Equipment, and the Calibrated Measure 5.2 Sampling, Filling, and Consolidation Choice 5.3 Strike-Off, Cleaning, Mass, and Density 5.4 Yield, Relative Yield, and Batch Comparison 5.5 Gravimetric Air and Theoretical Density 5.6 Reporting, Validity, and Calculation Traps

6 ASTM C231: Pressure Air Method, Type B Meter, and Aggregate Correction

6.1 Scope, Principle, and When Pressure Air Fits 6.2 Type B Meter Equipment, Calibration, and Setup 6.3 Sampling, Bowl Filling, Consolidation, and Strike-Off 6.4 Type B Sequence: Water, Petcocks, Pressure, and Reading 6.5 Aggregate Correction Factor and Final Air Content 6.6 Reporting, Validity, and Invalid-Result Traps

7 ASTM C173: Volumetric Air Method, Rollameter, Alcohol Correction, and Validity

7.1 Scope, Equipment, and When the Volumetric Method Fits 7.2 Sample, Bowl Filling, Consolidation, and Strike-Off 7.3 Water, Alcohol, Initial Liquid Level, and Sealing 7.4 Inversion, Shaking, Rolling, and Air Release 7.5 Reading Agreement, Out-of-Range Steps, and Invalid Results 7.6 Alcohol Correction, Calculation, Reporting, and Performance Habits

8 ASTM C31: Making and Curing Cylinders and Beams, Initial Curing, and Transport

8.1 Purpose, Sample, Equipment, and Specimen Plan 8.2 Cylinder Molding, Consolidation, Finishing, and Identification 8.3 Beam Molding, Flexural Specimens, and Finishing 8.4 Initial Curing, Protection, Temperature, and Moisture 8.5 Standard Curing, Field Curing, Final Curing, and Interpretation 8.6 Transport, Lab Handoff, Reporting, and Common Failures

9 Integrated Field Workflow: Test Order, Documentation, and Quality Control

9.1 Field Sample to Report Workflow 9.2 Test Order and Parallel Timing 9.3 Documentation and Report Accuracy 9.4 Invalid Results and Retest Decisions 9.5 QA/QC Communication and Acceptance Context 9.6 Contamination, Delays, and Handoff Control

10 Written Exam Strategy: Numerical Values, Calculations, and Category Scoring

10.1 One-Hour Written Exam Pacing 10.2 Category Scoring and the No-Compensation Rule 10.3 High-Yield Numerical Values and Units 10.4 Density, Yield, and Gravimetric Air Calculations 10.5 Air Content Corrections and Validity Checks 10.6 Method-by-Method Practice Plan

11 Performance Exam Strategy: Equipment Setup, Examiner Communication, and Remediation

11.1 Performance Exam Map and Mindset 11.2 Equipment Setup, Station Control, and Safety 11.3 Examiner Communication and Speaking the Work 11.4 One-Step Errors, Timing, and Method Control 11.5 C172 Verbal Description Under Pressure 11.6 Remediation, Retest Planning, and Field Confidence

12 Final Review: Recertification, Career Paths, and Next ACI Credentials

12.1 Two-to-Six Week Final Review Plan 12.2 Final Week and Test-Day Checklist 12.3 CP-1, JTA, and Source Control 12.4 Recertification, Five-Year Cycle, and Re-Exam Requirement 12.5 Career Paths After Field Testing Grade I 12.6 Next ACI Credentials and Growth Map

5.3 Strike-Off, Cleaning, Mass, and Density

Key Takeaways Explain This Topic AI

After consolidation, slightly overfill the measure, then strike off with a flat plate using a sawing/pressing motion to make the surface flush and smooth.

Clean all concrete from the exterior and rim of the measure before weighing, or the recorded mass — and density — will be too high.

Density D = (Mc − Mm) / Vm, reported to the nearest 0.1 lb/ft³ (1 kg/m³).

Normal-weight concrete typically falls between 140 and 150 lb/ft³; results far outside this signal a procedural error.

The balance must be accurate to 0.3% of the test load to keep the density reliable.

Last updated: June 2026

Strike-Off With a Flat Plate

After the final layer is consolidated, the concrete should slightly overfill the measure — about 1/8 in. (3 mm) above the rim. Using the flat strike-off plate (not the round tamping rod, a frequent distractor), strike the surface flush in two motions:

A sawing motion across the top with the plate held at a slight angle, working off the excess concrete.

A pressing/finishing pass with the plate nearly flat, using light pressure to leave a smooth, flush surface level with the rim.

The goal is that the volume of concrete in the measure exactly equals the calibrated volume Vm — no heaping (which inflates mass and density) and no depression below the rim (which deflates them). A few light taps with the mallet during strike-off can help close any small surface voids the plate exposes.

Clean the Measure Before Weighing

Before taking the mass, clean all excess concrete from the exterior, the rim, and the base of the measure. Any concrete clinging to the outside adds mass that the calculation will wrongly attribute to the concrete inside, pushing the density too high. This is one of the most-cited field errors:

  • Error Effect on Mass Effect on Density Effect on Yield
  • Concrete left on the exterior Too high Too high Too low
  • Heaped (not struck flush) Too high Too high Too low
  • Depressed surface / under-fill Too low Too low Too high

Note the chain: anything that raises measured density lowers calculated yield , because yield = batch mass ÷ density. The exam routinely tests this inverse relationship by describing a sloppy strike-off and asking which way the yield error goes.

Weighing and Computing Density

Weigh the filled, cleaned measure on a balance accurate to 0.3% of the test load . Record this as Mc . Subtract the previously recorded empty-measure mass Mm to get the net concrete mass, then divide by the calibrated volume Vm :

D = (Mc − Mm) / Vm

Density is reported to the nearest 0.1 lb/ft³ (or 1 kg/m³).

Worked density example

Empty measure Mm = 9.10 lb ; filled measure Mc = 45.60 lb ; volume Vm = 0.250 ft³ .

  • Net mass = 45.60 − 9.10 = 36.50 lb
  • Density = 36.50 / 0.250 = 146.0 lb/ft³

This sits squarely in the 140–150 lb/ft³ normal-weight range, so it passes the field sanity check. Lightweight concrete will read well below 140, and heavyweight (e.g., barite or magnetite) well above 150 — so 'reasonable' depends on the mix being tested, not a fixed number.

Putting the Procedure in Order

The correct sequence is worth memorizing because the exam may scramble it:

Obtain and remix the C172 sample.

Select and confirm the clean, calibrated, empty-weighed measure.

Fill and consolidate (3 layers rodded / 2 layers vibrated) per slump.

Tap the sides 10–15 times per rodded layer.

Strike off flush with the flat plate.

Clean the exterior of the measure.

Weigh the filled measure (Mc).

Compute D = (Mc − Mm) / Vm.

Skipping or reordering the clean-then-weigh steps is the classic trap — cleaning must come before weighing, and striking off must come before cleaning.

Reading the Balance Correctly

The balance must be accurate to 0.3% of the test load . For a filled small measure weighing roughly 45 lb, 0.3% is about 0.14 lb — so a scale that reads only to the nearest pound is not adequate for C138. On a field digital scale, allow the reading to stabilize before recording, keep the scale level , and protect it from wind that can make a hanging or platform reading drift. Re-zero (tare) the scale before each test sequence.

A subtle field point: weigh the same measure you calibrated and emptied. If two similar measures are in use, mixing them up pairs the wrong Mm and Vm with the filled mass — an error that can be several pounds and is easy to miss. Labeling measures and recording their empty mass and calibrated volume together on the data sheet prevents this.

Worked Check: Tracing an Error Through the Numbers

Suppose two technicians test the same concrete. Technician A follows procedure: Mm = 9.10 lb, Mc = 45.60 lb, Vm = 0.250 ft³ → D = 36.50/0.250 = 146.0 lb/ft³ .

Technician B leaves a film of concrete on the exterior, adding 0.50 lb , so Mc reads 46.10 lb → D = (46.10 − 9.10)/0.250 = 37.00/0.250 = 148.0 lb/ft³ .

The 2.0 lb/ft³ inflation looks small, but trace it forward: for a 3,886 lb batch, A computes yield = 3,886/146.0 = 26.62 ft³, while B computes 3,886/148.0 = 26.26 ft³ — a difference of 0.36 ft³ per batch, which across a day's deliveries becomes a meaningful volume and dollar discrepancy. The exam rewards technicians who understand that small density errors are not harmless because of this leverage on yield.

The same logic explains why heaping the measure is so damaging: a surface mounded 1/4 in. above the rim on a 6-in.-diameter measure adds roughly half a pound of concrete, inflating density just as the exterior film did. Strike-off and cleaning are not cosmetic — they are how the measure ends up holding exactly Vm of concrete and nothing more.