Study guide

4.2 Building Energy Standards: ASHRAE 90.1, IECC & Energy Use Intensity (EUI)

ARE 5.0 Project Planning & Design PPD

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Overview & Schematic Design Process

1.1 ARE 5.0 PPD Format, Scoring & Case Study Navigation 1.2 The Schematic Design Phase & Multi-Discipline Workflow 1.3 Regulatory Framework: Navigating Codes, Standards & Jurisdictions

2 Chapter 2: Site Analysis, Topography & Soil Conditions

2.1 Site Topography, Grading, Slopes & Cut/Fill Calculations 2.2 Geotechnical Reports, Soil Classification & Foundation Selection 2.3 Site Hydrology, Drainage & Stormwater Management Neighborhood Context, Historic Settings & Site Integration

3 Chapter 3: Climate, Microclimate & Solar Design

3.1 Solar Geometry, Sun Angles & Sun Path Diagrams 3.2 Microclimate Analysis, Prevailing Winds & Passive Ventilation 3.3 Passive Solar Heating & Thermal Mass Strategies

4 Chapter 4: Sustainable Principles & Energy Standards

4.1 Daylighting Metrics: Spatial Daylight Autonomy (sDA) & Annual Sun Exposure (ASE) 4.2 Building Energy Standards: ASHRAE 90.1, IECC & Energy Use Intensity (EUI) 4.3 High-Performance Frameworks: LEED v4.1, Net Zero & Embodied Carbon

5 Chapter 5: Zoning Regulations & Land Use Controls

5.1 Zoning Envelopes: Setbacks, Floor Area Ratio (FAR) & Lot Coverage 5.2 Parking Requirements, Access & Site Circulation Planning 5.3 Environmental Regulations: Wetlands, Flood Zones & Brownfields

6 Chapter 6: Building Code Fundamentals: Occupancy & Construction Types

6.1 IBC Occupancy Classifications & Group Characteristics 6.2 Mixed Occupancy Strategies: Nonseparated, Separated & Accessory 6.3 IBC Construction Types I Through V & Fire-Resistance Ratings 6.4 Allowable Building Height & Area Calculations (IBC Tables 504 & 506)

7 Chapter 7: Means of Egress & Fire Protection

7.1 Occupant Load Determination & Egress Sizing (IBC Chapter 10) 7.2 Egress Components: Common Path, Travel Distance & Exit Separation 7.3 Passive Fire Protection: Fire Walls, Barriers & Smoke Partitions 7.4 Active Fire Suppression: Sprinklers, Standpipes & Fire Alarms

8 Chapter 8: Accessibility & Universal Design

8.1 Accessible Routes, Curb Ramps & Parking Layouts (ADA / ICC A117.1) 8.2 Interior Accessibility: Doors, Maneuvering Clearances & Corridors 8.3 Accessible Plumbing Facilities: Restrooms, Grab Bars & Fixture Layouts

9 Chapter 9: Structural Systems: Wood, Steel, Concrete & Masonry

9.1 Structural Selection & Spanning Rules of Thumb 9.2 Steel Framing Systems: Beams, Girders & Open-Web Joists 9.3 Concrete Framing Systems: One-Way, Two-Way & Post-Tensioned Slabs 9.4 Wood Systems: Light-Frame, Heavy Timber & Mass Timber (CLT)

10 Chapter 10: Lateral Force Resisting Systems & Foundations

10.1 Lateral Load Paths: Wind vs. Seismic Forces 10.2 Shear Walls, Braced Frames & Moment Frames 10.3 Shallow vs. Deep Foundation Systems: Footings, Mats, Piles & Caissons

11 Chapter 11: Building Envelope: Physics, Assemblies & Moisture Control

11.1 Envelope Thermal Performance: U-Values, R-Values & Thermal Bridging 11.2 Moisture Management: Vapor Retarders, Air Barriers & Water Resistive Barriers 11.3 High-Performance Wall & Roof Assemblies: Rainscreens & Inverted Roofs 11.4 Fenestration & Glazing: U-Factor, SHGC, Condensation Resistance & VT Interior Materials, Durability & Program Performance

12 Chapter 12: Mechanical & HVAC Systems

12.1 HVAC System Types: All-Air, Air-Water, All-Water & VRF Systems 12.2 Central Plant Equipment: Chillers, Boilers, Cooling Towers & Geothermal 12.3 Ductwork Distribution, Air Handling & Plenum Space Requirements 12.4 Indoor Air Quality, Ventilation Rates & ASHRAE 62.1 Baselines

13 Chapter 13: Plumbing, Electrical & Life Safety Systems

13.1 Domestic Water Supply & Pressure Boosting Systems 13.2 Sanitary Drainage, Venting & Fixture Count Calculations 13.3 Electrical Service, Transformers, Switchgear & Backup Generators 13.4 Lighting Design, Controls & Lighting Power Density (LPD) Limits

14 Chapter 14: Specialized Building Systems & Vertical Circulation

14.1 Architectural Acoustics: STC, NRC, RT60 & Noise Criteria (NC) 14.2 Elevator Systems: Traction vs. Hydraulic, Core Layout & Sizing 14.3 Building Telecommunications, Security & Building Automation Systems (BAS)

15 Chapter 15: Systems Integration & Coordination

15.1 Floor-to-Floor Height & Plenum Coordination (Structure + MEP + Architecture) 15.2 Structural Grid Planning & Spatial Adjacencies 15.3 Building Massing, Orientation & Envelope Integration 15.4 Case Study Strategy: Synthesizing Drawings, Code Sheets & Schedules

16 Chapter 16: Project Costs, Budgeting & Life-Cycle Analysis

16.1 Schematic Estimating Techniques: Area, Volume & Parametric Costs 16.2 Project Budgets: Contingencies, Overhead, Profit & Escalation 16.3 Life-Cycle Cost Analysis (LCCA) & Value Engineering

4.2 Building Energy Standards: ASHRAE 90.1, IECC & Energy Use Intensity (EUI)

Key Takeaways Explain This Topic AI

EUI normalizes annual energy by a stated floor-area boundary; site and source accounting use different factors.

Prescriptive and performance compliance use edition-specific requirements and cannot be mixed casually.

Material, assembly and whole-building air-leakage tests answer different questions.

Compare installed lighting power with the selected method’s allowance and independently meet control requirements.

Last updated: October 2026

Building Energy Metrics: Site EUI vs. Source EUI

Energy benchmarking is the core quantitative mechanism used in the ARE 5.0 Project Planning & Design (PPD) division to assess schematic building performance, verify code compliance, and track decarbonization goals.

Defining Energy Use Intensity (EUI)

Energy Use Intensity (EUI) expresses a building's annual energy consumption relative to its gross conditioned floor area. It functions as the building equivalent of "miles per gallon," allowing architects to compare the energy efficiency of buildings across varying scales, programs, and climates:

EUI = Total Annual Energy Consumed (kBtu) Gross Conditioned Floor Area (ft 2 ) [ kBtu ft 2 ⋅ year ] \text{EUI} = \frac{\text{Total Annual Energy Consumed (kBtu)}}{\text{Gross Conditioned Floor Area (ft}^2\text{)}} \quad \left[ \frac{\text{kBtu}}{\text{ft}^2\cdot\text{year}} \right] EUI = Gross Conditioned Floor Area (ft 2 ) Total Annual Energy Consumed (kBtu) ​ [ ft 2 ⋅ year kBtu ​ ]

In SI metric units, EUI is expressed as kilowatt-hours per square meter per year ( kWh / ( m 2 ⋅ year ) \text{kWh}/(\text{m}^2\cdot\text{year}) kWh / ( m 2 ⋅ year ) ). The conversion factor between the two units is:

1 kBtu / ft 2 ≈ 3.155 kWh / m 2 ⟺ 1 kWh / m 2 ≈ 0.317 kBtu / ft 2 1\text{ kBtu}/\text{ft}^2 \approx 3.155\text{ kWh}/\text{m}^2 \quad \Longleftrightarrow \quad 1\text{ kWh}/\text{m}^2 \approx 0.317\text{ kBtu}/\text{ft}^2 1 kBtu / ft 2 ≈ 3.155 kWh / m 2 ⟺ 1 kWh / m 2 ≈ 0.317 kBtu / ft 2

Site EUI vs. Source EUI: The Primary Energy Multiplier

Energy accounting distinguishes between where energy is metered versus where it is extracted and generated:

Site EUI: Measures the heat and electricity consumed directly within the building envelope, as reflected on monthly utility bills (electricity, natural gas, fuel oil, district steam).

Source EUI (Primary Energy): Traces energy consumption back to the raw fuel extraction source (coal, natural gas, uranium, hydro, wind, solar). It incorporates thermal conversion losses at the power plant, transmission grid resistance, and distribution pipeline losses.

The U.S. Environmental Protection Agency (EPA) ENERGY STAR program establishes national source-to-site conversion ratios:

Source Energy = ∑ ( Site Fuel Energy × Source-to-Site Ratio ) \text{Source Energy} = \sum \left( \text{Site Fuel Energy} \times \text{Source-to-Site Ratio} \right) Source Energy = ∑ ( Site Fuel Energy × Source-to-Site Ratio )

Fuel / Utility Type Source-to-Site Ratio Technical Basis for Multiplier

Grid Electricity (U.S. National Average) 2.80 2.80 2.80 Accounts for thermal power plant combustion efficiency ( 33 % − 40 % ~33\%-40\% 33% − 40% ) and transmission line resistance losses. Every 1 kBtu 1\text{ kBtu} 1 kBtu consumed at the plug requires 2.80 kBtu 2.80\text{ kBtu} 2.80 kBtu of primary fuel at the generator.

On-Site Natural Gas 1.05 1.05 1.05 Minimal pipeline compression and distribution leakage losses between extraction wellhead and building meter.

Fuel Oil (No. 2) 1.01 1.01 1.01 Refining and trucking delivery losses.

Purchased District Steam 1.20 1.20 1.20 Central boiler combustion losses and distribution pipe thermal dissipation.

Purchased District Chilled Water 0.91 0.91 0.91 Central high-efficiency water-cooled chiller plants operating with coefficients of performance (COP) exceeding typical distributed building equipment.

Note

Because grid electricity carries a source-to-site multiplier of 2.80 2.80 2.80 , reducing electrical loads (lighting power density, plug loads, chiller compressors) produces nearly three times the primary energy savings of reducing on-site natural gas heating loads. As electrical grids transition to wind, solar, and nuclear power, regional grid emission factors and source ratios decline toward parity.

Baseline EUIs Across Building Typologies & Architecture 2030 Targets

Building energy consumption varies dramatically based on occupancy schedule, internal heat gains, ventilation rates, and process loads.

Benchmark energy use against a documented dataset with matching use, climate, operating hours, area definition and reporting year. The illustrative EUI ranges below are planning comparisons, not verified current national medians. Mixed-use buildings require a consistent whole-building boundary or an appropriate weighted comparison.

The Architecture 2030 Challenge & The Zero Tool

Launched by architect Edward Mazria in 2006, the Architecture 2030 Challenge established stepped decarbonization targets for the global building sector, calling for all new buildings, developments, and major renovations to achieve net-zero carbon operations by the year 2030. The stepped reduction schedule benchmarks against the 2003 CBECS regional baseline:

2010: 60 % 60\% 60% reduction below baseline EUI

2015: 70 % 70\% 70% reduction below baseline EUI

2020: 80 % 80\% 80% reduction below baseline EUI

2025: 90 % 90\% 90% reduction below baseline EUI

2030: 100% reduction (Net Zero Carbon / Zero Fossil-Fuel Energy)

To facilitate target setting, Architecture 2030 developed the Zero Tool , an open-source web application that calculates baseline and target EUIs for specific building configurations based on location, climate zone, floor area, and programmatic space mix. Architects input schematic program areas into the Zero Tool to establish the exact EUI "not-to-exceed" energy budget during schematic design charrettes.

ASHRAE Standard 90.1 Structure: Mandatory Provisions

ANSI/ASHRAE/IES Standard 90.1 (Energy Standard for Buildings Except Low-Rise Residential Buildings) serves as the commercial reference standard referenced by the International Energy Conservation Code (IECC) and the International Building Code (IBC Chapter 13). Standard 90.1 is structured into mandatory provisions and compliance pathways.

Mandatory Provisions (Non-Negotiable Requirements)

Every building must comply with the mandatory provisions of Sections 5 through 10, regardless of whether the project pursues a prescriptive or performance-based compliance path:

Air-control requirements distinguish materials, assemblies and whole buildings. ASTM E2178 tests air permeance of a material; it is not a whole-building test. Whole-building leakage limits, test methods, exceptions and allowed compliance paths depend on the adopted energy code and edition. Do not substitute a material rating for field continuity of the assembled enclosure.

Economizer requirements depend on climate zone, system capacity, equipment type and code exceptions. Air-side systems use suitable outdoor air to reduce mechanical cooling; water-side systems use an alternate heat-rejection path. Confirm the applicable threshold and control sequence rather than applying a single capacity trigger nationally.

Demand-Controlled Ventilation (DCV): Spaces with high occupant density (exceeding 25 people per 1 , 000 sq ft 25\text{ people per }1,000\text{ sq ft} 25 people per 1 , 000 sq ft , such as auditoriums, lecture halls, and large meeting rooms) must incorporate CO 2 \text{CO}_2 CO 2 ​ sensors to modulate outdoor ventilation air based on real-time occupancy, curbing unnecessary winter heating and summer dehumidification of outdoor air.

Lighting Controls (Section 9.4): Buildings must include automatic interior lighting shutoff (occupancy sensors or scheduled programmable sweep), multi-level manual switching, and daylight-responsive controls that dim fixtures in primary and secondary daylight zones.

Prescriptive vs. Performance Compliance Pathways

Standard 90.1 provides three primary compliance methods for the building envelope and systems:

1. Prescriptive Path (Sections 5 through 10)

The Prescriptive Path requires every individual building component to meet or exceed specific criteria listed in code tables organized by climate zone:

Opaque Assemblies: Strict minimum thermal insulation levels (e.g., continuous insulation c i ci c i and cavity insulation R R R -values for mass walls, steel-framed walls, and roofs above deck).

Fenestration Limits: Maximum assembly U-factors and maximum Solar Heat Gain Coefficients (SHGC).

Window-to-Wall Ratio (WWR) Cap: Total vertical fenestration area cannot exceed 40 % 40\% 40% of the gross above-grade wall area .

Skylight Area Cap: Total skylight area cannot exceed 3 % 3\% 3% of the gross roof area (or up to 5 % 5\% 5% if at least 50 % 50\% 50% of the conditioned floor area lies in daylight zones with automated daylight controls).

No System Trade-Offs: Deficiencies in one component cannot be compensated for by exceeding requirements in another.

2. Building Envelope Trade-Off Method (Section 5.6)

Allows trade-offs strictly within the building envelope , comparing the proposed envelope's overall heat transmission ( U A UA U A ) against a code-compliant prescriptive envelope:

∑ ( U proposed × A proposed ) ≤ ∑ ( U prescriptive × A prescriptive ) \sum (U_{\text{proposed}} \times A_{\text{proposed}}) \le \sum (U_{\text{prescriptive}} \times A_{\text{prescriptive}}) ∑ ( U proposed ​ × A proposed ​ ) ≤ ∑ ( U prescriptive ​ × A prescriptive ​ )

For example, an architect may specify higher roof insulation ( R − 40 R-40 R − 40 vs. R − 30 R-30 R − 30 ) to offset a slightly poorer window U-factor. However, the vertical fenestration area must still remain ≤ 40 % \le 40\% ≤ 40% WWR.

3. Energy Cost Budget (ECB) Method (Section 11)

The Energy Cost Budget Method is a whole-building energy simulation performance pathway. An hourly energy modeling software (such as EnergyPlus or DOE-2) calculates the annual energy cost of the proposed building design and compares it against a standardized "Budget Design":

Annual Energy Cost proposed ≤ Annual Energy Cost budget \text{Annual Energy Cost}_{\text{proposed}} \le \text{Annual Energy Cost}_{\text{budget}} Annual Energy Cost proposed ​ ≤ Annual Energy Cost budget ​

The Budget Design: Has the identical footprint, floor area, exterior orientation, and operating schedule as the proposed building, but its envelope components, glazing ratios (capped at 40%), lighting systems, and HVAC efficiencies are set exactly to prescriptive baseline values.

System Trade-Offs Allowed: The ECB method permits cross-system trade-offs. An architect can specify an expansive 55 % 55\% 55% WWR curtain wall, provided the resulting thermal and solar penalties are completely offset by high-efficiency water-cooled magnetic bearing chillers, dedicated outdoor air systems (DOAS) with energy recovery wheels, or on-site renewable energy.

4. Appendix G: Performance Rating Method

ASHRAE 90.1 Appendix G provides a performance-rating method and, in applicable editions, a code-compliance pathway using the required performance target. It is not solely a voluntary beyond-code method. The baseline rules, target and permitted tradeoffs depend on the edition and project; use the supplied baseline and proposed models consistently.

Lighting Power Density (LPD) Calculation Methods

ASHRAE 90.1 Section 9 regulates the maximum allowable installed electrical lighting wattage within a building using two compliance methods:

1. Building Area Method

A simplified approach that assigns a single gross Lighting Power Density limit ( Watts per square foot \text{Watts per square foot} Watts per square foot , W/ft 2 \text{W/ft}^2 W/ft 2 ) to the entire building based on its predominant occupancy type:

Total Allowed Wattage = Gross Building Area (ft 2 ) × LPD building area \text{Total Allowed Wattage} = \text{Gross Building Area (ft}^2\text{)} \times \text{LPD}_{\text{building area}} Total Allowed Wattage = Gross Building Area (ft 2 ) × LPD building area ​

2. Space-by-Space Method

A granular calculation method that evaluates allowable lighting wattage room by room based on specific programmatic visual requirements. The architect multiplies the floor area of each distinct space type by its individual LPD allowance and sums them across the building:

Total Allowed Wattage = ∑ ( Area space i × LPD space i ) \text{Total Allowed Wattage} = \sum \left( \text{Area}_{\text{space } i} \times \text{LPD}_{\text{space } i} \right) Total Allowed Wattage = ∑ ( Area space i ​ × LPD space i ​ )

Wattage Trade-Off Flexibility: The space-by-space method allows interior designers to allocate higher lighting power to visually demanding spaces (boardrooms, design studios, feature lobbies) by utilizing low-power fixtures in circulation corridors, restrooms, and storage spaces, provided the total installed wattage does not exceed the calculated building-wide budget.

Additional Power Allowances: Unlocks extra wattage for decorative wall sconces, retail merchandise highlight displays, and whiteboard illumination.

Lighting-power allowances differ by edition and compliance method. For any exercise, take the explicitly supplied allowance, multiply by the corresponding area and compare with proposed installed watts. Confirm any exceptions, additional allowances and mandatory controls separately; an unverified table of room values is not a current code reference.

International Energy Conservation Code (IECC) Provisions

The International Energy Conservation Code (IECC) is organized into two separate books: IECC Residential and IECC Commercial (Chapter C4).

Section C406 (Additional Efficiency Package Options): In addition to satisfying prescriptive or performance envelope and MEP criteria, commercial projects must earn a prescribed number of efficiency credits from a menu of high-performance strategies:

More efficient HVAC performance ( 10 % − 15 % 10\%-15\% 10% − 15% above code).

Reduced Lighting Power Density ( 10 % − 15 % 10\%-15\% 10% − 15% below prescriptive limits).

Enhanced lighting controls (continuous dimming, digital occupancy sensors).

Dedicated Outdoor Air Systems (DOAS) with energy recovery.

On-site renewable energy systems (minimum 0.50 W/ft 2 0.50\text{ W/ft}^2 0.50 W/ft 2 of conditioned floor area).

Enhanced envelope thermal performance ( 15 % 15\% 15% UA reduction).

Automated fault detection and diagnostics (FDD).

Climatic Zone Variations (Zones 0 through 8): Regulates envelope insulation and glazing performance. Warm cooling-dominated climates (Zones 1-3) mandate low solar heat gain ( SHGC ≤ 0.25 \text{SHGC} \le 0.25 SHGC ≤ 0.25 ), whereas cold heating-dominated climates (Zones 5-8) mandate heavily insulated opaque assemblies ( R − 30 + R-30+ R − 30 + continuous roof insulation, R − 20 + R-20+ R − 20 + continuous wall insulation) and low fenestration U-factors ( U ≤ 0.28 − 0.36 U \le 0.28 - 0.36 U ≤ 0.28 − 0.36 ).

  • Worked Scenario: Middle School EUI & ASHRAE 90.1 Evaluation
  • Scenario Parameters

An architect is evaluating schematic energy targets for a new two-story middle school in Columbus, Ohio (ASHRAE Climate Zone 5A). The project parameters are:

Gross Conditioned Floor Area: 50 , 000 sq ft 50,000\text{ sq ft} 50 , 000 sq ft ( 4 , 645 m 2 4,645\text{ m}^2 4 , 645 m 2 )

Annual Utility Metering Forecast:

  • Grid Electricity: 350 , 000 kWh/year 350,000\text{ kWh/year} 350 , 000 kWh/year
  • On-Site Natural Gas: 12 , 000 therms/year 12,000\text{ therms/year} 12 , 000 therms/year

Vertical Gross Wall Area: 24 , 000 sq ft 24,000\text{ sq ft} 24 , 000 sq ft ; Proposed Glazing Area: 8 , 400 sq ft 8,400\text{ sq ft} 8 , 400 sq ft

Target Decarbonization Goal: 2025 Architecture 2030 target ( 90 % 90\% 90% reduction below baseline).

Step 1: Calculate Total Annual Site Energy in kBtu

Convert electric and gas units into thermal kBtu ( 1 kWh = 3.412 kBtu 1\text{ kWh} = 3.412\text{ kBtu} 1 kWh = 3.412 kBtu ; 1 therm = 100 kBtu 1\text{ therm} = 100\text{ kBtu} 1 therm = 100 kBtu ):

Electricity = 350 , 000 kWh × 3.412 kBtu/kWh = 1 , 194 , 200 kBtu \text{Electricity} = 350,000\text{ kWh} \times 3.412\text{ kBtu/kWh} = 1,194,200\text{ kBtu} Electricity = 350 , 000 kWh × 3.412 kBtu/kWh = 1 , 194 , 200 kBtu Natural Gas = 12 , 000 therms × 100 kBtu/therm = 1 , 200 , 000 kBtu \text{Natural Gas} = 12,000\text{ therms} \times 100\text{ kBtu/therm} = 1,200,000\text{ kBtu} Natural Gas = 12 , 000 therms × 100 kBtu/therm = 1 , 200 , 000 kBtu Total Annual Site Energy = 1 , 194 , 200 + 1 , 200 , 000 = 2 , 394 , 200 kBtu \text{Total Annual Site Energy} = 1,194,200 + 1,200,000 = 2,394,200\text{ kBtu} Total Annual Site Energy = 1 , 194 , 200 + 1 , 200 , 000 = 2 , 394 , 200 kBtu

Step 2: Calculate Site EUI

Site EUI = 2 , 394 , 200 kBtu 50 , 000 sq ft = 47.88 kBtu / ( ft 2 ⋅ yr ) \text{Site EUI} = \frac{2,394,200\text{ kBtu}}{50,000\text{ sq ft}} = 47.88\text{ kBtu}/(\text{ft}^2\cdot\text{yr}) Site EUI = 50 , 000 sq ft 2 , 394 , 200 kBtu ​ = 47.88 kBtu / ( ft 2 ⋅ yr )

Step 3: Calculate Source EUI

Apply national source-to-site conversion factors ( 2.80 2.80 2.80 for electricity, 1.05 1.05 1.05 for natural gas):

Source Electricity = 1 , 194 , 200 kBtu × 2.80 = 3 , 343 , 760 kBtu \text{Source Electricity} = 1,194,200\text{ kBtu} \times 2.80 = 3,343,760\text{ kBtu} Source Electricity = 1 , 194 , 200 kBtu × 2.80 = 3 , 343 , 760 kBtu Source Natural Gas = 1 , 200 , 000 kBtu × 1.05 = 1 , 260 , 000 kBtu \text{Source Natural Gas} = 1,200,000\text{ kBtu} \times 1.05 = 1,260,000\text{ kBtu} Source Natural Gas = 1 , 200 , 000 kBtu × 1.05 = 1 , 260 , 000 kBtu Total Source Energy = 3 , 343 , 760 + 1 , 260 , 000 = 4 , 603 , 760 kBtu \text{Total Source Energy} = 3,343,760 + 1,260,000 = 4,603,760\text{ kBtu} Total Source Energy = 3 , 343 , 760 + 1 , 260 , 000 = 4 , 603 , 760 kBtu Source EUI = 4 , 603 , 760 kBtu 50 , 000 sq ft = 92.08 kBtu / ( ft 2 ⋅ yr ) \text{Source EUI} = \frac{4,603,760\text{ kBtu}}{50,000\text{ sq ft}} = 92.08\text{ kBtu}/(\text{ft}^2\cdot\text{yr}) Source EUI = 50 , 000 sq ft 4 , 603 , 760 kBtu ​ = 92.08 kBtu / ( ft 2 ⋅ yr )

Step 4: Verify Window-to-Wall Ratio (WWR) & Code Path

WWR = 8 , 400 sq ft glazing 24 , 000 sq ft gross wall = 0.35 = 35.0 % \text{WWR} = \frac{8,400\text{ sq ft glazing}}{24,000\text{ sq ft gross wall}} = 0.35 = 35.0\% WWR = 24 , 000 sq ft gross wall 8 , 400 sq ft glazing ​ = 0.35 = 35.0%

Because the proposed WWR ( 35 % 35\% 35% ) is less than the prescriptive cap of 40 % 40\% 40% , the building envelope qualifies to pursue the straightforward Prescriptive Path of ASHRAE 90.1, provided all opaque assemblies meet Zone 5A prescriptive thermal minimums.

Numerical source-energy multipliers and EUI comparison values in worked examples are supplied assumptions, not universal current EPA factors. Use the dataset’s factors and gross-area definition consistently. Prescriptive glazing limits differ between ASHRAE 90.1 and IECC, with exceptions and alternative paths. C406 requirements also vary by edition; consult the adopted text rather than treating a credit menu or threshold as permanent.