Study guide
8.5 Optional Dwelling and Multifamily Calculations
Alaska Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Alaska Certificates of Fitness, Law & Exam Logistics
1.1 The Alaska Certificate of Fitness System 1.2 Journeyman Eligibility: 8,000 Hours and How Alaska Counts Them 1.3 Trainee, Residential Wireman, Lineman, Provisional & Reciprocal Certificates 1.4 The Journeyman Examination: Format, Scheduling, Open-Book Rules & Retakes 1.5 Adopted Codes, Fees, Renewal, Inspection & Enforcement
2 Chapter 2: Using the 2020 NEC
2.1 Article 90: Purpose, Scope, Arrangement & Enforcement 2.2 Navigating the Code Book: Structure, Index & Tabbing Strategy 2.3 Article 100 Definitions You Must Know Cold 2.4 Electrical Theory for the Exam: Ohm's Law, Power & Three-Phase
3 Chapter 3: General Requirements — Article 110
3.1 Approval, Listing, Interrupting Rating & Terminations 3.2 Temperature Limitations of Terminations — 110.14(C) 3.3 Working Space, Access, Egress & Illumination — 110.26(A) through (D) 3.4 Dedicated Equipment Space, Guarding & Over-1000-Volt Installations
4 Chapter 4: Conductors and Ampacity — Article 310
4.1 Conductor Types, Insulation Markings & Table 310.16 4.2 Ambient Temperature Correction and Alaska's Cold 4.3 Adjustment for More Than Three Current-Carrying Conductors 4.4 Putting It Together: Full Conductor-Sizing Problems 4.5 Parallel Conductors, Dwelling Service Sizing & Conditions of Use
5 Chapter 5: Wiring Methods and Materials — NEC Chapter 3
5.1 Article 300 General Requirements and Underground Cover 5.2 Thermal Movement: Expansion Fittings and Table 352.44 5.3 Boxes and Enclosures: Box Fill and Pull Box Sizing 5.4 Cable Assemblies: NM, MC, AC, SE, UF and TC 5.5 Raceways: RMC, IMC, EMT, FMC, LFMC, PVC and ENT 5.6 Conduit Fill: Chapter 9 Tables and Annex C 5.7 Cable Trays, Wireways, Busways, Gutters and Surface Raceways
6 Chapter 6: Branch Circuits and Feeders
6.1 Branch-Circuit Ratings, Conductor Sizing & Multiwire Circuits 6.2 Required Outlets and Receptacle Spacing in Dwellings 6.3 GFCI Protection — Article 210.8 6.4 AFCI Protection and Receptacle Requirements 6.5 Feeders and Outside Branch Circuits — Articles 215 and 225 6.6 Grounded Conductor Identification, Switches & Panelboards
7 Chapter 7: Overcurrent Protection — Articles 240 and 242
7.1 Article 240 Fundamentals: Ratings, Locations & Conductor Protection 7.2 Feeder Tap Rules — 240.21(B) 7.3 Transformer Secondary Conductors — 240.21(C) 7.4 Fuses, Circuit Breakers, Series Ratings & Article 242 Surge Protection
8 Chapter 8: Services and Load Calculations
8.1 Service Conductors, Clearances and Service Equipment 8.2 Service Disconnects, the 2020 Rule Change, SPDs and Service GFPE 8.3 Article 220 Part II: General Lighting, Receptacles and Demand Factors 8.4 The Standard Dwelling Calculation — Article 220 Part III 8.5 Optional Dwelling and Multifamily Calculations 8.6 Commercial and Industrial Load Calculations 8.7 Neutral Load Calculations and Harmonics — 220.61
9 Chapter 9: Grounding and Bonding — Article 250
9.1 System Grounding, 250.24 and the Main Bonding Jumper 9.2 The Grounding Electrode System — 250.50 through 250.53 9.3 Grounding Electrode Conductor Sizing and Installation 9.4 Bonding: Services, Metal Piping, Structural Metal and Other Systems 9.5 Equipment Grounding Conductors: Types, Sizing and Continuity 9.6 Separately Derived Systems and Separate Buildings 9.7 Ground-Fault Protection of Equipment and Grounding of Specific Equipment
10 Chapter 10: Equipment for General Use — NEC Chapter 4
10.1 Flexible Cords, Cables and Fixture Wires 10.2 Switches, Receptacles and Industrial Control Panels 10.3 Luminaires, Lampholders and Recessed Installations 10.4 Appliances and Fixed Electric Space Heating 10.5 Deicing, Snow Melting, Pipeline and Vessel Heating 10.6 Motors Part I: Full-Load Current, Conductors and Overload Protection 10.7 Motors Part II: Short-Circuit Protection, Controllers, Disconnects and HVAC
11 Chapter 11: Transformers, Generators and Special Occupancies
11.1 Transformers — Article 450 11.2 Generators, Storage Batteries and Energy Storage Systems 11.3 Hazardous (Classified) Locations — Articles 500 through 506 11.4 Garages, Hangars, Fuel Dispensing, Bulk Storage and Spray Application 11.5 Health Care Facilities — Article 517 11.6 Agricultural Buildings, Manufactured Homes, RV Parks and Marinas 11.7 Assembly, Theaters, Carnivals, Temporary Installations and Pools
12 Chapter 12: Special Equipment, Special Conditions and Exam Strategy
12.1 Signs, Cranes, Elevators, Electric Vehicle Charging and Welders 12.2 Solar Photovoltaic, Interconnection and Stand-Alone Systems 12.3 Wind Electric Systems and Fire Pumps 12.4 Emergency, Legally Required Standby, Optional Standby and COPS 12.5 Class 1, 2 and 3 Circuits, Fire Alarm, Optical Fiber and Communications 12.6 Cold-Climate Practice in Alaska: Code Basis and Engineering Judgment 12.7 Exam-Day Strategy: Navigation, Calculation Workflow and Time Management
8.5 Optional Dwelling and Multifamily Calculations
Key Takeaways Explain This Topic AI
NEC 220.82 permits an optional calculation for a one-family dwelling served by a single 120/240-volt or 208Y/120-volt set of service or feeder conductors with an ampacity of 100 amperes or greater.
NEC 220.82(B) totals the general loads and applies 100 percent to the first 10 kVA and 40 percent to the remainder, then adds the largest heating or air-conditioning selection from 220.82(C).
NEC 220.82(C) requires the largest of six specified heating and cooling values, including 100 percent of air conditioning, 100 percent of heat pump compressors, 65 percent of central electric space heating, and 40 percent of separately controlled electric space heating with four or more units.
NEC 220.83 covers additional loads in existing dwelling units, applying 100 percent to the first 8 kVA and 40 percent to the remainder where no additional heating or air conditioning is installed.
NEC 220.84 permits an optional calculation for a multifamily dwelling of three or more units where each unit is equipped with electric cooking and either electric space heating, air conditioning, or both, using the demand factors of Table 220.84.
Last updated: August 2026
When the Optional Method May Be Used — 220.82(A)
This section applies to a dwelling unit having the total connected load served by a single 120/240-volt or 208Y/120-volt set of 3-wire service or feeder conductors with an ampacity of 100 amperes or greater . It shall be permissible to calculate the feeder and service loads in accordance with this section instead of the method specified in Part III of this article.
Three gates: one dwelling unit, a single 3-wire 120/240 V or 208Y/120 V supply, and 100 amperes or greater . A 60-ampere cabin service must use the standard method.
The General Load — 220.82(B)
The general calculated load shall be not less than 100 percent of the first 10 kVA plus 40 percent of the remainder of the following:
1500 volt-amperes for each 2-wire, 20-ampere small-appliance branch circuit and each laundry branch circuit;
3 volt-amperes per square foot of floor area for general lighting and general-use receptacles, using outside dimensions and excluding open porches, garages, and unused or unfinished spaces not adaptable for future use;
The nameplate rating of the following:
- all appliances that are fastened in place, permanently connected, or located on a specific circuit;
- ranges, wall-mounted ovens, counter-mounted cooking units;
- clothes dryers not connected to the laundry branch circuit;
- water heaters;
The nameplate ampere or kVA rating of all permanently connected motors not included in item 3.
Notice how much simpler this is: nameplate ratings , not Table 220.55 demand values. The range goes in at its full nameplate, and the 40-percent factor does the reducing.
Heating and Air Conditioning — 220.82(C)
Include the largest of the following six:
100 percent of the nameplate rating of the air conditioning and cooling;
100 percent of the nameplate rating of the heat pump when the heat pump is used without any supplemental electric heating;
100 percent of the nameplate rating of the heat pump compressor and 65 percent of the supplemental electric heating for central electric space-heating systems (if the heat pump compressor is prevented from operating at the same time as the supplemental heat, it does not need to be added);
- 65 percent of the nameplate rating of electric space heating if less than four separately controlled units ;
- 40 percent of the nameplate rating of electric space heating if four or more separately controlled units ;
100 percent of the nameplate ratings of electric thermal storage and other heating systems where the usual load is expected to be continuous at the full nameplate value.
Items 4 and 5 matter greatly in Alaska: four or more separately controlled baseboard heaters drop the heating load to 40 percent , whereas one or two zones sit at 65 percent. Baseboard heat with individual thermostats in every room is common in Alaska housing, and it qualifies for the 40 percent factor.
Worked Example — Optional Method
The same 2,400-square-foot Anchorage dwelling from section 8.4: two small-appliance circuits, one laundry circuit, a 12 kW range, a 5 kW dryer, a 4.5 kW water heater, a 1.2 kW dishwasher, a 0.9 kW disposal, a 1.5 kW trash compactor, and 12 kW of electric baseboard heat in six separately controlled zones. GENERAL LOADS, 220.82(B)
- Small appliance + laundry 3 x 1,500 = 4,500 VA
- General lighting 2,400 x 3 = 7,200 VA
- Range (nameplate) = 12,000 VA
- Dryer (nameplate) = 5,000 VA
- Water heater = 4,500 VA
- Dishwasher = 1,200 VA
- Disposal = 900 VA
- Trash compactor = 1,500 VA
- --------
- Total general load 36,800 VA
- First 10,000 VA at 100% = 10,000 VA
- Remaining 26,800 VA at 40% = 10,720 VA
- --------
- General load demand 20,720 VA
- HEATING, 220.82(C)(5)
- Six separately controlled units -> 40%
- 12,000 x 0.40 = 4,800 VA
- --------
- TOTAL CALCULATED LOAD 25,520 VA
Service current = 25,520 / 240 = 106.3 A
The standard method gave 154.7 amperes for the same house; the optional method gives 106.3 amperes . The optional method is nearly always smaller, which is why it dominates residential practice. Both are legal; the designer chooses.
A 125-ampere service would satisfy the optional calculation. In practice most builders install 200 amperes for future capacity, which is a design choice rather than a Code requirement — recall 90.1(B) : Code minimum is not necessarily adequate for future expansion.
Existing Dwelling Units — 220.83
This section applies where additional loads are being added to an existing dwelling unit , and the existing service or feeder is being evaluated.
220.83(A) Where Additional Air-Conditioning Equipment or Electric Space-Heating Equipment Is Not to Be Installed. The following percentages shall be used for existing and additional new loads:
- Load Percent of load
- First 8 kVA of load 100 percent
- Remainder of load 40 percent
Load calculation shall include: general lighting and receptacle loads at 3 VA per square foot; 1500 VA for each 2-wire, 20-ampere small-appliance and laundry branch circuit; the nameplate rating of all appliances fastened in place, ranges, ovens, cooking units, clothes dryers, and water heaters.
220.83(B) Where Additional Air-Conditioning Equipment or Electric Space-Heating Equipment Is to Be Installed. The following percentages apply:
- Load Percent
- Air-conditioning equipment 100
- Central electric space heating 100
- Less than four separately controlled space-heating units 100
- First 8 kVA of all other loads 100
- Remainder of all other loads 40
Note how the percentages harden when new heating or cooling is added — the Code stops assuming diversity for the equipment being added.
Multifamily Dwellings — 220.84
220.84(A) Feeder or Service Load. It shall be permissible to calculate the load of a feeder or service that supplies three or more dwelling units of a multifamily dwelling in accordance with Table 220.84 instead of Part III of this article if all of the following conditions are met:
- No dwelling unit is supplied by more than one feeder ;
- Each dwelling unit is equipped with electric cooking equipment ;
Each dwelling unit is equipped with either electric space heating, air conditioning, or both .
Exception to (2): where the calculated load for multifamily dwellings without electric cooking in Part III of this article exceeds that calculated under Part IV for the identical load plus electric cooking (based on 8 kW per unit), the lesser of the two loads shall be permitted.
220.84(C) Calculated Loads. The calculated load to which the demand factors of Table 220.84 apply shall include:
- 1500 volt-amperes for each 2-wire, 20-ampere small-appliance branch circuit and each laundry branch circuit;
- 3 volt-amperes per square foot for general lighting and general-use receptacles;
The nameplate rating of all appliances fastened in place, permanently connected, or located on a specific circuit, plus ranges, ovens, cooking units, clothes dryers, and water heaters;
The nameplate ampere or kVA rating of all permanently connected motors not included in item 3;
The larger of the air-conditioning load or the fixed electric space-heating load.
Table 220.84 Demand Factors decline steeply with unit count:
- Number of dwelling units Demand factor (percent)
- 3–5 45
- 6–7 44
- 8–10 43
- 11 42
- 12–13 41
- 14–15 40
- 16–17 39
- 18–20 38
- 21 37
- 22–23 36
- 24–25 35
- 26–27 34
- 28–30 33
- 31–33 32
- 34–36 31
- 37–38 30
- 39–42 29
- 43–45 28
- 46–50 27
220.85 Two Dwelling Units. Where two dwelling units are supplied by a single feeder and the calculated load under Part III exceeds that for three identical units calculated under 220.84, the lesser of the two loads shall be permitted.
Choosing a Method
Nothing in the Code requires you to use the smaller result. Both the standard and optional methods are legal, and the calculated load is a minimum . On an exam, read the question carefully: it will specify which method to use, and the answers will usually include the result of the other method as a distractor.