8.3 Supplemental & Emergency Heating Systems
Arkansas HVAC/R Contractor License Exam
Track your progress as you read
Finished sections get a check mark.
1 Arkansas HVAC/R Licensing Law, Board Rules & Administration
1.1 Arkansas HVAC/R Board Authority, Statutes & Definitions 1.2 License Classifications & Capacity Limitations 1.3 Registrant Requirements, Apprenticeship & Experience Verification 1.4 License Renewal, Continuing Education & Disciplinary Actions
2 HVAC Thermodynamics, Psychrometrics & Gas Laws
2.1 Principles of Heat Transfer & Thermodynamic Fundamentals 2.2 Psychrometric Chart Dynamics & Air Properties 2.3 Psychrometric Processes & Air Mixture Calculations 2.4 Gas Laws Applied to HVAC/R Systems
3 Heating and Cooling Load Calculations (Manual J & S)
3.1 ACCA Manual J Design Conditions & Thermal Envelopes 3.2 Peak Cooling Load Calculations: Sensible vs. Latent Heat Gain 3.3 Heating Load Calculations & Infiltration Rates 3.4 ACCA Manual S Equipment Selection & Verification
4 Ductwork Design, Sizing & SMACNA Standards (Manual D)
4.1 ACCA Manual D Airflow Fundamentals & External Static Pressure 4.2 Equal Friction & Static Regain Duct Sizing Methods 4.3 Duct Fittings, Equivalent Length & Dynamic Losses 4.4 SMACNA Duct Construction Standards & Joint Sealing
5 Air Distribution, Balancing & Ventilation Codes
5.1 Supply & Return Air Distribution Hardware (Grilles, Registers, Diffusers) 5.2 System Airflow Testing, Adjusting & Balancing (TAB) 5.3 Ventilation Standards: ASHRAE 62.1, 62.2 & 2021 IMC Ventilation Air
6 Mechanical Refrigeration Cycle & Components
6.1 The Vapor-Compression Refrigeration Cycle 6.2 Compressors & Operating Characteristics 6.3 Condensers & Evaporators 6.4 Metering Devices & Refrigerant Flow Controls 6.5 Refrigerant Line Sizing, Oil Return & Field Piping Practices
7 Refrigerants, Oils & EPA Section 608 Regulations
7.1 Refrigerant Chemistry, ASHRAE Standard 34 & A2L Transition 7.2 Lubricating Oils & System Compatibility 7.3 EPA Section 608 Regulatory Mandates & Recovery Standards 7.4 System Evacuation, Dehydration & Leak Detection
8 Air Conditioning & Heat Pump Systems
8.1 Residential & Commercial Split Systems and Package RTUs 8.2 Air-Source Heat Pumps & The Reversing Valve 8.3 Supplemental & Emergency Heating Systems 8.4 Dual-Fuel & Geothermal (Ground-Source) Heat Pump Systems
9 Gas Furnaces, Combustion Air & Venting (IFGC / IMC)
9.1 Gas Furnace Types, AFUE Ratings & Sequence of Operation 9.2 Gas Burners, Ignition Systems & Flame Safeguard Controls 9.3 Combustion Air Requirements (IFGC Chapter 3 / IMC Chapter 7) 9.4 Flue Gas Venting & Category I-IV Venting Systems
10 Boilers, Hydronics & Fuel Gas Piping
10.1 Hydronic Heating Systems, Low-Pressure Boilers & ASME Code 10.2 Hydronic Distribution, Circulator Pumps & Piping Loops 10.3 Fuel Gas Piping Materials, Sizing & Pressure Testing (IFGC Chapter 4) 10.4 Gas Regulators, Manifold Pressure & Gas Meter Sizing 10.5 Condensate Disposal, Piping Support & Mechanical Insulation
11 Electrical Fundamentals, Motors & Control Circuits
11.1 HVAC Electrical Fundamentals, Ohm's Law & Power Calculations 11.2 Single-Phase & Three-Phase Electric Motors in HVAC 11.3 Low-Voltage Control Circuits & Thermostats
12 National Electrical Code (NEC) for HVAC Equipment
12.1 NEC Article 440: Hermetic Refrigerant Motor-Compressors & Branch Circuits 12.2 Equipment Disconnecting Means & Overcurrent Protective Devices (OCPD) 12.3 Motor Branch Circuit Sizing & Conductor Ampacity (NEC Article 430 & Tables)
13 System Maintenance, Troubleshooting & Safety Standards
13.1 Systematic Mechanical & Electrical Troubleshooting 13.2 Airflow & Refrigerant Charge Diagnostics 13.3 Jobsite Safety, OSHA Standards & Personal Protective Equipment
14 Plan Reading, Estimating & HVAC/R Trade Math
14.1 Mechanical Plan Symbols, Schedules & Abbreviations 14.2 Architectural Scales, Dimensions & Quantity Takeoff 14.3 Material, Labor & Bid Estimating 14.4 Applied HVAC/R Trade Math & Unit Conversions
8.3 Supplemental & Emergency Heating Systems
Key Takeaways Explain This Topic AI
The Thermal Balance Point is the precise outdoor ambient temperature where building heat loss exactly matches heat pump heating capacity; below this temperature, supplemental heat must stage on to satisfy space conditions.
The Economic Balance Point is the outdoor temperature where the operational cost per delivered BTU of heat pump heating equals the cost of operating an auxiliary heating system, dictated by local utility rates and COP.
Supplemental (auxiliary) heat operates concurrently with the heat pump compressor during heavy heating loads and defrost cycles, whereas emergency heat completely locks out the compressor and relies 100% on electric resistance or auxiliary fossil fuels.
Electric resistance heat packages utilize staged nickel-chromium (Nichrome) elements sequenced by thermal bimetal sequencers and protected by primary automatic-reset high limits and secondary one-shot fusible links.
Electric heat output and airflow are mathematically verified using the sensible heat airflow formulas: kW = (CFM × Delta T) / 3160, and CFM = (Volts × Amps × 3.412) / (1.08 × Delta T).
Last updated: September 2026
8.3 Supplemental & Emergency Heating Systems
Note
The Thermal Realities of Air-Source Heat Pumps : An air-source heat pump faces a fundamental thermodynamic divergence as winter outdoor temperatures decline. As ambient air temperature drops, building heat loss accelerates linearly due to the widening temperature differential between indoor and outdoor air. Simultaneously, the heat pump's heating capacity declines because colder outdoor air is less dense, reducing refrigerant suction pressure, mass flow rate, and heat absorption. At a specific outdoor temperature, the heating capacity of the heat pump exactly matches the building's heat loss; below this point, auxiliary heat is essential to maintain indoor comfort. Designing, installing, and servicing heat pump systems requires precise mastery of balance point thermodynamics, staging sequencers, and electric heat engineering calculations.
Balance Points: Thermal vs. Economic Dynamics
Every heat pump installation is governed by two distinct operating thresholds: the Thermal Balance Point and the Economic Balance Point . Capacity / Load (BTU/hr)
- ^
- | / (Building Heat Loss Line)
- | /
- | SUPPLEMENTAL HEAT /
- | DEFICIENCY ZONE /
- | (Strip Heat) /
- | /
- | / HEAT PUMP CAPACITY CURVE
- | * <--- THERMAL BALANCE POINT (e.g., 30°F)
- | / \
- | / \
- | / \ EXCESS HEAT PUMP CAPACITY
- | / \ (Compressor Cycles or Modulates)
- | / \
- +-------------+-----------+-----------------------------> Outdoor Temp (°F)
- 0°F 30°F 65°F
- 1. The Thermal Balance Point
The Thermal Balance Point is the specific outdoor ambient temperature at which the heating output of the heat pump compressor exactly equals the total heat loss of the building structure:
Above the Thermal Balance Point : The heat pump provides 100% of the required space heating. In single-stage systems, the compressor cycles on and off via Stage 1 thermostat control; in inverter-driven systems, compressor speed modulates to match load.
At the Thermal Balance Point : The compressor operates at 100% continuous duty and perfectly satisfies the space heating demand without auxiliary assistance.
Below the Thermal Balance Point : Building heat loss exceeds the heat pump's thermodynamic capacity. The difference between building heat loss and heat pump capacity is the heating deficiency . This deficiency must be supplied by supplemental heating (typically electric resistance heat strips or a fossil fuel furnace).
In typical Arkansas residential construction, the thermal balance point ranges between 28°F and 35°F , depending on building insulation levels, window glazing, and equipment sizing.
2. The Economic Balance Point
The Economic Balance Point is the outdoor ambient temperature at which the operating cost of the heat pump equals the operating cost of an auxiliary heating system (such as natural gas or propane):
Because heat pump COP drops as ambient temperature plunges, the cost per delivered BTU of heat pump heat increases at lower temperatures.
The economic balance point is calculated by comparing fuel costs and electrical rates per 100,000 BTU of delivered heat : Cost per 100,000 BTU (Heat Pump) = 100 , 000 COP × 3 , 412 × Electric Rate ($/kWh) \text{Cost per 100,000 BTU (Heat Pump)} = \frac{100,000}{\text{COP} \times 3,412} \times \text{Electric Rate (\$/kWh)} Cost per 100,000 BTU (Heat Pump) = COP × 3 , 412 100 , 000 × Electric Rate ($/kWh) Cost per 100,000 BTU (Gas Furnace) = 100 , 000 AFUE × 100 , 000 × Fuel Rate ($/Therm) = Fuel Rate AFUE \text{Cost per 100,000 BTU (Gas Furnace)} = \frac{100,000}{\text{AFUE} \times 100,000} \times \text{Fuel Rate (\$/Therm)} = \frac{\text{Fuel Rate}}{\text{AFUE}} Cost per 100,000 BTU (Gas Furnace) = AFUE × 100 , 000 100 , 000 × Fuel Rate ($/Therm) = AFUE Fuel Rate
When electricity is expensive and natural gas is inexpensive, the economic balance point may occur at 35°F to 40°F , well above the thermal balance point.
Supplemental (Auxiliary) Heat vs. Emergency Heat
Technicians and contractors must understand the strict operational, electrical, and control distinctions separating supplemental heat from emergency heat :
Operating Parameter Supplemental (Auxiliary) Heat (AUX / W2) Emergency Heat (EM HEAT / E)
Thermostat Signal Energized automatically on Stage 2 call for heat (W2 / AUX) or during outdoor coil defrost (D) Manually selected by homeowner on thermostat switch or automatically engaged upon outdoor unit fault
Compressor Status OPERATING : Heat pump compressor and electric heat strips run simultaneously LOCKED OUT : Heat pump compressor and outdoor fan are completely de-energized
Heat Source Heat pump refrigeration loop + supplementary electric resistance elements 100% Electric Resistance Heat Strips (or backup fossil fuel furnace)
Design Function Bridges the capacity deficit below the thermal balance point and tempers defrost air Provides temporary emergency comfort heating when the outdoor unit compressor fails mechanical operation
Operating Cost Moderate efficiency (delivers combined COP of heat pump + 1.0 COP strips) Extremely High Operating Cost (pure 1.0 COP electric resistance heating)
Caution
Homeowner Emergency Heat Abuse : Homeowners frequently switch their thermostat to 'Emergency Heat' during mild winter weather under the mistaken belief that the system will heat faster. Because electric resistance heat operates at a COP of exactly 1.0 (compared to heat pump COPs of 2.5 to 3.8), running Emergency Heat continuously will double or triple monthly winter electric utility bills. Technicians should educate customers that Emergency Heat is reserved strictly for outdoor unit mechanical failures.
Electric Resistance Heat Strips & Safety Controls
Electric resistance auxiliary heating packages (commonly termed heat kits ) consist of open-wire nickel-chromium (Nichrome, 80% nickel / 20% chromium) alloy resistance coils suspended across ceramic insulators within a galvanized steel sheet-metal frame installed directly inside the air handler discharge plenum. [HEAT KIT PACK]--240 VAC Power
- |
- +-------------------------------+-------------------------------+
- | | |
- [ELEMENT BANK 1 (5 kW)] [ELEMENT BANK 2 (5 kW)] [BLOWER MOTOR INTERLOCK]
- | | |
- [SEQUENCER STAGE 1] [SEQUENCER STAGE 2] [M1-M2 Contacts]
- (Bimetal Disc / PTC) (15-45 Sec Delay) (Starts Blower)
- | | |
- [PRIMARY HIGH LIMIT] [PRIMARY HIGH LIMIT] [SECONDARY THERMAL FUSE]
- (Auto-Reset @ 140°F-160°F) (Auto-Reset @ 140°F-160°F) (One-Shot Melt @ 220°F)
- 1. Electric Heat Sequencers
If a 20 kW electric heat package energized all heating elements simultaneously, the sudden electrical inrush (over 83 Amps at 240V) would produce massive voltage drops, dimming neighborhood lighting and tripping transformer overcurrent protections. To prevent this, heat strips are staged using thermal sequencers :
Operating Principle : A sequencer consists of a low-voltage (24 VAC) solid-state PTC (positive temperature coefficient) resistive heater bonded to a bimetallic disc that operates heavy-duty electrical contacts (rated at 25 to 30 Amps at 240 VAC).
Timed Staging : When the thermostat energizes terminal W2, the sequencer heater warms up. After a 15- to 45-second delay , the bimetal disc snaps over, closing contacts M1-M2 to energize the indoor blower motor and the first 5 kW element. If additional heating is demanded, a secondary sequencer stage warms and closes contacts M3-M4 after an additional 30- to 60-second delay to bring on the second 5 kW element bank.
Blower Delay Off : When the thermostat call terminates, the sequencer heater de-energizes, but the bimetal disc takes 45 to 120 seconds to cool down. This keeps the blower running after the elements de-energize to scavenge residual heat from the plenum.
2. Dual-Level High-Temperature Safety Controls
Because electric heating coils operate at temperatures exceeding 1,200°F to 1,400°F , loss of airflow (e.g., failed blower motor, collapsed duct, or plugged air filter) presents an immediate structure fire hazard. Under UL 1995 and the International Mechanical Code (IMC § 908), electric duct heaters must incorporate two levels of temperature protection:
Primary High-Limit Switch (Automatic Reset) : A bimetallic disc switch mounted directly in the airstream adjacent to each element bank. If plenum air temperature exceeds 130°F to 160°F , the switch snaps open, interrupting line-voltage power to that specific heating element. As soon as the blower cools the switch below its reset differential (typically 110°F to 120°F), the contacts snap closed automatically.
Secondary Safety Cutoff (Thermal Fusible Link / One-Shot) : A calibrated thermal fuse or solder link wired in direct series with each heating element. If the primary high-limit fails (contacts weld shut) and plenum temperature exceeds 200°F to 250°F , the fusible link melts permanently open, breaking the circuit. Once opened, a thermal fusible link cannot be reset ; it must be physically replaced after the underlying airflow failure is rectified.
Sizing Calculations, Temperature Rise & Airflow Engineering
Mastering heating thermodynamics requires fluency with fundamental electrical and psychrometric formulas. Licensing examinations frequently test these relationships.
Fundamental Governing Equations
Electrical Power to Heat Equivalence : Power (Watts) = Volts × Amps \text{Power (Watts)} = \text{Volts} \times \text{Amps} Power (Watts) = Volts × Amps Power (kW) = Volts × Amps 1 , 000 \text{Power (kW)} = \frac{\text{Volts} \times \text{Amps}}{1,000} Power (kW) = 1 , 000 Volts × Amps Heat Output (BTU/hr) = kW × 3 , 412.14 \text{Heat Output (BTU/hr)} = \text{kW} \times 3,412.14 Heat Output (BTU/hr) = kW × 3 , 412.14
Voltage Derating Rule :
Electric resistance elements are pure resistive loads with fixed resistance ( R R R ). If a 240V-rated heater is operated on a 208V single-phase commercial supply , heating output drops by the square of the voltage ratio: W actual = W rated × ( V actual V rated ) 2 = W rated × ( 208 240 ) 2 = W rated × 0.751 W_{\text{actual}} = W_{\text{rated}} \times \left(\frac{V_{\text{actual}}}{V_{\text{rated}}}\right)^2 = W_{\text{rated}} \times \left(\frac{208}{240}\right)^2 = W_{\text{rated}} \times 0.751 W actual = W rated × ( V rated V actual ) 2 = W rated × ( 240 208 ) 2 = W rated × 0.751
(A 10 kW heater rated at 240V produces only 7.51 kW when connected to a 208V service!)
Sensible Airflow Heat Equation : Q sensible = 1.08 × CFM × Δ T Q_{\text{sensible}} = 1.08 \times \text{CFM} \times \Delta T Q sensible = 1.08 × CFM × Δ T
Where 1.08 = 60 min/hr × 0.075 lb/ft 3 × 0.24 BTU/lb ⋅ ∘ F 1.08 = 60\text{ min/hr} \times 0.075\text{ lb/ft}^3 \times 0.24\text{ BTU/lb}\cdot^\circ\text{F} 1.08 = 60 min/hr × 0.075 lb/ft 3 × 0.24 BTU/lb ⋅ ∘ F .
Rearranged for kW Capacity & Temperature Rise : kW × 3 , 412.14 = 1.08 × CFM × Δ T ⟹ kW = CFM × Δ T 3 , 159.39 ≈ CFM × Δ T 3 , 160 \text{kW} \times 3,412.14 = 1.08 \times \text{CFM} \times \Delta T \implies \text{kW} = \frac{\text{CFM} \times \Delta T}{3,159.39} \approx \frac{\text{CFM} \times \Delta T}{3,160} kW × 3 , 412.14 = 1.08 × CFM × Δ T ⟹ kW = 3 , 159.39 CFM × Δ T ≈ 3 , 160 CFM × Δ T Δ T = kW × 3 , 160 CFM \Delta T = \frac{\text{kW} \times 3,160}{\text{CFM}} Δ T = CFM kW × 3 , 160 CFM = kW × 3 , 160 Δ T = Volts × Amps × 3.412 1.08 × Δ T \text{CFM} = \frac{\text{kW} \times 3,160}{\Delta T} = \frac{\text{Volts} \times \text{Amps} \times 3.412}{1.08 \times \Delta T} CFM = Δ T kW × 3 , 160 = 1.08 × Δ T Volts × Amps × 3.412
- Step-by-Step Worked Field Problems
- Problem 1: Field Airflow (CFM) Verification via Electric Heat Delta-T
A technician tests an electric furnace during commissioning. Field electrical and temperature measurements reveal:
- Measured Line Voltage ( V V V ): 240 Volts 240\text{ Volts} 240 Volts
- Measured Total Heater Current ( I I I ): 41.6 Amps 41.6\text{ Amps} 41.6 Amps
- Return Air Dry-Bulb Temperature ( T ra T_{\text{ra}} T ra ): 68.0 ∘ F 68.0^\circ\text{F} 68. 0 ∘ F
- Supply Air Dry-Bulb Temperature ( T sa T_{\text{sa}} T sa ): 93.5 ∘ F 93.5^\circ\text{F} 93. 5 ∘ F
Step 1: Calculate Actual Heat Output (Watts & kW) Watts = 240 V × 41.6 A = 9 , 984 Watts = 9.984 kW \text{Watts} = 240\text{ V} \times 41.6\text{ A} = 9,984\text{ Watts} = 9.984\text{ kW} Watts = 240 V × 41.6 A = 9 , 984 Watts = 9.984 kW BTU/hr = 9 , 984 W × 3.41214 = 34 , 067 BTU/hr \text{BTU/hr} = 9,984\text{ W} \times 3.41214 = 34,067\text{ BTU/hr} BTU/hr = 9 , 984 W × 3.41214 = 34 , 067 BTU/hr
Step 2: Calculate Temperature Rise ( Δ T \Delta T Δ T ) Δ T = T sa − T ra = 93.5 ∘ F − 68.0 ∘ F = 25.5 ∘ F \Delta T = T_{\text{sa}} - T_{\text{ra}} = 93.5^\circ\text{F} - 68.0^\circ\text{F} = 25.5^\circ\text{F} Δ T = T sa − T ra = 93. 5 ∘ F − 68. 0 ∘ F = 25. 5 ∘ F
Step 3: Solve for System CFM CFM = kW × 3 , 160 Δ T = 9.984 × 3 , 160 25.5 = 31 , 549.44 25.5 = 1 , 237.2 CFM \text{CFM} = \frac{\text{kW} \times 3,160}{\Delta T} = \frac{9.984 \times 3,160}{25.5} = \frac{31,549.44}{25.5} = 1,237.2\text{ CFM} CFM = Δ T kW × 3 , 160 = 25.5 9.984 × 3 , 160 = 25.5 31 , 549.44 = 1 , 237.2 CFM
The air handler is circulating approximately 1,237 CFM (ideal for a 3-ton heat pump operating at ~400 CFM/ton).
Problem 2: Sizing Conductors & Circuit Breakers (NEC Article 424)
A technician installs a 10 kW supplemental electric heat package (rated 240V) with a 1/3 HP blower motor drawing 2.8 Amps FLA. Calculate the Minimum Circuit Ampacity (MCA) and the maximum Overcurrent Protective Device (MOPD) under the National Electrical Code (NEC Article 424.3(B)).
Step 1: Calculate Pure Heater Full-Load Amperes (FLA) I heater = 10 , 000 Watts 240 Volts = 41.67 Amps I_{\text{heater}} = \frac{10,000\text{ Watts}}{240\text{ Volts}} = 41.67\text{ Amps} I heater = 240 Volts 10 , 000 Watts = 41.67 Amps
Step 2: Apply the 125% Continuous Duty Sizing Factor Under NEC Article 424, fixed electric space heating equipment is classified as a continuous load (operated for 3 hours or more) and must be sized at 125%: MCA = ( 41.67 A × 1.25 ) + 2.8 A = 52.08 + 2.8 = 54.88 Amps \text{MCA} = (41.67\text{ A} \times 1.25) + 2.8\text{ A} = 52.08 + 2.8 = 54.88\text{ Amps} MCA = ( 41.67 A × 1.25 ) + 2.8 A = 52.08 + 2.8 = 54.88 Amps
Step 3: Conductor & Breaker Selection
Minimum conductor ampacity must equal or exceed 54.88 Amps . Referring to NEC Table 310.16 (75°C copper termination column), #6 AWG THHN Copper wire (rated 65 Amps) is required.
Standard circuit breaker sizing (NEC 240.6) rounds up to the next standard protective device size: a 60 Ampere two-pole circuit breaker .
Realistic Trade Scenario: The Nuisance High-Limit Trip
A homeowner in Jonesboro, Arkansas, reports that their new 4-ton heat pump blows lukewarm air during cold winter mornings. During inspections, the technician observes that while the outdoor compressor runs normally, the supplemental 15 kW electric heat kit cycles ON for 90 seconds, shuts OFF for 3 minutes, and repeats continuously without ever warming the space.
Diagnostic Investigation :
The technician measures supply plenum temperature and observes it spiking to 155°F before an audible "click" disconnects the heat strips.
Checking with a digital clamp meter confirms that the primary automatic-reset high-limit switch is opening on over-temperature.
Static pressure testing across the air handler reveals an External Static Pressure (ESP) of 1.15 inches water column (vastly exceeding the equipment rating of 0.50 in. w.g.).
Inspection reveals a 4-inch high-MERV 16 pleated media filter that is completely matted with construction drywall dust, reducing system airflow from 1,600 CFM down to 750 CFM.
Resolution :
Because airflow was cut in half, the heat strips could not transfer their thermal energy into the circulating air stream ( Δ T = kW × 3 , 160 CFM \Delta T = \frac{\text{kW} \times 3,160}{\text{CFM}} Δ T = CFM kW × 3 , 160 ). Squeezing 15 kW across 750 CFM produced an unsustainable temperature rise of 63 ∘ F 63^\circ\text{F} 6 3 ∘ F , pushing plenum temperatures beyond the 150°F limit. Replacing the fouled filter restored airflow to 1,580 CFM, reducing plenum temperature rise to 30 ∘ F 30^\circ\text{F} 3 0 ∘ F and permanently resolving the limit trips.
Common Exam Traps & Key Distinctions
Exam Trap: Thermal vs. Economic Balance Point : The thermal balance point is where capacity equals load (pure physics). The economic balance point is where heating cost per BTU equals auxiliary fuel cost (utility rates and COP). They rarely occur at the same temperature.
Exam Trap: Emergency Heat Compressor Operation : Remember that under Emergency Heat (EM HEAT) , the heat pump compressor is strictly de-energized/locked out . If the compressor is running alongside electric heat, the system is in Supplemental/Auxiliary heating mode.
Exam Trap: 208V vs. 240V Derating : When sizing electric heat on commercial 208V circuits, do not assume 10 kW produces 10 kW. Always apply the voltage-squared factor: ( 208 / 240 ) 2 = 0.751 (208/240)^2 = 0.751 ( 208/240 ) 2 = 0.751 , resulting in a 25% capacity reduction.
Exam Trap: Continuous Duty Sizing (NEC 424) : Branch circuit conductors and overcurrent devices for fixed electric space heaters must be sized for 125% of the total load (heater Amps × 1.25 + motor Amps).