Study guide

2.3 Item Types, Case Studies, Exam Tools, Breaks & Pacing

Architect Registration Examination ARE 5.0

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: ARE 5.0 Structure, Delivery & Scoring

1.1 The Six Divisions: Items, Durations, Sections & Objectives 1.2 Eligibility, PSI Delivery, Fees, Scheduling & Rescheduling 1.3 Cut Scores, Score Reports, Provisional Feedback & Retakes

2 Chapter 2: Licensure Path, Item Types & Test-Day Strategy

2.1 Education Standard, AXP Hours, Settings & Reporting Rules 2.2 The NCARB Record, Score Validity Policy & Reciprocity 2.3 Item Types, Case Studies, Exam Tools, Breaks & Pacing

3 Chapter 3: Practice Management — Firm Resources, Conduct & the Work Environment

3.1 Assessing Practice Resources: Staffing, Development & Capital Investment 3.2 Regulating the Work Environment: FLSA, Antidiscrimination Law, OSHA & ADA Title III 3.3 Ethical Standards, the NCARB Rules of Conduct & the Standard of Care 3.4 Business Structures, Firm Ownership Rules & Practice-Wide Methodologies

4 Chapter 4: Practice Management — Firm Finances & Financial Health

4.1 Utilization, Overhead, Break-Even & Net Multiplier 4.2 Liquidity, Solvency & Reading Firm Financials Strategically 4.3 Accrual vs. Cash Accounting & the Architectural Balance Sheet 4.4 The Income Statement, Net Operating Revenue & Cash Flow Management

5 Chapter 5: Practice Management — Risk, Insurance & Business Development

5.1 Risk Management & the Firm’s Insurance Portfolio 5.2 Contractual Risk Allocation, Intellectual Property & Dispute Resolution 5.3 Client Requests, Compensation Methods, Project Delivery & Project Risk

6 Chapter 6: Project Management — Team, Resources & Consultants

6.1 Assembling the Project Team: Roles, Authority & Selection Criteria 6.2 Allocating & Managing Project Resources: Hours, Rates & Leveling 6.3 Consultant Selection, Qualifications-Based Selection & Scope Boundaries 6.4 AIA C401: Flow-Through, Consultant Standard of Care, Insurance & Payment

7 Chapter 7: Project Management — Work Planning, Scheduling & Budget Control

7.1 The Project Work Plan & Phase Fee Allocation 7.2 Work Breakdown Structures, Scheduling Methods & Dependency Logic 7.3 Critical Path Calculations, Float & Schedule Compression 7.4 Project Communication: Paths, Instruments, Meetings & the Record 7.5 Monitoring the Project Budget with Earned Value Management 7.6 Scope Creep, Additional Services & Written Authorization

8 Chapter 8: Project Management — Contracts, Approvals & Quality Control

8.1 AIA B101: Initial Information, Standard of Care & Basic Services 8.2 B101: Owner Duties, Cost of the Work, Copyright, Termination & Compensation 8.3 The Owner-Contractor Agreement & A201 Contractor Responsibilities 8.4 A201: Architect Administration, Changes, Claims & Separate Contractors 8.5 Regulatory Compliance, Authorities Having Jurisdiction & Project Approvals 8.6 Documenting a Project for the Specified Delivery Method 8.7 Quality Assurance, Quality Control, Constructability & the Record

9 Chapter 9: Programming & Analysis — Site & Environmental Conditions

9.1 Climate Classification, Solar Geometry & Passive Site Opportunities 9.2 Microclimate, Wind, Topography, Grading & Site Hydrology 9.3 Environmental Due Diligence: CERCLA Liability & Phase I / Phase II Assessments 9.4 Soil Mechanics, Geotechnical Investigation & Foundation Selection 9.5 Vehicular Circulation, Access Management, Parking & Emergency Access

10 Chapter 10: Programming & Analysis — Zoning, Codes & Site Infrastructure

10.1 Pedestrian Circulation, Site Utilities & Contextual Constraints 10.2 Zoning Authority, Euclidean and Form-Based Codes & Bulk Standards 10.3 Non-Conforming Uses, Variances, Easements & Parking Feasibility 10.4 IBC Occupancy Classification, Mixed Occupancy & Incidental Uses 10.5 IBC Construction Types, Fire-Resistance Ratings & Compartmentation

11 Chapter 11: Programming & Analysis — Building Programming & Feasibility

11.1 Programming Methodology, Net vs. Gross Area & Building Efficiency 11.2 Adjacency Matrices, Bubble Diagrams, Blocking & Stacking 11.3 Evaluating an Existing Building Against a Program 11.4 Reviewing Project Budget & Schedule Feasibility Against Scope 11.5 Identifying Building & Structural System Alternatives at Programming

12 Chapter 12: Project Planning & Design — Siting, Configuration, Codes & Life Safety

12.1 Building Siting, Neighborhood Context, Zoning Application & Configuration 12.2 IBC Allowable Area: Tabular Area, Frontage & Sprinkler Increases 12.3 Building Height, Story Limits, Mixed Occupancy & Unlimited Area Buildings 12.4 Means of Egress Components & Occupant Load Calculation 12.5 Exit Count, Remoteness, Egress Capacity, Travel Distance & Dead Ends 12.6 Accessible Routes, Slopes, Protruding Objects & Ramp Design 12.7 Door Clearances, Operating Hardware & Accessible Toilet Room Geometry

13 Chapter 13: Project Planning & Design — Structural & Mechanical Systems

13.1 Selecting Structural Systems: Steel, Concrete, Wood & Masonry 13.2 Lateral Force-Resisting Systems, Wind Loads & Seismic Design 13.3 Thermal Comfort, ASHRAE Standard 55 & Psychrometrics 13.4 HVAC System Typologies, Spatial Allocation & Central Plant Equipment 13.5 Potable Water Supply, Drainage, Waste & Vent Systems 13.6 Electrical Distribution, Emergency Power, Lighting & Daylighting 13.7 Fire Suppression, Standpipes, Conveying, Security & Communications

14 Chapter 14: Project Planning & Design — Envelope, Materials & Cost

14.1 Envelope Thermodynamics, Heat Transfer & Fenestration Performance 14.2 Thermal Bridging, Continuous Insulation & Thermal Mass 14.3 Passive Solar Heating, Natural Ventilation & Daylighting Architecture 14.4 Material Selection Criteria, Fire Performance & Vapor Permeance 14.5 Life Cycle Assessment, Embodied Carbon & Material Transparency 14.6 Galvanic Compatibility, Thermal Movement & Masonry Durability 14.7 Cost Estimating by Phase & Contingency Planning 14.8 Life-Cycle Cost Analysis, Present Value & Value Engineering

15 Chapter 15: Project Development & Documentation — Roofing, Waterproofing & Wall Assemblies

15.1 Low-Slope Roofing Systems, Membranes & Drainage Geometry 15.2 Flashing, Parapets, Copings & Roof Penetration Detailing 15.3 Steep-Slope Roofing & Below-Grade Waterproofing 15.4 Enclosure Control Layers & Rain Screen Cladding Systems 15.5 Vapor Retarders, Permeance Classes & Dew Point Control

16 Chapter 16: Project Development & Documentation — Connections, Coordination & Interiors

16.1 Structural Steel Connections & Base Plate Detailing 16.2 Concrete Reinforcing, Cover & Building Movement Joints 16.3 Sizing Structural, Mechanical, Electrical & Plumbing Components 16.4 Ceiling Plenum Coordination, Clash Detection & Level of Development 16.5 Vertical Chases, Shaft Walls, Through-Penetration Firestopping & Rated Joints 16.6 Interior Partition Framing, Head-of-Wall Details & Rated Gypsum Assemblies 16.7 Sound Isolation, STC, NRC & Reverberation Time 16.8 Door and Frame Construction & Fire Door Assemblies Under NFPA 80 16.9 Hardware Functions, Fire-Protection vs. Fire-Resistance Glazing

17 Chapter 17: Project Development & Documentation — Drawings, Specifications & Estimates

17.1 The National CAD Standard, Sheet Modules & Title Blocks 17.2 Drawing Cross-Referencing, Coordination & Revision Control 17.3 Documenting Site Features: Survey, Civil, Grading, Utilities & Landscape 17.4 The Project Manual & CSI MasterFormat Divisions 17.5 Section Numbering & the CSI Three-Part SectionFormat 17.6 Specification Methods & Document Precedence 17.7 Quantity Takeoff Estimating, General Conditions, Overhead & Alternates

18 Chapter 18: Construction & Evaluation — Procurement, Bidding & Preconstruction

18.1 Procurement Methods & AIA A701 Instructions to Bidders 18.2 Addenda Mechanics & Surety Bonds 18.3 The Preconstruction Conference & Administrative Protocols 18.4 Submittal Schedules, Long-Lead Items, Permits & Special Inspections 18.5 Bid Opening, Bidder Qualification & Discrepancy Rules 18.6 Alternates, Allowances, Unit Prices & Contract Award

19 Chapter 19: Construction & Evaluation — Observation & Contract Administration

19.1 The Architect’s Site Observation Role & the Means and Methods Firewall 19.2 Rejecting Non-Conforming Work, Special Inspections & Field Reports 19.3 Submittal Workflow, Review Responsibility & Action Stamps 19.4 Delegated Design, Design-Assist & Deferred Submittals 19.5 Requests for Information & Architect’s Supplemental Instructions 19.6 Change Orders, Construction Change Directives & Instrument Comparison

20 Chapter 20: Construction & Evaluation — Payment, Closeout & Evaluation

20.1 The Schedule of Values & the Application and Certificate for Payment 20.2 Stored Materials, Retainage, Certification Duties & Withholding 20.3 Substantial Completion & the Punch List Protocol 20.4 The Certificate of Substantial Completion & Its Legal Consequences 20.5 Final Completion, Final Payment & the Closeout Package 20.6 Warranty Administration, the Eleven-Month Walk-Through & Post-Occupancy Evaluation

2.3 Item Types, Case Studies, Exam Tools, Breaks & Pacing

Key Takeaways Explain This Topic AI

ARE 5.0 uses three item types: multiple choice, check-all-that-apply, and hotspot; quantitative fill-in-the-blank was retired in February 2024.

Check-all-that-apply items present six options, state the required number of selections in bold, and award no partial credit.

Each case study includes one to two resources, and PPD and PDD carry up to 9 case studies and up to 20 case study items each.

If a formula is needed to answer an item, NCARB provides it in the item under a Reference Formula subheading.

After any break, every previously viewed item is permanently locked, including items flagged for review.

Last updated: September 2026

Content knowledge is necessary but not sufficient. The ARE is delivered through a specific interface with specific rules, and candidates lose points every year to mechanics they could have learned in an hour.

The Three Item Types

ARE 5.0 uses three item types for both standalone and case study items. Every item is worth one point, and there is no partial credit on any of them. (Quantitative fill-in-the-blank items were retired from the exam in February 2024 — if a prep resource still drills them, it is out of date.)

1. Multiple Choice

A question followed by either three or four response options , with exactly one correct answer. Distractors are built from the common misconception, the common arithmetic slip, and the answer that would be right under a different code provision.

Strategy: form your own answer before reading the options, then use the strikethrough tool to eliminate. The strikethrough and highlight tools work on every item type and inside case study scenarios.

2. Check-All-That-Apply (CATA)

A question followed by six response options , with a prompt to select between two and four of them. The stem always states the required number in bold — "Check the two that apply."

Scoring: you must select all of the correct options and none of the incorrect ones. Three right out of four earns zero.

Strategy: evaluate each of the six options as an independent true/false statement, then confirm your selection count matches the stem exactly before moving on. Selecting five options when the stem says three is a guaranteed zero.

3. Hotspot

A question followed by a drawing, photograph, diagram, map, or other image. You answer by clicking on an area or object within the image . If your click falls inside the acceptable scoring area, it is correct.

Strategy: click the functional element the question names — the weep hole, the vapor retarder, the maneuvering clearance — not the general vicinity. Zoom in before placing the click.

Case Studies

Every division ends with a set of case studies. A case study is a snapshot of a project at a moment in time : a scenario describing the project and its key information, plus one to two resources . Resources may be code excerpts, AIA contract excerpts, drawings, budgets and schedules, or program requirements.

  • Division Case studies Case study items
  • Practice Management (PcM) up to 6 up to 14
  • Project Management (PjM) up to 7 up to 16
  • Programming & Analysis (PA) up to 7 up to 16
  • Project Planning & Design (PPD) up to 9 up to 20
  • Project Development & Documentation (PDD) up to 9 up to 20
  • Construction & Evaluation (CE) up to 7 up to 16

Source: NCARB, ARE 5.0 Guidelines (June 2026). The case study format was refreshed effective April 27, 2026: fewer items per case study and one to two resources per case study rather than the previous three to six.

Four mechanics matter:

The scenario and resources do not change from question to question within a case study.

Questions do not build on each other. Getting one wrong cannot cascade into the next.

All resources for a case study are available while viewing any of its items.

Case study items are placed at the end of the division, but you do not have to wait — the Exam Summary tool lets you jump to them whenever you want.

Case study items are not lookup exercises. NCARB is explicit that they "require you to find information and then apply or analyze it," which is why they take longer per item than standalone items. That extra time is already built into the division clock.

Strategy: skim the scenario once to learn the project, then work question-first — read the stem, decide what fact you need, and go to the resource for that fact. Watch for modified contract language : an AIA excerpt in a case study may contain owner-inserted edits, and the exhibit text governs, not your memory of the standard form.

Exam Tools

You get three tools, and no others:

On-screen calculator. Opened from the top menu bar. It handles the arithmetic, trigonometry, powers, roots, and memory functions ARE calculation items require. Critically, the calculator's history and memory reset every time you move to a new item — do not park an intermediate value there and navigate away. Personal calculators are prohibited.

Whiteboard. Your virtual scratch paper, also on the top menu bar. Unlike the calculator, whiteboard content is saved and viewable for the whole appointment, including after a break . It supports freehand pencil, text boxes, shapes, arrows, lines, multiple pages, zoom, and undo/redo.

Reference formulas. The ARE does not expect you to memorize structural, electrical, or mechanical formulas. If a formula is required to answer an item, it is provided in the item itself under a "Reference Formula" subheading. Learn to use the formulas in NCARB's published list; do not burn memory on storing them.

Breaks: The Rule That Costs Points

Each division includes allotted break time — 30 minutes on PcM, PjM, PA, and CE, and 45 minutes on PPD and PDD — usable all at once or split across several breaks. Exceeding your allotted break time is permitted, but the exam timer keeps running .

The rule that catches people is this: following a break, every item you have already viewed is locked, including items you marked for later review. You cannot view or edit them again.

So the break workflow is fixed:

Finish reviewing every flagged item you intend to revisit.

Confirm every viewed item has an answer selected.

Only then go to Exam Summary , click Break , confirm, and show the proctor the "On Break" screen.

At a test center you must stay inside the test center during a break; leaving may cancel your exam with no refund. You will be re-screened on return.

Pacing

Divide the clock by the item count before you start:

  • Division Items Test duration Average per item
  • PcM 65 160 min ~2.5 min
  • PjM / PA / CE 75 180 min ~2.4 min
  • PPD / PDD 100 245 min ~2.5 min

Roughly two and a half minutes per item, everywhere. Because case study items run longer than that average, standalone items need to run shorter. A workable rule: give a standalone item 90 seconds to two minutes , then commit to an answer and flag it rather than stalling. Reserve the back end of the clock for the case studies.

Exam Tip: There is no penalty for guessing. With one minute left, the highest-value action is not solving one more calculation — it is making sure no item anywhere in the division is blank.