Study guide
1.3 Cut Scores, Score Reports, Provisional Feedback & Retakes
Architect Registration Examination ARE 5.0
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: ARE 5.0 Structure, Delivery & Scoring
1.1 The Six Divisions: Items, Durations, Sections & Objectives 1.2 Eligibility, PSI Delivery, Fees, Scheduling & Rescheduling 1.3 Cut Scores, Score Reports, Provisional Feedback & Retakes
2 Chapter 2: Licensure Path, Item Types & Test-Day Strategy
2.1 Education Standard, AXP Hours, Settings & Reporting Rules 2.2 The NCARB Record, Score Validity Policy & Reciprocity 2.3 Item Types, Case Studies, Exam Tools, Breaks & Pacing
3 Chapter 3: Practice Management — Firm Resources, Conduct & the Work Environment
3.1 Assessing Practice Resources: Staffing, Development & Capital Investment 3.2 Regulating the Work Environment: FLSA, Antidiscrimination Law, OSHA & ADA Title III 3.3 Ethical Standards, the NCARB Rules of Conduct & the Standard of Care 3.4 Business Structures, Firm Ownership Rules & Practice-Wide Methodologies
4 Chapter 4: Practice Management — Firm Finances & Financial Health
4.1 Utilization, Overhead, Break-Even & Net Multiplier 4.2 Liquidity, Solvency & Reading Firm Financials Strategically 4.3 Accrual vs. Cash Accounting & the Architectural Balance Sheet 4.4 The Income Statement, Net Operating Revenue & Cash Flow Management
5 Chapter 5: Practice Management — Risk, Insurance & Business Development
5.1 Risk Management & the Firm’s Insurance Portfolio 5.2 Contractual Risk Allocation, Intellectual Property & Dispute Resolution 5.3 Client Requests, Compensation Methods, Project Delivery & Project Risk
6 Chapter 6: Project Management — Team, Resources & Consultants
6.1 Assembling the Project Team: Roles, Authority & Selection Criteria 6.2 Allocating & Managing Project Resources: Hours, Rates & Leveling 6.3 Consultant Selection, Qualifications-Based Selection & Scope Boundaries 6.4 AIA C401: Flow-Through, Consultant Standard of Care, Insurance & Payment
7 Chapter 7: Project Management — Work Planning, Scheduling & Budget Control
7.1 The Project Work Plan & Phase Fee Allocation 7.2 Work Breakdown Structures, Scheduling Methods & Dependency Logic 7.3 Critical Path Calculations, Float & Schedule Compression 7.4 Project Communication: Paths, Instruments, Meetings & the Record 7.5 Monitoring the Project Budget with Earned Value Management 7.6 Scope Creep, Additional Services & Written Authorization
8 Chapter 8: Project Management — Contracts, Approvals & Quality Control
8.1 AIA B101: Initial Information, Standard of Care & Basic Services 8.2 B101: Owner Duties, Cost of the Work, Copyright, Termination & Compensation 8.3 The Owner-Contractor Agreement & A201 Contractor Responsibilities 8.4 A201: Architect Administration, Changes, Claims & Separate Contractors 8.5 Regulatory Compliance, Authorities Having Jurisdiction & Project Approvals 8.6 Documenting a Project for the Specified Delivery Method 8.7 Quality Assurance, Quality Control, Constructability & the Record
9 Chapter 9: Programming & Analysis — Site & Environmental Conditions
9.1 Climate Classification, Solar Geometry & Passive Site Opportunities 9.2 Microclimate, Wind, Topography, Grading & Site Hydrology 9.3 Environmental Due Diligence: CERCLA Liability & Phase I / Phase II Assessments 9.4 Soil Mechanics, Geotechnical Investigation & Foundation Selection 9.5 Vehicular Circulation, Access Management, Parking & Emergency Access
10 Chapter 10: Programming & Analysis — Zoning, Codes & Site Infrastructure
10.1 Pedestrian Circulation, Site Utilities & Contextual Constraints 10.2 Zoning Authority, Euclidean and Form-Based Codes & Bulk Standards 10.3 Non-Conforming Uses, Variances, Easements & Parking Feasibility 10.4 IBC Occupancy Classification, Mixed Occupancy & Incidental Uses 10.5 IBC Construction Types, Fire-Resistance Ratings & Compartmentation
11 Chapter 11: Programming & Analysis — Building Programming & Feasibility
11.1 Programming Methodology, Net vs. Gross Area & Building Efficiency 11.2 Adjacency Matrices, Bubble Diagrams, Blocking & Stacking 11.3 Evaluating an Existing Building Against a Program 11.4 Reviewing Project Budget & Schedule Feasibility Against Scope 11.5 Identifying Building & Structural System Alternatives at Programming
12 Chapter 12: Project Planning & Design — Siting, Configuration, Codes & Life Safety
12.1 Building Siting, Neighborhood Context, Zoning Application & Configuration 12.2 IBC Allowable Area: Tabular Area, Frontage & Sprinkler Increases 12.3 Building Height, Story Limits, Mixed Occupancy & Unlimited Area Buildings 12.4 Means of Egress Components & Occupant Load Calculation 12.5 Exit Count, Remoteness, Egress Capacity, Travel Distance & Dead Ends 12.6 Accessible Routes, Slopes, Protruding Objects & Ramp Design 12.7 Door Clearances, Operating Hardware & Accessible Toilet Room Geometry
13 Chapter 13: Project Planning & Design — Structural & Mechanical Systems
13.1 Selecting Structural Systems: Steel, Concrete, Wood & Masonry 13.2 Lateral Force-Resisting Systems, Wind Loads & Seismic Design 13.3 Thermal Comfort, ASHRAE Standard 55 & Psychrometrics 13.4 HVAC System Typologies, Spatial Allocation & Central Plant Equipment 13.5 Potable Water Supply, Drainage, Waste & Vent Systems 13.6 Electrical Distribution, Emergency Power, Lighting & Daylighting 13.7 Fire Suppression, Standpipes, Conveying, Security & Communications
14 Chapter 14: Project Planning & Design — Envelope, Materials & Cost
14.1 Envelope Thermodynamics, Heat Transfer & Fenestration Performance 14.2 Thermal Bridging, Continuous Insulation & Thermal Mass 14.3 Passive Solar Heating, Natural Ventilation & Daylighting Architecture 14.4 Material Selection Criteria, Fire Performance & Vapor Permeance 14.5 Life Cycle Assessment, Embodied Carbon & Material Transparency 14.6 Galvanic Compatibility, Thermal Movement & Masonry Durability 14.7 Cost Estimating by Phase & Contingency Planning 14.8 Life-Cycle Cost Analysis, Present Value & Value Engineering
15 Chapter 15: Project Development & Documentation — Roofing, Waterproofing & Wall Assemblies
15.1 Low-Slope Roofing Systems, Membranes & Drainage Geometry 15.2 Flashing, Parapets, Copings & Roof Penetration Detailing 15.3 Steep-Slope Roofing & Below-Grade Waterproofing 15.4 Enclosure Control Layers & Rain Screen Cladding Systems 15.5 Vapor Retarders, Permeance Classes & Dew Point Control
16 Chapter 16: Project Development & Documentation — Connections, Coordination & Interiors
16.1 Structural Steel Connections & Base Plate Detailing 16.2 Concrete Reinforcing, Cover & Building Movement Joints 16.3 Sizing Structural, Mechanical, Electrical & Plumbing Components 16.4 Ceiling Plenum Coordination, Clash Detection & Level of Development 16.5 Vertical Chases, Shaft Walls, Through-Penetration Firestopping & Rated Joints 16.6 Interior Partition Framing, Head-of-Wall Details & Rated Gypsum Assemblies 16.7 Sound Isolation, STC, NRC & Reverberation Time 16.8 Door and Frame Construction & Fire Door Assemblies Under NFPA 80 16.9 Hardware Functions, Fire-Protection vs. Fire-Resistance Glazing
17 Chapter 17: Project Development & Documentation — Drawings, Specifications & Estimates
17.1 The National CAD Standard, Sheet Modules & Title Blocks 17.2 Drawing Cross-Referencing, Coordination & Revision Control 17.3 Documenting Site Features: Survey, Civil, Grading, Utilities & Landscape 17.4 The Project Manual & CSI MasterFormat Divisions 17.5 Section Numbering & the CSI Three-Part SectionFormat 17.6 Specification Methods & Document Precedence 17.7 Quantity Takeoff Estimating, General Conditions, Overhead & Alternates
18 Chapter 18: Construction & Evaluation — Procurement, Bidding & Preconstruction
18.1 Procurement Methods & AIA A701 Instructions to Bidders 18.2 Addenda Mechanics & Surety Bonds 18.3 The Preconstruction Conference & Administrative Protocols 18.4 Submittal Schedules, Long-Lead Items, Permits & Special Inspections 18.5 Bid Opening, Bidder Qualification & Discrepancy Rules 18.6 Alternates, Allowances, Unit Prices & Contract Award
19 Chapter 19: Construction & Evaluation — Observation & Contract Administration
19.1 The Architect’s Site Observation Role & the Means and Methods Firewall 19.2 Rejecting Non-Conforming Work, Special Inspections & Field Reports 19.3 Submittal Workflow, Review Responsibility & Action Stamps 19.4 Delegated Design, Design-Assist & Deferred Submittals 19.5 Requests for Information & Architect’s Supplemental Instructions 19.6 Change Orders, Construction Change Directives & Instrument Comparison
20 Chapter 20: Construction & Evaluation — Payment, Closeout & Evaluation
20.1 The Schedule of Values & the Application and Certificate for Payment 20.2 Stored Materials, Retainage, Certification Duties & Withholding 20.3 Substantial Completion & the Punch List Protocol 20.4 The Certificate of Substantial Completion & Its Legal Consequences 20.5 Final Completion, Final Payment & the Closeout Package 20.6 Warranty Administration, the Eleven-Month Walk-Through & Post-Occupancy Evaluation
1.3 Cut Scores, Score Reports, Provisional Feedback & Retakes
Key Takeaways Explain This Topic AI
Each ARE division has its own criterion-referenced cut score set by the Modified Angoff method; no candidate is graded on a curve.
Every item is worth one point with no partial credit and no penalty for a wrong answer, so every question should be answered.
Provisional feedback displays immediately after submitting, but the official score report posts to the NCARB Record within 7 to 10 calendar days.
Failing reports include a scaled score plus section-level percent correct benchmarked against candidates who previously passed; passing reports include neither.
A failed division may be retaken after 60 days, and the same division may be taken at most three times in any 12-month period.
Last updated: September 2026
The ARE reports one thing: pass or fail . There is no percentage on a passing report, no class rank, and no curve. Understanding how that binary outcome is produced changes how you prepare and how you read a failing report.
Criterion-Referenced Scoring and the Cut Score
The ARE is criterion-referenced . Your performance is measured against a fixed standard of entry-level competence, never against the other people who tested that week. NCARB states the standard plainly: passing scores "are the same for every board of architecture and are not affected by the number of people who pass or fail," and "there is no fixed percentage of candidates who pass or fail the ARE."
Each division has its own cut score — the minimum number of points required to pass that division. Your total score is the sum of points earned on correctly answered scored items, with pretest items excluded. Score at or above the cut score and you pass.
How the Cut Score Is Set
NCARB uses the Modified Angoff method , the standard-setting approach most widely used in licensure and certification testing. A task force made up of recently licensed architects, licensing board members, architectural educators, and experienced practitioners reviews the items and real candidate performance data, estimating how a minimally competent candidate would perform. NCARB's Examination Committee and Board of Directors then adopt the standard. A separate cut score is established for each of the six divisions .
Because multiple forms of each division circulate for security, the raw number of correct answers needed varies slightly from form to form — a harder form requires fewer raw points. The competency standard itself does not move .
Scoring Mechanics You Can Exploit
Every item is worth one point , regardless of item type.
There is no partial credit — a check-all-that-apply item with three of four correct responses selected earns zero.
There is no penalty for a wrong answer . A blank and an incorrect response score identically.
Your score is based on performance across the whole division , not section by section. A weak section can be offset by strong sections.
The last two points combine into a rule with no exceptions: answer every single item . Leaving a question blank forfeits a free expected value.
Provisional Feedback and the Official Score Report
Results are not released at the test center or at the end of an online appointment. Instead:
Provisional feedback appears on screen immediately after you click "Yes. End Exam and Submit." It is preliminary, unofficial, and based on unvalidated results. No printout is provided, so read it before you close out.
All results are run through data forensics to detect performance abnormalities and validity concerns.
Your official score report posts to the Exams tab of your NCARB Record within 7 to 10 calendar days of your test date, and you are emailed when it is available.
Every official report is labeled pass or fail on page one and carries a verification link so a board or employer can confirm authenticity.
Reading a Failing Report
A failing report is a diagnostic instrument, and it gives you two things a passing report does not:
A scaled score , which lets you compare your performance across administrations and across divisions on a common metric. Passing reports do not include one.
Section-level feedback on page two showing, for each content section of that division, the percentage range the section contributes to the division score, your percent correct , and the average percent correct achieved on that section by candidates who previously passed .
That last column is the one candidates under-use. It converts "I did badly on Contracts" into "I scored 52% on Contracts where passing candidates average 74%," which tells you exactly where the 60-day wait should be spent.
Retaking a Failed Division
Two rules govern retakes, and both are NCARB-wide:
60-day wait. You may retake a failed division no sooner than 60 days after the previous attempt at that same division.
Three attempts per 12 months. You may take the same division at most three times within any 12-month period .
Failing one division does not affect any other division, and you may sit a different division during the 60-day wait. When you fail, a new eligibility for that division is created according to your jurisdiction's rules.
Two further remedies exist if you believe a score is wrong:
Score verification: NCARB staff re-review your performance on every question. Request it within 60 days of the administration; the fee is $100 , refunded if NCARB finds the reported score or feedback was inaccurate.
Review and challenge: conducted by your jurisdiction's board, only if that board permits reviews. You may see the questions you missed but not the correct answers or explanations. NCARB charges $300 ; the application and fee must reach NCARB within four months of the test date, and the review must finish within six months.
Exam Tip: Candidates routinely assume a failing report means "study everything again." It does not. Page two ranks your sections against passing candidates. Rebuild your plan around the two weakest sections and re-test at day 60 — not at day 180.