Study guide
1.1 ARE 5.0 PPD Format, Scoring & Case Study Navigation
ARE 5.0 Project Planning & Design PPD
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Overview & Schematic Design Process
1.1 ARE 5.0 PPD Format, Scoring & Case Study Navigation 1.2 The Schematic Design Phase & Multi-Discipline Workflow 1.3 Regulatory Framework: Navigating Codes, Standards & Jurisdictions
2 Chapter 2: Site Analysis, Topography & Soil Conditions
2.1 Site Topography, Grading, Slopes & Cut/Fill Calculations 2.2 Geotechnical Reports, Soil Classification & Foundation Selection 2.3 Site Hydrology, Drainage & Stormwater Management Neighborhood Context, Historic Settings & Site Integration
3 Chapter 3: Climate, Microclimate & Solar Design
3.1 Solar Geometry, Sun Angles & Sun Path Diagrams 3.2 Microclimate Analysis, Prevailing Winds & Passive Ventilation 3.3 Passive Solar Heating & Thermal Mass Strategies
4 Chapter 4: Sustainable Principles & Energy Standards
4.1 Daylighting Metrics: Spatial Daylight Autonomy (sDA) & Annual Sun Exposure (ASE) 4.2 Building Energy Standards: ASHRAE 90.1, IECC & Energy Use Intensity (EUI) 4.3 High-Performance Frameworks: LEED v4.1, Net Zero & Embodied Carbon
5 Chapter 5: Zoning Regulations & Land Use Controls
5.1 Zoning Envelopes: Setbacks, Floor Area Ratio (FAR) & Lot Coverage 5.2 Parking Requirements, Access & Site Circulation Planning 5.3 Environmental Regulations: Wetlands, Flood Zones & Brownfields
6 Chapter 6: Building Code Fundamentals: Occupancy & Construction Types
6.1 IBC Occupancy Classifications & Group Characteristics 6.2 Mixed Occupancy Strategies: Nonseparated, Separated & Accessory 6.3 IBC Construction Types I Through V & Fire-Resistance Ratings 6.4 Allowable Building Height & Area Calculations (IBC Tables 504 & 506)
7 Chapter 7: Means of Egress & Fire Protection
7.1 Occupant Load Determination & Egress Sizing (IBC Chapter 10) 7.2 Egress Components: Common Path, Travel Distance & Exit Separation 7.3 Passive Fire Protection: Fire Walls, Barriers & Smoke Partitions 7.4 Active Fire Suppression: Sprinklers, Standpipes & Fire Alarms
8 Chapter 8: Accessibility & Universal Design
8.1 Accessible Routes, Curb Ramps & Parking Layouts (ADA / ICC A117.1) 8.2 Interior Accessibility: Doors, Maneuvering Clearances & Corridors 8.3 Accessible Plumbing Facilities: Restrooms, Grab Bars & Fixture Layouts
9 Chapter 9: Structural Systems: Wood, Steel, Concrete & Masonry
9.1 Structural Selection & Spanning Rules of Thumb 9.2 Steel Framing Systems: Beams, Girders & Open-Web Joists 9.3 Concrete Framing Systems: One-Way, Two-Way & Post-Tensioned Slabs 9.4 Wood Systems: Light-Frame, Heavy Timber & Mass Timber (CLT)
10 Chapter 10: Lateral Force Resisting Systems & Foundations
10.1 Lateral Load Paths: Wind vs. Seismic Forces 10.2 Shear Walls, Braced Frames & Moment Frames 10.3 Shallow vs. Deep Foundation Systems: Footings, Mats, Piles & Caissons
11 Chapter 11: Building Envelope: Physics, Assemblies & Moisture Control
11.1 Envelope Thermal Performance: U-Values, R-Values & Thermal Bridging 11.2 Moisture Management: Vapor Retarders, Air Barriers & Water Resistive Barriers 11.3 High-Performance Wall & Roof Assemblies: Rainscreens & Inverted Roofs 11.4 Fenestration & Glazing: U-Factor, SHGC, Condensation Resistance & VT Interior Materials, Durability & Program Performance
12 Chapter 12: Mechanical & HVAC Systems
12.1 HVAC System Types: All-Air, Air-Water, All-Water & VRF Systems 12.2 Central Plant Equipment: Chillers, Boilers, Cooling Towers & Geothermal 12.3 Ductwork Distribution, Air Handling & Plenum Space Requirements 12.4 Indoor Air Quality, Ventilation Rates & ASHRAE 62.1 Baselines
13 Chapter 13: Plumbing, Electrical & Life Safety Systems
13.1 Domestic Water Supply & Pressure Boosting Systems 13.2 Sanitary Drainage, Venting & Fixture Count Calculations 13.3 Electrical Service, Transformers, Switchgear & Backup Generators 13.4 Lighting Design, Controls & Lighting Power Density (LPD) Limits
14 Chapter 14: Specialized Building Systems & Vertical Circulation
14.1 Architectural Acoustics: STC, NRC, RT60 & Noise Criteria (NC) 14.2 Elevator Systems: Traction vs. Hydraulic, Core Layout & Sizing 14.3 Building Telecommunications, Security & Building Automation Systems (BAS)
15 Chapter 15: Systems Integration & Coordination
15.1 Floor-to-Floor Height & Plenum Coordination (Structure + MEP + Architecture) 15.2 Structural Grid Planning & Spatial Adjacencies 15.3 Building Massing, Orientation & Envelope Integration 15.4 Case Study Strategy: Synthesizing Drawings, Code Sheets & Schedules
16 Chapter 16: Project Costs, Budgeting & Life-Cycle Analysis
16.1 Schematic Estimating Techniques: Area, Volume & Parametric Costs 16.2 Project Budgets: Contingencies, Overhead, Profit & Escalation 16.3 Life-Cycle Cost Analysis (LCCA) & Value Engineering
1.1 ARE 5.0 PPD Format, Scoring & Case Study Navigation
Key Takeaways Explain This Topic AI
The ARE 5.0 Project Planning & Design (PPD) division consists of 100 total items (91 scored and 9 pretest items) administered within a 4-hour, 5-minute active testing window.
NCARB's version-based Score Validity Policy preserves ARE 5.0 credit through delivery of the next exam version; future transition credits depend on NCARB's transition rules.
The current division and retake fee is $263; Record and jurisdiction fees are separate.
PPD may include up to nine case studies and up to twenty case-study items, with one or two resources per case under the 2026 format.
A 245-minute pacing plan must include review and be adjusted to the actual form; viewed questions lock when a break is confirmed.
Last updated: October 2026
What PPD Tests
Project Planning & Design (PPD) is one of the six divisions of NCARB's Architect Registration Examination (ARE 5.0). It tests preliminary site and building design: selecting and combining systems, responding to environmental and community conditions, applying codes, organizing a program, and evaluating costs. Project Development & Documentation (PDD) develops many of these decisions into detailed assemblies and documents. Passing PPD alone does not confer a license; candidates complete the requirements of their licensing jurisdiction.
This independent ExamFinch guide provides teaching and original practice checks. NCARB's current Guidelines and official practice exam establish the exam's content and delivery rules. The facts below were checked on October 17, 2026 against the Guidelines effective October 1, 2026.
Current Format and Logistics
Parameter Current NCARB information Study implication
Items 100 total: 91 scored and 9 pretest Treat every item as scored; pretest items are not identified.
Active testing 4 hours 5 minutes, or 245 minutes Average available time is 2.45 minutes per item.
Optional breaks 45 minutes total Review viewed items before activating a break.
Total appointment 5 hours Includes introductory and closing screens and optional break time; arrive for check-in as instructed.
Case studies Up to 9, containing up to 20 case-study items in total Expect several shorter scenarios rather than a fixed pair of large cases.
Delivery PSI test center or online proctoring Review the requirements for the selected delivery method before scheduling.
Division and retake fee $263 for each administration Record and jurisdiction fees are separate.
The April 27, 2026 update reduced each case study's resource set to one or two resources and reduced the number of items per case study. The overall division item count and testing time did not change. Case-study questions appear at the end of the form, but the Exam Summary tool allows candidates to visit them earlier. There is no requirement to complete all discrete items first.
NCARB provides an on-screen calculator, reference resources, and a digital whiteboard . Physical scratch paper is prohibited under the standard testing rules; an individually approved accommodation can have different terms. Practice calculations with the official tools so that unit conversions, notes, and diagram sketches do not depend on paper.
The Five Content Areas
Environmental Conditions & Context, 10–16% : Locate buildings and improvements using site analysis; select sustainable principles; respond to neighborhood conditions.
Codes & Regulations, 16–22% : Apply zoning, environmental regulations, and building codes; resolve the interaction of multiple applicable codes.
Building Systems, Materials, & Assemblies, 19–25% : Select MEP, structure, special systems, materials, and assemblies based on project requirements.
Project Integration of Program & Systems, 32–38% : Determine building configuration and integrate systems, program, environmental conditions, and context. This is the largest area.
Project Costs & Budgeting, 8–14% : Compare alternatives, evaluate estimates prepared by others, and assess initial and future costs.
The ranges describe typical forms, not guaranteed item counts on a particular administration. Study individual systems, then repeatedly ask what each choice changes elsewhere: a deeper girder affects ducts and height; a larger window affects glare, cooling loads, and costs; a relocated core affects travel distance and lateral stiffness. Use the later integration scenarios to practice those connections.
Current Item Types and Scoring
The current exam uses multiple choice , check-all-that-apply , and hotspot items. Multiple-choice questions can have three or four options. Check-all-that-apply items state how many responses to select; all required responses must be correct. Hotspot items ask you to select a location on an image. Drag-and-place items were retired April 28, 2025. Numeric calculations are still important, but a typed numeric fill-in response is not a current ARE item type.
Each scored item is worth one point, with no partial credit. NCARB evaluates the total division score against its passing standard; there is no requirement to pass each content section separately and no quota of candidates who must fail. Form difficulty is accounted for in scoring. A failing report includes diagnostic information and a scaled score; passing reports report a pass without a numeric scaled score. Use section feedback to direct study, rather than interpreting a practice percentage as a guaranteed passing score.
Breaks and Score Validity
When a break is confirmed, all previously viewed items lock , including unanswered items and items marked for review. They cannot be viewed or edited after the break. Unseen items remain available. The digital whiteboard remains available, but it does not restore access to locked questions. Review the current block before taking a break and avoid previewing questions you intend to leave until later.
NCARB replaced the five-year rolling clock with its version-based Score Validity Policy in 2023. Passed ARE 5.0 divisions remain valid while ARE 5.0 is delivered and establish applicable credits in the next version, which remain valid through that version. This does not promise that the future exam will retain identical division names or structure. Check NCARB and the licensing jurisdiction for requirements when planning a long testing timeline.
After a failed attempt, the same division can be retaken after 60 days, with no more than three administrations of that division in any 12-month period. This is three total attempts, not an initial attempt plus three retakes.
A Workable Pacing Example
Suppose a practice form has 80 discrete items and 20 case-study items. One possible 245-minute budget is:
- Work Budget
- Discrete items 160 minutes, averaging 2 minutes each
- Case-study items 70 minutes, averaging 3.5 minutes each
- Review 15 minutes, completed before any break that would lock those items
The sum is 245 minutes. Break time comes from the separate 45-minute allowance. These are planning assumptions, not NCARB recommendations or per-question limits. Some case items are quick lookups followed by simple reasoning; others require calculations. A five-minute average for 20 cases plus 160 minutes for discrete items would exceed available testing time. Adjust pacing using timed official practice and your own experience.
Start a new case by familiarizing yourself briefly with its scenario and available resources. Then read the question carefully, identify the relevant exhibit, and retrieve the necessary evidence. Recheck units, qualifiers, and the requested selection count. Do not assume every case has the same tabs, page count, or document hierarchy.
Worked Check: Egress Capacity
An original practice scenario gives a common corridor serving 400 people in a Group B/A building with qualifying NFPA 13 sprinkler protection and an emergency voice/alarm system. Assume the reduced factor for components other than stairs applies. Capacity width is 400 × 0.15 = 60 400\times0.15=60 400 × 0.15 = 60 inches. Compare that result with the applicable corridor minimum in IBC Table 1020.3; a 44-inch general minimum does not reduce the calculated 60-inch requirement. Actual layout, exits, door encroachments, and accessibility must also be checked before concluding the complete design complies.
Sources checked October 17, 2026: NCARB ARE 5.0 Guidelines , PPD division , fees , and 2026 case-study update .