13.2 Leak Testing: Vacuum Box, Tracer Gas, Diesel & Air Pressure Tests
API 653 Aboveground Storage Tank Inspector Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: API 653 Scope, Inspector Certification & Roles
1.1 Scope of API 653, Tank Types & Construction Standards 1.2 Inspector Roles, Responsibilities & Certification Requirements 1.3 Inspection Planning, Safety, Confined Space Entry & Preparation
2 Chapter 2: Tank Shell & Roof Components Inspection
2.1 Fixed Roof Types, Structural Supports & Inspection Practices 2.2 Floating Roofs, Seals, Drainage & Operational Issues 2.3 Shell Courses, Welds, Attachments & Wind Girders 2.4 Tank Appurtenances, Nozzles, Manways & Piping Connections
3 Chapter 3: Tank Bottom & Foundation Inspection
3.1 Tank Bottom Types, Annular Plates & Internal Bottom Inspection 3.2 Foundation Types (Concrete Ringwall, Earth, Asphalt) & Inspection 3.3 Leak Detection Systems, Secondary Containment & Under-Tank Monitoring
4 Chapter 4: Corrosion & Damage Mechanisms in Storage Tanks
4.1 Atmospheric Corrosion, Condensation & External Deterioration 4.2 Corrosion Under Insulation (CUI) & Piping/Nozzle Interfaces 4.3 Soil-Side Corrosion, Under-Bottom Pitting & Microbiologically Induced Corrosion (MIC) 4.4 Product-Side Deterioration: Chemical Attack, Ethanol SCC, Concentration Cell & Sulfuric Acid Corrosion
5 Chapter 5: Materials, Toughness & Brittle Fracture Prevention
5.1 Tank Steels, Material Specifications & Historic Standards 5.2 Brittle Fracture Assessment: Figure 5.1 Decision Tree & Exemption Curves (API 653 Section 5) 5.3 Charpy V-Notch Impact Testing & Minimum Design Metal Temperature (MDMT)
6 Chapter 6: Cathodic Protection & Interior Linings
6.1 Cathodic Protection Principles & Systems for Tank Bottoms (API RP 651) 6.2 CP Criteria, Surveys, Potential Measurements & Interference (API RP 651) 6.3 Tank Bottom Interior Linings, Surface Prep & Inspection (API RP 652)
7 Chapter 7: Corrosion Rates, Remaining Life & Inspection Intervals
7.1 Determining Corrosion Rates (Short-Term vs. Long-Term) 7.2 Remaining Life Calculations & Limiting Components 7.3 Establishing In-Service & Out-of-Service Inspection Intervals (API 653 Section 6)
8 Chapter 8: Tank Shell Minimum Thickness Evaluation
8.1 Shell Minimum Thickness Calculations (tmin for Hydrostatic & Operating Levels) 8.2 One-Foot Method, Variable Design Point & Reconstructed-Tank Shell Thickness 8.3 Joint Efficiency (E) Selection, Missing Data & Radiography Factors 8.4 Evaluation of Pitting, Localized Thin Areas (LTA) & Critical Length (L)
9 Chapter 9: Bottom Plate & Annular Ring Thickness Evaluation
9.1 Minimum Bottom Thickness Formulations (MRT, MRTbottom, MRTlinear) 9.2 Annular Plate Evaluation, Stress Criteria & Critical Zones 9.3 Bottom Pitting Evaluation & Remaining Thickness Before Next Inspection
10 Chapter 10: Tank Repairs & Alterations Standards
10.1 Classification: Repair vs. Alteration vs. Reconstruction (API 653 Section 9) 10.2 Shell Plate Replacement, Lapped Patch Plates & Insert Plates 10.3 Shell Penetrations, Door Sheets & Nozzle Additions 10.4 Hot Tapping Requirements, Limitations & Pre-Engineering (API 653 Section 9.15 & API Publ 2201)
11 Chapter 11: Welding Procedures, Qualifications & Quality Control
11.1 Welding Procedure Specification (WPS) & Procedure Qualification Record (PQR) per ASME IX 11.2 Welder Performance Qualification (WPQ) & Continuity per ASME IX 11.3 Essential, Non-Essential & Supplementary Essential Variables 11.4 Preheating, Post-Weld Heat Treatment (PWHT) & Weld Flaw Remediation
12 Chapter 12: Nondestructive Examination (NDE) Methods
12.1 Visual Examination (VT) & Magnetic Particle Testing (MT) per ASME V 12.2 Liquid Penetrant (PT) & Ultrasonic Thickness Measurement (ASME V Article 6 & SE-797) 12.3 Radiographic Testing (RT): Acceptance Criteria, Film Interpretation & ASME V/API 650
13 Chapter 13: Hydrostatic Testing & Post-Repair Examination
13.1 Hydrostatic Test Triggers, Exemption Criteria & Major Alterations (API 653 Section 12.3) 13.2 Leak Testing: Vacuum Box, Tracer Gas, Diesel & Air Pressure Tests 13.3 NDE Examination Requirements for Shell, Bottom, Roof & Nozzle Welds (API 653 Section 12.1)
14 Chapter 14: Relief Devices, Tank Settlement & Nameplate Records
14.1 Pressure & Vacuum Relief Devices, Venting Principles (API RP 576 & API 2000) 14.2 Tank Settlement Types: Uniform, Tilt, Out-of-Plane & Edge Settlement (API 653 Annex B) 14.3 Evaluating Settlement Limits, Cosine Curve Analysis & Remedial Action 14.4 Tank Marking, Nameplates, Inspection Reports & Recordkeeping (API 653 Section 13)
13.2 Leak Testing: Vacuum Box, Tracer Gas, Diesel & Air Pressure Tests
Key Takeaways Explain This Topic AI
Vacuum box testing per API 650 Section 8.6 and ASME Section V Article 10 Appendix II serves as the primary code-mandated method for leak-testing tank bottom lap welds and internal corner fillet welds, operating at a partial vacuum of 21 kPa (3 psi / 6 in. Hg) to 35 kPa (5 psi / 10 in. Hg) gauge with a mandatory minimum 5-second dwell time.
A corner vacuum box featuring an angled 90-degree cross-section and specialized transparent viewing ports is required to inspect the critical interior shell-to-bottom fillet weld where standard flat-bottom boxes cannot seat.
Tracer gas leak testing (using helium or sulfur hexafluoride SF6) per ASME Section V Article 10 provides ultra-high sensitivity ( 10 − 6 10^{-6} 1 0 − 6 to 10 − 9 std cm 3 / s 10^{-9}\text{ std cm}^3/\text{s} 1 0 − 9 std cm 3 / s ) for bottom plate assemblies, detecting through-thickness micro-fissures underneath floors without individual box repositioning.
The diesel oil test evaluates unbacked shell-to-bottom fillet welds and nozzle attachments by applying diesel fuel to the exterior weld face for a minimum dwell time of 4 hours, inspecting the opposing interior face for capillary wicking or oil wetting.
Pneumatic air-and-soap testing of nozzle reinforcing pads is conducted at exactly 15 psig (100 kPa) through the telltale hole using an approved foaming solution; following test completion, the telltale hole must remain open and unobstructed to provide continuous pressure relief and leak indication.
Last updated: September 2026
Fundamentals of Leak Testing (LT) in Tank Integrity
While volumetric and surface NDE methods (such as RT, UT, MT, and PT) evaluate the structural soundness, geometry, and mechanical integrity of welded joints, Leak Testing (LT) is uniquely concerned with fluid containment—the absolute absence of through-thickness passages, pinholes, wormholes, or micro-cracks. Under API Standard 653 and API Standard 650 , leak testing is mandatory across all bottom lap welds, annular plate joints, shell-to-bottom corner fillets, nozzle reinforcement pads, and roof plate seams.
Leak testing methods applied to atmospheric storage tanks fall under four primary disciplines defined by ASME Section V, Article 10 (Leak Testing) :
Bubble Test – Vacuum Box Technique (Article 10, Appendix II / API 650 Section 8.6).
Tracer Gas Leak Testing – Sniffer Probe Technique (Article 10, Appendix IV).
Capillary Penetration – Diesel Oil Test .
Pneumatic Pressure Bubble Test (Nozzle Reinforcing Pads per API 650 Section 7.3.5 / API 653 Section 12.1.5).
Vacuum Box Testing per API 650 Section 8.6 & ASME Section V Article 10
Vacuum box testing is the ubiquitous field method for verifying the leak-tightness of flat bottom lap welds, sketch plates, and internal shell-to-bottom fillet welds. +-------------------------------------------------------------------------+
- | STANDARD FLAT VACUUM BOX SCHEMATIC |
- | |
- | Transparent Viewing Window |
- | +------------------------+ |
- | | [ Clear Acrylic ] | Pressure Gauge |
- | Air Evacuation | | (-3 to -5 psig) |
- | Valve / Venturi | | | |
- | +---+ +------------------------+ +---+ |
- | | | Handle | | |
- | =====+===+========================================+===+===== |
- | | Rigid Metal Frame (approx. 6" wide x 30" long) | |
- | +==========================================================+ |
- | | Thick Sponge Neoprene Rubber Gasket | |
- | +----------------------------------------------------------+ |
- | ........... Bubble-Forming Solution Across Weld ........... |
- | =======================[ Lap Weld ]========================= |
- | Tank Bottom Plate |
- +-------------------------------------------------------------------------+
- Equipment Construction and Assembly
A standard vacuum box consists of:
Box Housing : A rigid rectangular box, typically 6 inches (150 mm) wide by 30 inches (750 mm) long , fabricated from aluminum, steel, or molded fiberglass.
Viewing Window : A sealed, transparent acrylic or polycarbonate top window providing an unobstructed view of the entire test segment.
Bottom Seal : A thick, flexible, closed-cell sponge neoprene or silicone rubber gasket attached to the bottom rim to form an airtight seal against irregular steel floor plates.
Vacuum Gauge : A calibrated differential vacuum gauge reading in psi, kPa, or inches of mercury (Hg), with a range of 0 to -15 psig (0 to -100 kPa).
Evacuation Mechanism : An air ejector (pneumatic venturi aspirator driven by compressed plant air) or a portable electric vacuum pump, connected through an evacuation valve and equipped with an adjustable vacuum relief valve.
Operating Parameters & Code Constraints (API 650 Section 8.6)
Differential Pressure : The vacuum box must be evacuated to a partial vacuum of 21 kPa (3 psi / 6 in. Hg) to 35 kPa (5 psi / 10 in. Hg) gauge pressure.
Bubble-Forming Solution : An approved commercial foaming liquid (conforming to ASME Section V Article 10 and ASTM E515) is applied immediately prior to setting the box. The solution must produce durable, stable bubbles that do not rapidly burst or dry out under vacuum. Ordinary dish soap is technically prohibited unless qualified for bubble longevity and temperature stability.
Dwell Time : Once full test vacuum (21 to 35 kPa) is achieved, the weld must be visually observed through the transparent window for a minimum dwell time of 5 seconds . Any stream or cluster of growing bubbles indicates through-thickness air leakage.
Linear Overlap Requirement : To prevent untested gaps between adjacent box placements, each successive vacuum box placement must overlap the previously tested segment by at least 2 inches (50 mm) .
Surface Temperature Envelope : Standard bubble solutions operate between 40°F and 125°F (5°C to 52°C) . Testing outside this window requires certified low-temperature (antifreeze-doped) or high-temperature foaming solutions qualified per ASME Section V Article 10. +-------------------------------------------------------------------------+
- | CORNER VACUUM BOX FOR SHELL-TO-BOTTOM |
- | |
- | Vertical Tank Shell Plate |
- | | |
- | | Corner Vacuum Box (L-Shaped Profile) |
- | | +-----------------------------+ |
- | | | Angled Transparent Window | |
- | | | | |
- | | ===+-+ [Viewing Interior Fillet] | |
- | | |G | | |
- | | |A | | |
- | | |S | | |
- | | |K | | |
- | | |E | | |
- | | |T | | |
- | | ===+-------------------------------+=== |
- | | | Foam Gasket |G| |
- | =========+=====+===============================+=+============== |
- | Bottom | ^ Inside Shell-to-Bottom Corner |A| |
- | Plate | +-- Fillet Weld |S| |
- | | |K| |
- +--------------+-------------------------------------+-------------------+
- Specialized Corner Vacuum Box
The internal shell-to-bottom fillet weld presents a 90-degree geometry where a flat box cannot seal. A specialized corner vacuum box is utilized. It features an L-shaped or angled profile with perpendicular sealing gaskets that conform simultaneously to the vertical shell and horizontal bottom plates. Due to restricted optical angles, the corner box requires integrated internal lighting or high-intensity external inspection lamps to clearly illuminate the fillet weld root and toes.
Tracer Gas Leak Testing per ASME Section V, Article 10
When tanks feature secondary containment liners, double bottoms, or thick bottom sketch plates where vacuum box testing is physically restricted or prone to false results, Tracer Gas Leak Testing provides an exceptionally sensitive alternative. +-------------------------------------------------------------------------+
- | TRACER GAS TESTING CONFIGURATION |
- | |
- | Sniffer Probe (< 1 in/sec scan) |
- | \ / |
- | \ / |
- | Mass Spectrometer | | |
- | Leak Detector =======+ +===== |
- | (MSLD Console) v |
- | =======================[ Lap Weld ]========================= |
- | Tank Bottom Plate | | |
- | v v Through-Wall Micro-fissures |
- | ............................................................ |
- | Helium / SF6 Tracer Gas Plenum Under Floor (2 to 5 psig) |
- | ============================================================ |
- | Foundation / Impervious Secondary Containment Liner |
- +-------------------------------------------------------------------------+
- Tracer Gas Methodology & Physics
Governed by ASME Section V, Article 10, Appendix IV (Helium Mass Spectrometer – Detector Probe Technique) :
Gas Injection : A tracer gas—predominantly Helium (He) or Sulfur Hexafluoride ( S F 6 SF_6 S F 6 ) diluted with dry air or nitrogen to a concentration of 5% to 10% by volume—is injected into the interstitial space beneath the tank floor via temporary sub-floor pipes or foundation telltale ports.
Positive Pressure : The under-floor cavity is pressurized to a low positive pressure, typically 2 to 5 in. water column (up to 2 psig / 14 kPa) , ensuring the tracer gas permeates across the entire foundation contact surface.
Sniffer Probe Scanning : An operator sweeps a calibrated sniffer probe connected to a Mass Spectrometer Leak Detector (MSLD) or electron-capture detector along 100% of the bottom weld seams on the tank interior.
Scanning Parameters :
Scanning Speed : Must not exceed 1 inch per second (25 mm/s) .
Probe Distance : The probe tip must remain within 1 / 8 to 1 / 4 in. 1/8\text{ to }1/4\text{ in.} 1/8 to 1/4 in. ( 3 to 6 mm 3\text{ to }6\text{ mm} 3 to 6 mm ) of the weld seam.
Sensitivity : MSLD systems detect leak rates down to 10 − 6 10^{-6} 1 0 − 6 to 10 − 9 std cm 3 / s 10^{-9}\text{ std cm}^3/\text{s} 1 0 − 9 std cm 3 / s , several orders of magnitude more sensitive than bubble testing.
Operational Advantages of Tracer Gas
Micro-fissure Detection : Detects microscopic, labyrinthine leak paths through plate laminations and microporosities that cannot generate bubbles under 5 psi vacuum.
Full-Floor Coverage : Tests 100% of floor seams without repeated box repositioning, dramatically accelerating large-diameter turnaround schedules.
Zero Surface Residue : Eliminates soapy bubble solutions that must otherwise be meticulously scrubbed off before applying tank bottom epoxy liners.
Diesel Oil Capillary Testing & Pneumatic Pad Testing
In addition to vacuum and tracer methods, API 653 and API 650 mandate two specialized leak testing techniques for specific welded components:
1. The Diesel Oil Test (Capillary Wicking)
The diesel oil test utilizes the low surface tension, high wetting ability, and low viscosity of light petroleum distillates (diesel fuel or kerosene) to reveal through-wall capillary leaks in unbacked fillet and lap welds.
Target Welds : Primarily used on newly welded or repaired shell-to-bottom corner fillet welds (before the second pass or where backing prevents vacuum testing) and temporary attachment gouge excavations.
Execution Protocol : Clean diesel fuel is brushed or sprayed generously onto the exterior weld face and adjacent plate.
Dwell Time : The diesel must remain in continuous contact with the weld for a minimum dwell time of 4 hours (and preferably up to 12 hours in cold weather or heavy-wall assemblies).
Examination & Evaluation : The interior weld face is meticulously inspected under intense visual illumination ( ≥ 100 fc / 1000 lux \ge 100\text{ fc} / 1000\text{ lux} ≥ 100 fc /1000 lux ). Any dark oil wicking, dampness, or fluorescent sheen bleeding through to the inside indicates a rejectable through-wall defect.
Post-Cleaning : After testing, all residual diesel must be thoroughly flushed with volatile solvents to prevent contamination of subsequent coating systems.
2. Pneumatic Reinforcing Pad Testing (API 650 Section 7.3.5 & API 653 Section 12.1.5)
All newly installed or altered shell nozzle reinforcing pads and manway repads must undergo a pneumatic bubble test before tank commissioning. +-------------------------------------------------------------------------+
- | REINFORCING PAD PNEUMATIC TEST SETUP |
- | |
- | Tank Shell Plate |
- | | |
- | | Reinforcing Pad Plate (Repad) |
- | | +-------------------------+ |
- | | | Telltale Hole (NPT) | |
- | | | | | |
- | | | +-v-+ | |
- | | | | | <--- Regulated Compressed Air (15 psig) |
- | | ===+======+===+==============+=== |
- | | | Interstitial Annular Space | | |
- | | +----------------------------+ | |
- | | | Outer Fillet Weld | Nozzle Neck |
- | | | [Soaped for Bubbles] | Weld |
- | ======+==+===============================+==================== |
- | | |
- +-------------------------------------------------------------------------+
Test Setup : Clean compressed air is introduced into the interstitial space between the shell and reinforcing pad via the threaded telltale inspection hole (typically 1 / 4 -in. 1/4\text{-in.} 1/4 -in. or 1 / 2 -in. 1/2\text{-in.} 1/2 -in. NPT).
Test Pressure : Air pressure is regulated to exactly 15 psig (100 kPa / 1.0 bar) . A calibrated pressure gauge is installed in the test manifold.
Caution
Never exceed 15 psig during repad testing. Because a reinforcing pad presents a large planar surface area ( F o r c e = P r e s s u r e × A r e a Force = Pressure \times Area F orce = P ress u re × A re a ), excessive pneumatic pressure can easily bow the repad, tear the attachment fillet welds, or permanently deform the shell plate.
Leak Examination : While maintaining 15 psig, an approved bubble-forming solution is applied over 100% of the nozzle-to-shell weld (interior and exterior) and 100% of the repad-to-shell perimeter fillet weld . Any expanding soap bubbles indicate through-wall leakage.
Post-Test Telltale Hole Mandate : Upon successful test completion, the air connection is removed, and the telltale hole must remain open and completely unobstructed to the atmosphere . The hole may be lightly packed with soft grease or plugged with an unthreaded plastic dirt cap to prevent rainwater ingress, but it must NEVER be welded shut, plugged with a solid threaded metal plug, or coated over . If the internal shell weld leaks during operation, the open telltale hole safely vents product outward, alerting operators before the repad overpressurizes.
Master Comparison: Leak Testing Methodologies
The following table compares the operational characteristics, code references, differential pressures, dwell times, and sensitivities across the four principal storage tank leak testing methods.
Leak Testing Method Code Reference Test Medium / Vehicle Pressure / Differential Minimum Dwell Time Detection Sensitivity Primary Application Zones
Standard Vacuum Box API 650 Sec. 8.6 & ASME V Art. 10 App. II Air evacuation + foaming bubble solution 21 to 35 kPa (3 to 5 psi / 6 to 10 in. Hg) partial vacuum 5 seconds continuous observation Moderate ( 10 − 3 10^{-3} 1 0 − 3 to 10 − 4 std cm 3 / s 10^{-4}\text{ std cm}^3/\text{s} 1 0 − 4 std cm 3 / s ) Tank bottom lap seams, sketch plates, flat roof seams
Corner Vacuum Box API 650 Sec. 8.6 & ASME V Art. 10 App. II Air evacuation + foaming bubble solution 21 to 35 kPa (3 to 5 psi / 6 to 10 in. Hg) partial vacuum 5 seconds continuous observation Moderate ( 10 − 3 10^{-3} 1 0 − 3 to 10 − 4 std cm 3 / s 10^{-4}\text{ std cm}^3/\text{s} 1 0 − 4 std cm 3 / s ) Inside shell-to-bottom fillet weld (90° corner geometry)
Tracer Gas (Sniffer) ASME Section V, Article 10, Appendix IV Helium (He) or S F 6 SF_6 S F 6 (5-10% in air/N2) 2 to 5 in. w.c. (up to 2 psig / 14 kPa) under bottom Scan rate ≤ 1 in./sec \le 1\text{ in./sec} ≤ 1 in./sec ; probe ≤ 1 / 4 " \le 1/4" ≤ 1/4" Ultra-High ( 10 − 6 10^{-6} 1 0 − 6 to 10 − 9 std cm 3 / s 10^{-9}\text{ std cm}^3/\text{s} 1 0 − 9 std cm 3 / s ) Entire bottom floor, double bottoms, secondary containment
Diesel Oil Test API 650 Sec. 7.3.5 & API 653 Sec. 12.1.6 Clean light diesel fuel / kerosene Capillary action (zero applied pressure) 4 hours minimum (up to 12 hours cold) High for tight cracks ( 10 − 4 std cm 3 / s 10^{-4}\text{ std cm}^3/\text{s} 1 0 − 4 std cm 3 / s ) Unbacked corner fillet welds, temporary attachment sites
Pneumatic Pad Test API 650 Sec. 7.3.5 & API 653 Sec. 12.1.5 Compressed air + bubble-forming solution Exactly 15 psig (100 kPa / 1.0 bar) Sufficient to soap & inspect 100% welds Moderate ( 10 − 3 std cm 3 / s 10^{-3}\text{ std cm}^3/\text{s} 1 0 − 3 std cm 3 / s ) Shell nozzle reinforcing pads, door sheet repads, manways