1.5 ADEM Drinking-Water Operating Rules (Division 335-7): Control Tests, Residuals, Pressure, Cross-Connections & Records
Alabama Water/Wastewater Operator Certification Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Alabama Regulations, Certification, Exams & Utility Administration
1.1 ADEM Division 335-10-1: Facility Classifications, Grades & Staffing Rules 1.2 Becoming Certified in Alabama: Exam Application, Operator Intern Status, Experience, Renewal & CEHs 1.3 Environmental Compliance, SDWA, Clean Water Act & NPDES Permits 1.4 Alabama's PSI-Delivered WPI Exams: Format, Grade Crosswalk & Need-to-Know Blueprints 1.5 ADEM Drinking-Water Operating Rules (Division 335-7): Control Tests, Residuals, Pressure, Cross-Connections & Records 1.6 Utility Administration: SOPs, Records, Security, Cybersecurity, Emergency Planning & Supervision
2 Chapter 2: Source Water, Wells, Coagulation, Filtration & Membranes
2.1 Source Water Hydrology, Groundwater vs. Surface Water & Protection 2.2 Coagulation Chemistry, Coagulants & Rapid Mixing Mechanics 2.3 Flocculation Basin Design, Clarification & Sedimentation 2.4 Granular Media Filtration, Head Loss & Backwash Protocols 2.5 Membrane Filtration: MF, UF, NF & RO Operation, Integrity Testing and Cleaning 2.6 Wells & Groundwater Systems: Construction, Pumps, Testing and Sanitary Protection (ADEM 335-7-5)
3 Chapter 3: Water Disinfection, Chemical Addition, Stabilization & Residuals
3.1 Chlorination Chemistry, Breakpoint Chlorination & Residuals 3.2 Disinfection Byproducts (DBPs), Stage 1/2 Rules & CT Compliance 3.3 Corrosion Control, Lead and Copper Rule & Fluoridation 3.4 Iron/Manganese Removal, Water Softening & Taste/Odor Control 3.5 Water Treatment Residuals: Sludge, Backwash Recycle & Plant Discharges
4 Chapter 4: Wastewater Preliminary & Primary Treatment
4.1 Wastewater Characteristics, Screening, Shredding & Grit Removal 4.2 Primary Sedimentation Basins, Scum Removal & Clarifier Performance
5 Chapter 5: Secondary Biological Treatment: Activated Sludge
5.1 Activated Sludge Microbiology, Basin Configurations & Aeration Systems 5.2 Process Control: F/M Ratio, MCRT/SRT & Sludge Settling Characteristics 5.3 Operational Troubleshooting (Bulking, Foaming, Pin Floc) & Process Modifications
6 Chapter 6: Fixed-Film Treatment, Lagoons, Nutrient Removal, Tertiary Filtration & Disinfection
6.1 Trickling Filters & Rotating Biological Contactors (RBCs) 6.2 Waste Stabilization Ponds, Aerated Lagoons & Alabama Grade I Lagoon Operations 6.3 Biological Nutrient Removal: Nitrification, Denitrification & Phosphorus Removal 6.4 Tertiary Filtration & Membrane Bioreactors (MBRs) 6.5 Wastewater Disinfection & Dechlorination: Chlorine, UV and Ozone
7 Chapter 7: Sludge Treatment, Biosolids & Odor Control
7.1 Sludge Thickening, Aerobic Digestion & Anaerobic Digestion 7.2 Mechanical Dewatering, Polymer Conditioning & EPA 503 Biosolids Regulations 7.3 Odor Control & Wastewater Chemical Addition
8 Chapter 8: Water Distribution Systems, Installation, Metering & Water Loss
8.1 Distribution Piping Materials, Valves & Finished Water Storage Facilities 8.2 Water Main Flushing, Disinfection Protocols (AWWA C651) & Water Quality Maintenance 8.3 Distribution Hydraulics, Pressure Control & Cross-Connection Prevention 8.4 Main & Service Installation, Tapping, Repair and Utility Locating (Alabama 811) 8.5 Meters, Water Loss Control, Asset Management & Customer Service
9 Chapter 9: Wastewater Collection Systems, Lift Stations & Sewer Maintenance
9.1 Gravity Collection Networks, Manhole Construction & Self-Cleansing Velocity Standards 9.2 Wastewater Lift Stations, Submersible Pumps, Force Mains & Inflow/Infiltration (I&I) 9.3 Sewer Cleaning, CCTV Inspection & SSO Response
10 Chapter 10: Laboratory Procedures, Sampling & Environmental Compliance
10.1 Drinking Water Laboratory Analysis: Turbidity, pH, Alkalinity & Coliform Testing 10.2 Wastewater Laboratory Testing: BOD5, COD, Total Suspended Solids & Settleability 10.3 Representative Sampling Protocols, Preservation, Chain of Custody & QA/QC
11 Chapter 11: Plant Equipment, Pumps, Motors & Instrumentation
11.1 Centrifugal and Positive Displacement Pumps: Operation, Cavitation & Packing/Seals 11.2 Electric Motors, Variable Frequency Drives, Flow Meters & SCADA Systems
12 Chapter 12: Safety: Chemicals, Confined Spaces & Field Hazards
12.1 Chemical Safety: Chlorine Gas Emergency Handling (Kits A & B) & Hydrogen Sulfide (H2S) Hazards 12.2 Permit-Required Confined Space Entry, Lockout/Tagout (LOTO) & Personal Protective Equipment 12.3 Field Safety: Work-Zone Traffic Control, Electrical Hazards, Fall Protection & Hazard Communication
13 Chapter 13: Water & Wastewater Mathematics: Hydraulics, Chemical Feed & Pumping
13.1 Flow Conversions, Geometry, Tank Volume & Detention Time Calculations 13.2 The Pounds Formula, Chemical Feed Rates & Solution Concentration Calculations 13.3 Pumping Math: Total Dynamic Head, Horsepower, Efficiency & Power Cost
14 Chapter 14: Water & Wastewater Mathematics: Treatment Process Calculations
14.1 Clarifier Surface Overflow Rate, Weir Loading & Granular Filter Loading Rates 14.2 Biological Calculations: F/M Ratio, MCRT Solids Balance & Sludge Volume Index (SVI)
1.5 ADEM Drinking-Water Operating Rules (Division 335-7): Control Tests, Residuals, Pressure, Cross-Connections & Records
Key Takeaways Explain This Topic AI
ADEM Admin. Code r. 335-7-10-.04 requires at least 0.2 mg/L free chlorine or 0.5 mg/L chloramines throughout the distribution system and no more than 4.0 mg/L chlorine or chloramines (0.8 mg/L chlorine dioxide).
A residual outside those limits that is not corrected within four hours is a treatment technique violation: notify ADEM by the end of the next business day and give public notice within 14 days.
Surface water and GWUDI plants must record finished-water disinfectant residual every other hour (continuous recording at 3,300 or more people) and each filter's turbidity every 15 minutes or continuously.
Rule 335-7-7-.02 requires a minimum of 20 psi at the customer's meter under all normal operating conditions.
Monthly operating reports are due to ADEM by the 10th of the following month and must be signed by a certified operator; ADEM must be notified within 24 hours if filtered surface water exceeds 1.0 NTU.
Last updated: October 2026
1.5 ADEM Drinking-Water Operating Rules (Division 335-7): Control Tests, Residuals, Pressure, Cross-Connections & Records
The WPI water exams test national practice and include an administrative content area on regulatory compliance, records and public notification. In Alabama, those duties come from ADEM's Water Supply Program rules, ADEM Admin. Code Division 335-7 (the version on ADEM's site is revised effective April 14, 2022 ). Rule 335-7-10-.02 ties the two programs together: community and non-transient non-community (NTNC) systems must employ operators certified under Division 10.
Required Water Quality Control Tests (Rule 335-7-10-.03)
These operational tests are in addition to monthly bacteriological compliance sampling and periodic chemical, radiological and DBP monitoring.
Surface water or GWUDI plant (during plant operation) Frequency
Disinfectant residual of finished water Every other hour; plants serving 3,300 or more people need continuous recording and indicating equipment
- Carbon dioxide of raw water Once per shift
- Color, iron, manganese and total alkalinity of raw and finished water Daily
- Fluoride Raw water weekly; finished water daily when fluoride is adjusted
- E. coli and total coliform of the raw source Monthly (or as ADEM requires), reported as counts per 100 mL
- pH of raw and finished water Each shift
Turbidity Raw water every other hour; each clarification unit every 4 hours; each filter every 15 minutes or continuously with a recording turbidimeter
- Groundwater plant Frequency
- Free chlorine residual of finished water from each source or plant At least daily
- Fluoride of finished water Daily, if adjusted
- Iron, raw and finished Daily when raw iron exceeds 0.3 mg/L
- Manganese, raw and finished Daily when raw manganese exceeds 0.05 mg/L
- pH of finished water Daily if a chemical is fed to adjust pH or the pH is below 7.0
- Raw water turbidity When ADEM directs or when turbidity exceeds 5.0 NTU
- Disinfectant Residual Rules (Rules 335-7-10-.04 and 335-7-5-.17)
Systems that disinfect must keep a residual that protects water throughout the distribution system . Using any disinfectant other than chlorination needs ADEM approval .
Minimum in the distribution system: 0.2 mg/L free chlorine or 0.5 mg/L chloramines .
Maximum at any point: 4.0 mg/L chlorine or chloramines and 0.8 mg/L chlorine dioxide.
If the residual falls below the minimum (or rises above the maximum) and is not corrected within four hours , a treatment technique violation has occurred. The system must correct the treatment, notify ADEM by the end of the next business day , and give notice to affected customers in a newspaper of general circulation within 14 days (NTNC systems post notices).
If the residual is not restored within 24 hours , collect bacteriological samples from the affected area. If they show contamination, the system has an acute violation with the matching public notice.
With ADEM approval, systems may temporarily raise chlorine or chloramine residuals (not chlorine dioxide) to respond to main breaks, storm runoff, source contamination or cross-connection events.
For groundwater, Rule 335-7-5-.17 requires a chlorine CT of at least 60 when average monthly turbidity is below 5 NTU and the source shows contamination risk, such as raw total coliform averaging above 20 but below 100 per 100 mL or raw fecal coliform or E. coli averaging above 5 but below 20 per 100 mL. The distribution residual must be measured and recorded daily.
Pressure and Hydraulics (Rule 335-7-7-.02)
A public water system must be designed and operated to supply at least 20 psi at the water system meter under all normal operating conditions . Projects that significantly affect hydraulics, such as new storage, sources, pump stations or main additions, need an ADEM permit before construction.
Cross-Connection Control (Chapter 335-7-9)
A system must be designed, installed, maintained and operated to prevent contamination through any service connection . Serving premises where cross-connections may exist is prohibited unless they are properly controlled, and any connection that could admit unapproved water needs ADEM approval.
A suitable backflow prevention device must be installed on each new service connection and on each customer connection replaced after January 1, 2006 (replacement means removing and reinstalling the meter and service line).
Community systems must formally adopt a written cross-connection control policy , provide it to customers on request, and run an inspection program , keeping records of health hazards found and corrective actions for at least five years .
The supplier must deny or discontinue service if a required device is not installed or properly maintained, until the problem is corrected to the satisfaction of the supplier and ADEM.
Reports (Rule 335-7-10-.06)
The monthly operating report is due by the 10th of the following month , contains the required control-test results and daily minimum disinfectant levels, and must be signed by a certified operator . Keep a copy available for inspection.
Chemical analysis records are due by the 10th of the month after the monitoring period ends.
Notify ADEM within 24 hours of filtered surface water above 1.0 NTU , finished groundwater above 5.0 NTU , a residual below 0.2 mg/L free chlorine or 0.5 mg/L chloramines , or potential waterborne disease outbreak.
Report any exceeded operational evaluation level for disinfection byproducts within 10 days after the end of the quarter.
Record Retention (Rule 335-7-10-.05)
- Record Keep at least
- Operational records of control tests 3 years or until the next sanitary survey, whichever is longer
- Daily shift log sheets at surface water or GWUDI plants 5 years
- Bacteriological analyses 5 years
- Chemical analyses 10 years
- Customer complaint file (date, location, type, action taken) 3 years after the complaint
- Actions taken to correct violations 3 years after the last action
- Sanitary survey and inspection reports 10 years
- Exemption records 5 years after the exemption expires
- Worked Scenario
At 6:00 a.m. a routine check at a dead-end tank site reads 0.1 mg/L free chlorine . The operator flushes the main and boosts the feed, and by 9:30 a.m. the residual is 0.4 mg/L. Because the residual was restored within four hours , no treatment technique violation occurred, but the low reading still must be documented and, under Rule 335-7-10-.06(4), reported to ADEM within 24 hours. Had the residual stayed low past four hours, the system would owe ADEM notice by the end of the next business day and public notice within 14 days; past 24 hours, it would also collect bacteriological samples from the affected area.