Study guide
2.6 Wells & Groundwater Systems: Construction, Pumps, Testing and Sanitary Protection (ADEM 335-7-5)
Alabama Water/Wastewater Operator Certification Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Alabama Regulations, Certification, Exams & Utility Administration
1.1 ADEM Division 335-10-1: Facility Classifications, Grades & Staffing Rules 1.2 Becoming Certified in Alabama: Exam Application, Operator Intern Status, Experience, Renewal & CEHs 1.3 Environmental Compliance, SDWA, Clean Water Act & NPDES Permits 1.4 Alabama's PSI-Delivered WPI Exams: Format, Grade Crosswalk & Need-to-Know Blueprints 1.5 ADEM Drinking-Water Operating Rules (Division 335-7): Control Tests, Residuals, Pressure, Cross-Connections & Records 1.6 Utility Administration: SOPs, Records, Security, Cybersecurity, Emergency Planning & Supervision
2 Chapter 2: Source Water, Wells, Coagulation, Filtration & Membranes
2.1 Source Water Hydrology, Groundwater vs. Surface Water & Protection 2.2 Coagulation Chemistry, Coagulants & Rapid Mixing Mechanics 2.3 Flocculation Basin Design, Clarification & Sedimentation 2.4 Granular Media Filtration, Head Loss & Backwash Protocols 2.5 Membrane Filtration: MF, UF, NF & RO Operation, Integrity Testing and Cleaning 2.6 Wells & Groundwater Systems: Construction, Pumps, Testing and Sanitary Protection (ADEM 335-7-5)
3 Chapter 3: Water Disinfection, Chemical Addition, Stabilization & Residuals
3.1 Chlorination Chemistry, Breakpoint Chlorination & Residuals 3.2 Disinfection Byproducts (DBPs), Stage 1/2 Rules & CT Compliance 3.3 Corrosion Control, Lead and Copper Rule & Fluoridation 3.4 Iron/Manganese Removal, Water Softening & Taste/Odor Control 3.5 Water Treatment Residuals: Sludge, Backwash Recycle & Plant Discharges
4 Chapter 4: Wastewater Preliminary & Primary Treatment
4.1 Wastewater Characteristics, Screening, Shredding & Grit Removal 4.2 Primary Sedimentation Basins, Scum Removal & Clarifier Performance
5 Chapter 5: Secondary Biological Treatment: Activated Sludge
5.1 Activated Sludge Microbiology, Basin Configurations & Aeration Systems 5.2 Process Control: F/M Ratio, MCRT/SRT & Sludge Settling Characteristics 5.3 Operational Troubleshooting (Bulking, Foaming, Pin Floc) & Process Modifications
6 Chapter 6: Fixed-Film Treatment, Lagoons, Nutrient Removal, Tertiary Filtration & Disinfection
6.1 Trickling Filters & Rotating Biological Contactors (RBCs) 6.2 Waste Stabilization Ponds, Aerated Lagoons & Alabama Grade I Lagoon Operations 6.3 Biological Nutrient Removal: Nitrification, Denitrification & Phosphorus Removal 6.4 Tertiary Filtration & Membrane Bioreactors (MBRs) 6.5 Wastewater Disinfection & Dechlorination: Chlorine, UV and Ozone
7 Chapter 7: Sludge Treatment, Biosolids & Odor Control
7.1 Sludge Thickening, Aerobic Digestion & Anaerobic Digestion 7.2 Mechanical Dewatering, Polymer Conditioning & EPA 503 Biosolids Regulations 7.3 Odor Control & Wastewater Chemical Addition
8 Chapter 8: Water Distribution Systems, Installation, Metering & Water Loss
8.1 Distribution Piping Materials, Valves & Finished Water Storage Facilities 8.2 Water Main Flushing, Disinfection Protocols (AWWA C651) & Water Quality Maintenance 8.3 Distribution Hydraulics, Pressure Control & Cross-Connection Prevention 8.4 Main & Service Installation, Tapping, Repair and Utility Locating (Alabama 811) 8.5 Meters, Water Loss Control, Asset Management & Customer Service
9 Chapter 9: Wastewater Collection Systems, Lift Stations & Sewer Maintenance
9.1 Gravity Collection Networks, Manhole Construction & Self-Cleansing Velocity Standards 9.2 Wastewater Lift Stations, Submersible Pumps, Force Mains & Inflow/Infiltration (I&I) 9.3 Sewer Cleaning, CCTV Inspection & SSO Response
10 Chapter 10: Laboratory Procedures, Sampling & Environmental Compliance
10.1 Drinking Water Laboratory Analysis: Turbidity, pH, Alkalinity & Coliform Testing 10.2 Wastewater Laboratory Testing: BOD5, COD, Total Suspended Solids & Settleability 10.3 Representative Sampling Protocols, Preservation, Chain of Custody & QA/QC
11 Chapter 11: Plant Equipment, Pumps, Motors & Instrumentation
11.1 Centrifugal and Positive Displacement Pumps: Operation, Cavitation & Packing/Seals 11.2 Electric Motors, Variable Frequency Drives, Flow Meters & SCADA Systems
12 Chapter 12: Safety: Chemicals, Confined Spaces & Field Hazards
12.1 Chemical Safety: Chlorine Gas Emergency Handling (Kits A & B) & Hydrogen Sulfide (H2S) Hazards 12.2 Permit-Required Confined Space Entry, Lockout/Tagout (LOTO) & Personal Protective Equipment 12.3 Field Safety: Work-Zone Traffic Control, Electrical Hazards, Fall Protection & Hazard Communication
13 Chapter 13: Water & Wastewater Mathematics: Hydraulics, Chemical Feed & Pumping
13.1 Flow Conversions, Geometry, Tank Volume & Detention Time Calculations 13.2 The Pounds Formula, Chemical Feed Rates & Solution Concentration Calculations 13.3 Pumping Math: Total Dynamic Head, Horsepower, Efficiency & Power Cost
14 Chapter 14: Water & Wastewater Mathematics: Treatment Process Calculations
14.1 Clarifier Surface Overflow Rate, Weir Loading & Granular Filter Loading Rates 14.2 Biological Calculations: F/M Ratio, MCRT Solids Balance & Sludge Volume Index (SVI)
2.6 Wells & Groundwater Systems: Construction, Pumps, Testing and Sanitary Protection (ADEM 335-7-5)
Key Takeaways Explain This Topic AI
ADEM requires community and NTNC well casings with at least a 2-inch annular space, pressure cement grouting, and a casing that projects at least 12 inches above a concrete slab of at least 3 feet by 3 feet.
A community well capacity test pumps at design capacity until the level stabilizes within plus or minus 1 foot, continues for 24 hours, then runs 6 hours at 150 percent of design capacity before recovery is recorded.
ADEM must be notified 14 days before a well is reconditioned by blasting or chemical additives.
With an air line, depth to water equals the air-line length minus the gauge pressure in psi times 2.31.
Abandoned wells must be filled and sealed, and the top 20 feet must be neat cement under Rule 335-7-5-.14.
Last updated: October 2026
2.6 Wells & Groundwater Systems: Construction, Pumps, Testing and Sanitary Protection (ADEM 335-7-5)
The WPI Water Distribution Class I outline includes "maintain well and related equipment" and "maintain the sanitary condition of the well," and every WPI Water Treatment outline includes measuring static and pumping water levels and inspecting groundwater sources for contamination, flooding and wellhead protection. In Alabama these tasks sit under ADEM's groundwater rules, ADEM Admin. Code Chapter 335-7-5 .
Well Components
- Component Purpose
- Casing Steel pipe that holds the hole open and seals out shallow water
Grout seal Cement in the annular space between casing and borehole that blocks surface water from running down the outside of the casing
- Screen and gravel pack Let water enter while holding back formation sand
- Sanitary well seal or cap Closes the top of the casing around the drop pipe and wiring
- Vent Lets air in and out as water levels change; screened and turned down
- Pitless adapter Below-frost side connection used with submersible pumps
- Raw-water sample tap Required for source sampling before any treatment
- Check valve, meter and pressure gauge Prevent backflow into the well and record flow and pressure
- Air line or level transducer Measures static and pumping water levels
- Well Pumps
Submersible pumps place the motor below the pump bowls in the well. The motor relies on water flowing past it for cooling, so a shroud is needed if the motor sits below the screen. Submersible motors are sensitive to frequent starts and voltage imbalance.
Vertical turbine (lineshaft) pumps have the motor at the surface turning a long shaft. Lineshafts are water-lubricated or oil-lubricated; oil must be food-grade and leaks contaminate the well.
The pump intake must stay submerged below the lowest expected pumping level , with margin for seasonal decline, to prevent air entrainment, cavitation and motor overheating.
ADEM Construction Rules (Rules 335-7-5-.03 to .05)
Site. The top of the casing must be above the 100-year flood plain and not subject to contamination or sinkhole subsidence , a real concern in Alabama's karst limestone areas.
Casing. Community and NTNC wells need unused steel casing meeting AWWA standards, with at least a 2-inch annular space around the casing. The casing's inside diameter should be at least 2 inches larger than the pump bowls , and the pump suction may not be placed in or below the screens.
Above grade. The casing must be centered and project at least 12 inches above the finished concrete slab , and the slab must be at least 3 feet by 3 feet .
Grouting. Community and NTNC well casings must be pressure cement grouted from the bottom up, continuously, until grout overflows at the surface, with at least 2 inches of grout around the casing. Non-community wells may use the tremie method with a 3-inch annular space, and wells deeper than 100 feet need at least 100 feet of grout seal.
Non-community wells may use NSF-approved PVC well casing (ASTM F480).
Testing a New Well (Rules 335-7-5-.07 to .11 and .15)
Aquifer test of a finished community production well determines storage coefficient and transmissivity , with drawdown readings every 2 minutes in the first hour and progressively less often afterward.
Development removes sand, cuttings and drilling fluid; the permanent pump may not be used for development.
Capacity test (community wells): pump at design capacity until the water level stabilizes within plus or minus 1.0 foot , continue for 24 hours , then pump at 150 percent of design capacity for 6 hours , then shut off and record recovery to the pre-test level. NTNC wells must hold a stable level at design capacity for at least 12 hours. The level may not be drawn down to the top of the uppermost water-bearing formation used.
Water quality : at least three chlorine-free bacteriological samples during the capacity test and at least two more after the permanent pump is installed and disinfected, plus full primary and secondary chemical analyses before final inspection. Sand content after start-up may not exceed 1 part per million .
Provisions must be made for periodic measurement of static and pumping water levels .
Measuring Water Level with an Air Line
An air line is a small tube of known length strapped to the drop pipe. Air is pumped in until the gauge reading stops rising; the gauge then reads the pressure of the water column above the bottom of the line. Depth to water (ft) = Air-line length (ft) − ( Gauge psi × 2.31 ) \text{Depth to water (ft)} = \text{Air-line length (ft)} - (\text{Gauge psi} \times 2.31) Depth to water (ft) = Air-line length (ft) − ( Gauge psi × 2.31 )
Example. A 120-foot air line reads 26 psi while the pump runs. The submerged length is 26 × 2.31 = 60.1 26 \times 2.31 = 60.1 26 × 2.31 = 60.1 feet, so the pumping water level is 120 − 60.1 = 59.9 120 - 60.1 = 59.9 120 − 60.1 = 59.9 feet below the reference point. If the static level was 41.0 feet, drawdown is 18.9 feet (Section 2.1 shows how to turn this into specific capacity).
Disinfection and the Ground Water Rule
New, repaired or reconditioned wells and pumps are disinfected (AWWA C654 describes the procedures), pumped to waste and sampled before use.
Rule 335-7-5-.17 requires a chlorine CT of at least 60 for groundwater sources with contamination risk when average turbidity is below 5 NTU, and a daily distribution residual of at least 0.2 mg/L free chlorine.
Under the federal Ground Water Rule (adopted in Rule 335-7-5-.22), a total coliform-positive routine distribution sample triggers source sampling of each well in use within 24 hours for a fecal indicator such as E. coli. A positive source sample leads to additional sampling or corrective action, which can include fixing sanitary defects, eliminating the source of contamination, using another source, or providing 4-log treatment of viruses .
Protecting and Rehabilitating Wells
Inspect regularly for cracked slabs, missing caps, unscreened vents, standing water, flooding and nearby contamination sources inside the wellhead protection area. Watch these trends:
Falling specific capacity or rising drawdown at the same pumping rate: screen encrustation, iron bacteria or sand plugging.
Sand in the water : screen or gravel-pack failure, or pumping too hard.
Rising motor amperage or vibration : pump wear or sand damage.
Rehabilitation may use acid, chlorine and surging. ADEM must be notified 14 days before reconditioning a well by blasting or chemical additives (Rule 335-7-5-.06), and water must be shown free of the additives before use. Abandoned wells must be filled and sealed, with neat cement in the top 20 feet (Rule 335-7-5-.14).