Study guide
3.4 Connected Load, Maximum Demand & DEWA Diversity Factors
Dubai Municipality DEQ Electrical Technical Staff Qualification Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: DEWA Regulations and Approval Procedures
1.1 DEWA Low Voltage Supply Characteristics & Network Parameters 1.2 DEQ Qualification Scope and Applicant Requirements 1.3 Drawing Approval, NOCs, Inspection & Connection Workflows 1.4 Metering Enclosures, Labelling & Distribution Point Rules
2 Chapter 2: Earthing, Bonding and Protection
2.1 TN-S Earthing System & Earth Loop Impedance (Zs, Ze) 2.2 Equipotential and Supplementary Bonding Requirements 2.3 RCD/ELCB Protection Standards (30mA & Distribution RCDs) 2.4 Overcurrent Protection, Circuit Breakers & Discrimination
3 Chapter 3: Cable Sizing and Load Calculation
3.1 Conductor Selection & Current-Carrying Capacity 3.2 Temperature, Grouping & Installation Derating Factors for Dubai 3.3 Voltage Drop Limits & Calculation Methods 3.4 Connected Load, Maximum Demand & DEWA Diversity Factors
4 Chapter 4: BS 7671 Wiring and Installation Practice
4.1 IEC Conductor Colors, Wiring Methods & IP Ratings 4.2 Special Locations & Bathroom Zoning Requirements 4.3 Initial Verification: Dead & Live Electrical Testing Procedures 4.4 Fire-Resistant Wiring, Containment & Concealed Wiring Rules
5 Chapter 5: Substation and Transformer Requirements
5.1 Substation & Switchroom Layout, Ventilation & Clearances 5.2 Ring Main Units (RMU), Transformers & Switchgear 5.3 Fault Levels, Earth Electrodes & Step/Touch Potentials
6 Chapter 6: Electrical Theory and Safety
6.1 AC 3-Phase Calculations, Power Factor & Apparent Power 6.2 Safe Isolation, Lockout/Tagout & DEWA Safety Protocols
3.4 Connected Load, Maximum Demand & DEWA Diversity Factors
Key Takeaways Explain This Topic AI
Connected Load (CL) represents the sum of nameplate continuous ratings of all installed electrical equipment, while Maximum Demand (MD) reflects the actual simultaneous peak power drawn.
Applying DEWA diversity factors prevents gross over-sizing of supply transformers, main switchgear, incoming service cables, and DEWA connection charges.
DEWA guidelines stipulate specific diversity factors: 66% for general interior lighting, 100% for the largest socket outlet circuit plus 40% for remaining socket circuits, and 100% for HVAC and electric water heaters.
Duty/standby motor arrangements (such as domestic water pumps or fire pumps) require counting 100% of duty motor capacity while assigning 0% simultaneous demand to standby units.
Three-phase demand current is calculated from total diversified kVA demand using Idemand = (SkVA · 1000) / (√3 · 400), establishing the baseline for main incomer protection and busbar selection.
Last updated: July 2026
3.4 Connected Load, Maximum Demand & DEWA Diversity Factors
Study focus: Accurate load estimation dictates the sizing of Main Distribution Boards (MDBs), main incoming supply cables, and DEWA transformer capacity. Candidates must know DEWA's specific diversity rules: 66% for lighting , 100% first + 40% remaining for 13A socket circuits , 100% (zero diversity) for HVAC , and 100% duty / 0% standby for pumps .
Estimating electrical load is the first critical phase in designing any building distribution system in Dubai. Summing the total rated electrical capacity of every lamp, socket outlet, water heater, and air conditioner yields the Connected Load (CL) . However, operating all electrical utilization equipment simultaneously at full rated capacity is practically impossible. Applying statutory DEWA Diversity Factors yields the realistic Maximum Demand (MD) , establishing the true capacity required for incoming service feeders, switchgear, and supply transformers.
Core Definitions & Load Terminology
Connected Load (CL): The sum total of continuous nameplate power ratings of all connected electrical equipment and sub-circuits, expressed in kilowatts ( k W kW kW ) or kilovolt-amperes ( k V A kVA kV A ).
Maximum Demand (MD): The highest integrated electric load drawn by the facility over a designated time interval (typically 15-minute or 30-minute peak demand window) during operating cycles ( M D ≤ C L MD \le CL M D ≤ C L ).
Demand Factor: The ratio of Maximum Demand to Connected Load: Demand Factor = Maximum Demand (MD) Connected Load (CL) ≤ 1.0 \text{Demand Factor} = \frac{\text{Maximum Demand (MD)}}{\text{Connected Load (CL)}} \le 1.0 Demand Factor = Connected Load (CL) Maximum Demand (MD) ≤ 1.0
Diversity Factor: The ratio of the sum of individual non-coincident peak demands of sub-circuits to the simultaneous maximum demand of the entire installation: Diversity Factor = ∑ Individual Peak Demands Simultaneous Maximum System Demand ≥ 1.0 \text{Diversity Factor} = \frac{\sum \text{Individual Peak Demands}}{\text{Simultaneous Maximum System Demand}} \ge 1.0 Diversity Factor = Simultaneous Maximum System Demand ∑ Individual Peak Demands ≥ 1.0 Load Pyramid: Connected Load vs Maximum Demand
- ┌─────────────────────────────────────────────────────────────────────────┐
- │ Connected Load (CL): Sum of ALL Nameplate Ratings (100% Capacity) │
- ├─────────────────────────────────────────────────────────────────────────┤
- │ │ │
- │ Lighting (66%) Socket Outlets (100%+40%) HVAC (100% No Diversity)│
- │ │ │
- ├─────────────────────────────────────────────────────────────────────────┤
- │ Maximum Demand (MD): Realistic Peak Diversified System Demand │
- └─────────────────────────────────────────────────────────────────────────┘
- Economic & Operational Impact of Diversity
Oversizing Risks: Ignoring diversity causes gross oversizing of transformers, main circuit breakers, main feeders, and busbars. This severely inflates initial capital expenditures, increases DEWA service connection fees, and forces transformers to run at light load, incurring poor efficiency and high fixed core losses.
Undersizing Risks: Over-estimating diversity (under-estimating demand) leads to nuisance tripping of main incomer breakers during hot Dubai summer afternoons when HVAC units run continuously at peak ambient conditions.
DEWA Statutory Diversity Allowances
DEWA Regulations for Electrical Installations prescribe standard diversity factors across different load categories:
1. General Interior Lighting Circuits
Residential, Office & Commercial Spaces: 66 % 66\% 66% ( 0.66 0.66 0.66 ) diversity factor applied to total connected lighting load.
Hotel Guest Rooms & Apartment Bedrooms: 50 % 50\% 50% to 66 % 66\% 66% diversity.
2. 13A Ring & Radial Socket Outlet Circuits (BS 1363)
First / Largest Socket Circuit: 100 % 100\% 100% ( 1.00 1.00 1.00 ) of rated capacity (standard 32A ring circuit = 7.36 kVA 7.36\text{ kVA} 7.36 kVA at 230 V 230\text{ V} 230 V ).
Remaining Socket Circuits: 40 % 40\% 40% ( 0.40 0.40 0.40 ) of rated capacity for all additional socket sub-circuits connected to the distribution board.
3. HVAC & Air Conditioning Equipment
Chillers, Package AC Units, DX Split Units, AHUs, FCUs: 100 % 100\% 100% ( 1.00 1.00 1.00 ) demand factor — ZERO diversity allowed .
Rationale: In Dubai, peak ambient air temperatures ( > 45 ∘ C > 45^\circ\text{C} > 4 5 ∘ C ) force all air conditioning and mechanical ventilation equipment to operate simultaneously at full continuous rated capacity.
4. Electric Water Heaters
Individual / Residential Units: 100 % 100\% 100% ( 1.00 1.00 1.00 ) demand factor .
Multi-Unit Residential Developments: 100 % 100\% 100% for largest water heater + 50 % 50\% 50% for remaining units.
5. Water Pumps & Motor Loads
Domestic / Transfer Water Pumps (Duty / Standby): 100 % 100\% 100% for Duty Pump , 0 % 0\% 0% for Standby Pump (mechanically or electrically interlocked to prevent simultaneous running).
Elevators / Lifts: 100 % 100\% 100% for largest lift motor + 75 % 75\% 75% for 2nd lift motor + 60 % 60\% 60% for remaining lift motors.
- Load Category DEWA Diversity Allowance Practical Calculation Method
- Lighting 66 % 66\% 66% Total Lighting k W × 0.66 kW \times 0.66 kW × 0.66
13A Socket Outlets 100 % 100\% 100% 1st + 40 % 40\% 40% remainder 7.36 kVA + ( Remaining Circuits × 7.36 kVA × 0.40 ) 7.36\text{ kVA} + (\text{Remaining Circuits} \times 7.36\text{ kVA} \times 0.40) 7.36 kVA + ( Remaining Circuits × 7.36 kVA × 0.40 )
- HVAC / Air Conditioning 100 % 100\% 100% (Zero Diversity) Total HVAC k W × 1.00 kW \times 1.00 kW × 1.00
- Water Heaters 100 % 100\% 100% Total Water Heater k W × 1.00 kW \times 1.00 kW × 1.00
Water Pumps (Duty/Standby) 100 % 100\% 100% Duty / 0 % 0\% 0% Standby Duty Pump k W × 1.00 kW \times 1.00 kW × 1.00 (Standby excluded)
Power Factor ( cos ϕ \cos\phi cos ϕ ) & Current Conversion
DEWA's allowable overall power-factor range is 0.90 lagging to unity at the point of supply, with 0.95 lagging recommended as a design target.
Convert Active Power ( P P P in k W kW kW ) to Apparent Power ( S S S in k V A kVA kV A ): S kVA = P kW cos ϕ S_{\text{kVA}} = \frac{P_{\text{kW}}}{\cos\phi} S kVA = cos ϕ P kW
Three-Phase Demand Line Current ( I demand I_{\text{demand}} I demand ): I demand = S kVA × 1000 3 × 400 V = P kW × 1000 3 × 400 V × cos ϕ I_{\text{demand}} = \frac{S_{\text{kVA}} \times 1000}{\sqrt{3} \times 400\text{ V}} = \frac{P_{\text{kW}} \times 1000}{\sqrt{3} \times 400\text{ V} \times \cos\phi} I demand = 3 × 400 V S kVA × 1000 = 3 × 400 V × cos ϕ P kW × 1000
- Step-by-Step Worked Numerical Example
- Problem Statement
Perform a comprehensive load estimation and main incomer breaker sizing for a commercial building floor in Dubai with the following connected loads:
Lighting Load: 18 kW 18\text{ kW} 18 kW total connected LED lighting (Power Factor = 0.90 0.90 0.90 lagging).
Socket Outlet Circuits: 10 10 10 ring socket sub-circuits (32A rated @ 230V = 7.36 kVA 7.36\text{ kVA} 7.36 kVA each, Power Factor = 0.95 0.95 0.95 ).
HVAC Air Conditioning: 60 kW 60\text{ kW} 60 kW total connected DX packaged cooling units (Power Factor = 0.85 0.85 0.85 lagging).
Electric Water Heaters: 6 6 6 units @ 2 kW 2\text{ kW} 2 kW each = 12 kW 12\text{ kW} 12 kW total (Power Factor = 1.00 1.00 1.00 ).
Domestic Water Pumps: 2 2 2 pumps (1 Duty, 1 Standby) @ 7.5 kW 7.5\text{ kW} 7.5 kW each (Power Factor = 0.85 0.85 0.85 lagging).
Calculate the Total Connected Load, Total Diversified Maximum Demand, System Demand Factor, and Main Circuit Breaker (MCCB) Rating.
Step 1: Compute Connected Load (CL)
Lighting Connected k V A kVA kV A : 18 kW 0.90 = 20.00 kVA \frac{18\text{ kW}}{0.90} = 20.00\text{ kVA} 0.90 18 kW = 20.00 kVA
Sockets Connected k V A kVA kV A : 10 × 7.36 kVA = 73.60 kVA 10 \times 7.36\text{ kVA} = 73.60\text{ kVA} 10 × 7.36 kVA = 73.60 kVA
HVAC Connected k V A kVA kV A : 60 kW 0.85 = 70.59 kVA \frac{60\text{ kW}}{0.85} = 70.59\text{ kVA} 0.85 60 kW = 70.59 kVA
Water Heaters Connected k V A kVA kV A : 12 kW 1.00 = 12.00 kVA \frac{12\text{ kW}}{1.00} = 12.00\text{ kVA} 1.00 12 kW = 12.00 kVA
Water Pumps Connected k V A kVA kV A : 2 × 7.5 kW 0.85 = 17.65 kVA 2 \times \frac{7.5\text{ kW}}{0.85} = 17.65\text{ kVA} 2 × 0.85 7.5 kW = 17.65 kVA Total Connected Load (CL) = 20.00 + 73.60 + 70.59 + 12.00 + 17.65 = 193.84 kVA \text{Total Connected Load (CL)} = 20.00 + 73.60 + 70.59 + 12.00 + 17.65 = 193.84\text{ kVA} Total Connected Load (CL) = 20.00 + 73.60 + 70.59 + 12.00 + 17.65 = 193.84 kVA
Step 2: Apply DEWA Diversity Factors to Calculate Maximum Demand (MD)
Diversified Lighting: P light = 18 kW × 0.66 = 11.88 kW ⇒ S light = 11.88 kW 0.90 = 13.20 kVA P_{\text{light}} = 18\text{ kW} \times 0.66 = 11.88\text{ kW} \quad \Rightarrow \quad S_{\text{light}} = \frac{11.88\text{ kW}}{0.90} = 13.20\text{ kVA} P light = 18 kW × 0.66 = 11.88 kW ⇒ S light = 0.90 11.88 kW = 13.20 kVA
Diversified Socket Outlets:
1st circuit @ 100%: 7.36 kVA 7.36\text{ kVA} 7.36 kVA
9 remaining circuits @ 40%: 9 × 7.36 kVA × 0.40 = 26.50 kVA 9 \times 7.36\text{ kVA} \times 0.40 = 26.50\text{ kVA} 9 × 7.36 kVA × 0.40 = 26.50 kVA
Total Socket Demand: 7.36 + 26.50 = 33.86 kVA 7.36 + 26.50 = 33.86\text{ kVA} 7.36 + 26.50 = 33.86 kVA
Diversified HVAC (100% No Diversity): S hvac = 70.59 kVA ( 60.00 kW ) S_{\text{hvac}} = 70.59\text{ kVA} \quad (60.00\text{ kW}) S hvac = 70.59 kVA ( 60.00 kW )
Diversified Water Heaters (100%): S wh = 12.00 kVA ( 12.00 kW ) S_{\text{wh}} = 12.00\text{ kVA} \quad (12.00\text{ kW}) S wh = 12.00 kVA ( 12.00 kW )
Diversified Water Pumps (1 Duty @ 100%, 1 Standby @ 0%): S pump = 1 × 7.5 kW 0.85 + 0 = 8.82 kVA S_{\text{pump}} = 1 \times \frac{7.5\text{ kW}}{0.85} + 0 = 8.82\text{ kVA} S pump = 1 × 0.85 7.5 kW + 0 = 8.82 kVA Total Diversified Maximum Demand (MD) = 13.20 + 33.86 + 70.59 + 12.00 + 8.82 = 138.47 kVA \text{Total Diversified Maximum Demand (MD)} = 13.20 + 33.86 + 70.59 + 12.00 + 8.82 = 138.47\text{ kVA} Total Diversified Maximum Demand (MD) = 13.20 + 33.86 + 70.59 + 12.00 + 8.82 = 138.47 kVA
Step 3: Calculate System Demand Factor Demand Factor = Maximum Demand Connected Load = 138.47 kVA 193.84 kVA = 0.714 ( 71.4 % ) \text{Demand Factor} = \frac{\text{Maximum Demand}}{\text{Connected Load}} = \frac{138.47\text{ kVA}}{193.84\text{ kVA}} = 0.714 \quad (71.4\%) Demand Factor = Connected Load Maximum Demand = 193.84 kVA 138.47 kVA = 0.714 ( 71.4% )
Step 4: Compute Three-Phase Demand Line Current ( I demand I_{\text{demand}} I demand ) I demand = S demand × 1000 3 × 400 V = 138.47 × 1000 692.82 = 199.86 A I_{\text{demand}} = \frac{S_{\text{demand}} \times 1000}{\sqrt{3} \times 400\text{ V}} = \frac{138.47 \times 1000}{692.82} = 199.86\text{ A} I demand = 3 × 400 V S demand × 1000 = 692.82 138.47 × 1000 = 199.86 A
Step 5: Select Main Distribution Board Breaker & Feeder Cable
Main Incomer Protection Rating ( I n I_n I n ): Select standard MCCB rating immediately above I demand I_{\text{demand}} I demand ( 199.86 A 199.86\text{ A} 199.86 A ):
Select 250 A 250\text{ A} 250 A 3-Pole MCCB ( I n = 250 A I_n = 250\text{ A} I n = 250 A ).
Incoming Cable Sizing: Select 150 mm 2 150\text{ mm}^2 150 mm 2 4-core Cu/XLPE/SWA/LSZH cable ( I z ≥ 250 A I_z \ge 250\text{ A} I z ≥ 250 A ).