Study guide

15.4 Case Study Strategy: Synthesizing Drawings, Code Sheets & Schedules

ARE 5.0 Project Planning & Design PPD

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Overview & Schematic Design Process

1.1 ARE 5.0 PPD Format, Scoring & Case Study Navigation 1.2 The Schematic Design Phase & Multi-Discipline Workflow 1.3 Regulatory Framework: Navigating Codes, Standards & Jurisdictions

2 Chapter 2: Site Analysis, Topography & Soil Conditions

2.1 Site Topography, Grading, Slopes & Cut/Fill Calculations 2.2 Geotechnical Reports, Soil Classification & Foundation Selection 2.3 Site Hydrology, Drainage & Stormwater Management Neighborhood Context, Historic Settings & Site Integration

3 Chapter 3: Climate, Microclimate & Solar Design

3.1 Solar Geometry, Sun Angles & Sun Path Diagrams 3.2 Microclimate Analysis, Prevailing Winds & Passive Ventilation 3.3 Passive Solar Heating & Thermal Mass Strategies

4 Chapter 4: Sustainable Principles & Energy Standards

4.1 Daylighting Metrics: Spatial Daylight Autonomy (sDA) & Annual Sun Exposure (ASE) 4.2 Building Energy Standards: ASHRAE 90.1, IECC & Energy Use Intensity (EUI) 4.3 High-Performance Frameworks: LEED v4.1, Net Zero & Embodied Carbon

5 Chapter 5: Zoning Regulations & Land Use Controls

5.1 Zoning Envelopes: Setbacks, Floor Area Ratio (FAR) & Lot Coverage 5.2 Parking Requirements, Access & Site Circulation Planning 5.3 Environmental Regulations: Wetlands, Flood Zones & Brownfields

6 Chapter 6: Building Code Fundamentals: Occupancy & Construction Types

6.1 IBC Occupancy Classifications & Group Characteristics 6.2 Mixed Occupancy Strategies: Nonseparated, Separated & Accessory 6.3 IBC Construction Types I Through V & Fire-Resistance Ratings 6.4 Allowable Building Height & Area Calculations (IBC Tables 504 & 506)

7 Chapter 7: Means of Egress & Fire Protection

7.1 Occupant Load Determination & Egress Sizing (IBC Chapter 10) 7.2 Egress Components: Common Path, Travel Distance & Exit Separation 7.3 Passive Fire Protection: Fire Walls, Barriers & Smoke Partitions 7.4 Active Fire Suppression: Sprinklers, Standpipes & Fire Alarms

8 Chapter 8: Accessibility & Universal Design

8.1 Accessible Routes, Curb Ramps & Parking Layouts (ADA / ICC A117.1) 8.2 Interior Accessibility: Doors, Maneuvering Clearances & Corridors 8.3 Accessible Plumbing Facilities: Restrooms, Grab Bars & Fixture Layouts

9 Chapter 9: Structural Systems: Wood, Steel, Concrete & Masonry

9.1 Structural Selection & Spanning Rules of Thumb 9.2 Steel Framing Systems: Beams, Girders & Open-Web Joists 9.3 Concrete Framing Systems: One-Way, Two-Way & Post-Tensioned Slabs 9.4 Wood Systems: Light-Frame, Heavy Timber & Mass Timber (CLT)

10 Chapter 10: Lateral Force Resisting Systems & Foundations

10.1 Lateral Load Paths: Wind vs. Seismic Forces 10.2 Shear Walls, Braced Frames & Moment Frames 10.3 Shallow vs. Deep Foundation Systems: Footings, Mats, Piles & Caissons

11 Chapter 11: Building Envelope: Physics, Assemblies & Moisture Control

11.1 Envelope Thermal Performance: U-Values, R-Values & Thermal Bridging 11.2 Moisture Management: Vapor Retarders, Air Barriers & Water Resistive Barriers 11.3 High-Performance Wall & Roof Assemblies: Rainscreens & Inverted Roofs 11.4 Fenestration & Glazing: U-Factor, SHGC, Condensation Resistance & VT Interior Materials, Durability & Program Performance

12 Chapter 12: Mechanical & HVAC Systems

12.1 HVAC System Types: All-Air, Air-Water, All-Water & VRF Systems 12.2 Central Plant Equipment: Chillers, Boilers, Cooling Towers & Geothermal 12.3 Ductwork Distribution, Air Handling & Plenum Space Requirements 12.4 Indoor Air Quality, Ventilation Rates & ASHRAE 62.1 Baselines

13 Chapter 13: Plumbing, Electrical & Life Safety Systems

13.1 Domestic Water Supply & Pressure Boosting Systems 13.2 Sanitary Drainage, Venting & Fixture Count Calculations 13.3 Electrical Service, Transformers, Switchgear & Backup Generators 13.4 Lighting Design, Controls & Lighting Power Density (LPD) Limits

14 Chapter 14: Specialized Building Systems & Vertical Circulation

14.1 Architectural Acoustics: STC, NRC, RT60 & Noise Criteria (NC) 14.2 Elevator Systems: Traction vs. Hydraulic, Core Layout & Sizing 14.3 Building Telecommunications, Security & Building Automation Systems (BAS)

15 Chapter 15: Systems Integration & Coordination

15.1 Floor-to-Floor Height & Plenum Coordination (Structure + MEP + Architecture) 15.2 Structural Grid Planning & Spatial Adjacencies 15.3 Building Massing, Orientation & Envelope Integration 15.4 Case Study Strategy: Synthesizing Drawings, Code Sheets & Schedules

16 Chapter 16: Project Costs, Budgeting & Life-Cycle Analysis

16.1 Schematic Estimating Techniques: Area, Volume & Parametric Costs 16.2 Project Budgets: Contingencies, Overhead, Profit & Escalation 16.3 Life-Cycle Cost Analysis (LCCA) & Value Engineering

15.4 Case Study Strategy: Synthesizing Drawings, Code Sheets & Schedules

Key Takeaways Explain This Topic AI

Current PPD case studies use smaller resource sets; practice with the official interface rather than assuming fixed tabs or page counts.

Use every explicit scenario fact and revision; no generic hierarchy makes a code matrix automatically override the narrative.

Keep net/gross boundaries, units, seating conditions and rounding rules consistent across calculations.

During door swing, preserve at least half the required egress width; the fully-open 7-inch encroachment test is separate.

Last updated: October 2026

Case Studies Apply the Same Design Knowledge

PPD case studies test applying project information to design decisions, not a separate body of technical rules. Current NCARB guidance allows up to nine case studies and up to twenty case-study items in the division. Following the April 27, 2026 change, each case has one or two resources. Do not prepare around an assumed pair of large, fixed-tab cases or a mandatory 30–60-page exhibit package. The official practice exam is the best way to learn the current interface.

A resource might supply a site plan, program, drawing, schedule or technical information. Read the scenario and question for the actual facts. The task may ask for the best configuration, a feasible system, a code-related result, a cost comparison or the consequence of changing an assumption. Multiple options can be broadly plausible while only one satisfies all stated requirements.

Retrieve Evidence Efficiently

Briefly orient yourself to the scenario and available resources, then identify what the item asks you to decide. Note qualifiers such as minimum , maximum , net , gross , at least , select all , or within the budget . Identify the relevant exhibit and read its legend, units, dates and notes. A dimension without a unit or a code value without its condition can produce a convincing but wrong calculation.

Use search when supported to find a distinctive term, but inspect the surrounding material. Searching for “area” may retrieve several unrelated values. A room-area schedule is different from zoning lot area or allowable building area. Return to the question after locating evidence and verify that the selected value answers that particular task.

Record short intermediate results on the digital whiteboard if useful. Physical scratch paper is not generally allowed except as authorized through an accommodation. NCARB's break rules lock previously viewed items after a break; complete any needed review of those items before confirming the break. Practice using the official tools rather than relying on an imagined interface.

Reconcile Documents Without Inventing a Hierarchy

All supplied facts matter. There is no universal exam rule that a code matrix overrides a scenario narrative or that a structural plan always supersedes the program. Look for explicit revisions, dates or instructions establishing which condition applies. A code-summary label may itself need to be evaluated if the question asks whether it is correct.

For example, if a narrative says timber construction while a plan shows protected steel and a summary says Type IIA, first determine whether the item identifies a revision or asks you to assess an alternative. Do not silently choose whichever fact makes the calculation easiest. In professional practice, document the discrepancy and obtain a coordinated clarification. In exam preparation, learn to distinguish an explicit alternate design from an unresolved inconsistency rather than teaching a fictitious priority rule.

Similarly, a room with 150 fixed seats is not automatically assigned 200 occupants merely because its net area divided by 15 equals 200. Fixed seating and unconcentrated movable seating use different occupant-load rules. Apply the actual seating condition and any other occupied areas that must be included.

Worked Integration: A Small Office Floor

Assume a practice case explicitly gives a 12,000-square-foot gross office area and a separate 900-square-foot net conference room with movable tables and chairs. It directs use of the 2021 IBC factors of 150 gross for office and 15 net for this assembly function. Avoid counting the conference area twice: the 12,000-square-foot office figure is stated here to exclude it.

Office load is 12 , 000 / 150 = 80 12,000/150=80 12 , 000/150 = 80 . Conference load is 900 / 15 = 60 900/15=60 900/15 = 60 . Combined load is 140. If two exits are otherwise required and equally share the load, each serves 70 people for this simplified distribution. With the qualifying sprinkler and voice/alarm conditions and no applicable exclusion, level-component capacity width is 70 ( 0.15 ) = 10.5 70(0.15)=10.5 70 ( 0.15 ) = 10.5 inches per branch. That does not permit a 10.5-inch door or corridor: the independent component minimum governs. An accessible door generally needs 32 inches clear; the applicable corridor and stair minima must also be checked.

Now suppose the conference room changes to chairs-only movable seating. Its factor becomes 7 net, so 900 / 7 = 128.572 900/7=128.572 900/7 = 128.572 , rounded up to 129 occupants. Combined load becomes 209. The change can affect exits, fixture counts, ventilation, acoustics and program area. A seating change is not confined to one line in a code table.

Door Encroachment: Two Different Tests

IBC 1005.7.1 distinguishes a leaf during its swing from a leaf fully open. During the swing, it may not reduce the required width by more than one-half. When fully open, the permitted encroachment is generally 7 inches. Do not reverse these criteria.

Take a corridor physically 48 inches wide with a required width of 44 inches. A leaf that projects 34 inches at an intermediate position leaves only 14 inches. Half of the required width is 22 inches, so that position fails. At fully open, a 4-inch projection leaves 44 inches and satisfies the stated fully-open encroachment check. Passing the fully-open test does not cure failure during the swing. Maneuvering clearances, direction of swing, hardware and any special egress requirements remain separate.

Pace the Actual Form

The division provides 245 testing minutes, not five to seven minutes for every case item in addition to a complete discrete-item budget. A practice budget might reserve 70 minutes for twenty case items while allocating 160 to eighty discrete items and 15 to review. The sum is 245; breaks use the separate allowance. Adjust to your performance and actual questions, and avoid spending so long on one calculation that you lose access to easier items.

Before selecting an answer, check dimensions, units, rounding direction, area boundaries and whether every condition is satisfied. A final result should remain plausible: a gross area smaller than its contained net program, a negative required luminaire count or a magically compliant fifth Type VA residential story should trigger a review of assumptions.

Sources: NCARB Guidelines , 2026 case-study changes , and 2021 IBC Chapter 10 .

Decision Check

  • Office-floor exercise Original conference setup Chairs-only change
  • Office load 12,000 / 150 = 80 80
  • Conference load 900 / 15 = 60 900 / 7, rounded up = 129
  • Total 140 209
  • Follow-up Exits, fixtures and ventilation Recheck all affected systems