Study guide

2.1 Education Standard, AXP Hours, Settings & Reporting Rules

Architect Registration Examination ARE 5.0

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: ARE 5.0 Structure, Delivery & Scoring

1.1 The Six Divisions: Items, Durations, Sections & Objectives 1.2 Eligibility, PSI Delivery, Fees, Scheduling & Rescheduling 1.3 Cut Scores, Score Reports, Provisional Feedback & Retakes

2 Chapter 2: Licensure Path, Item Types & Test-Day Strategy

2.1 Education Standard, AXP Hours, Settings & Reporting Rules 2.2 The NCARB Record, Score Validity Policy & Reciprocity 2.3 Item Types, Case Studies, Exam Tools, Breaks & Pacing

3 Chapter 3: Practice Management — Firm Resources, Conduct & the Work Environment

3.1 Assessing Practice Resources: Staffing, Development & Capital Investment 3.2 Regulating the Work Environment: FLSA, Antidiscrimination Law, OSHA & ADA Title III 3.3 Ethical Standards, the NCARB Rules of Conduct & the Standard of Care 3.4 Business Structures, Firm Ownership Rules & Practice-Wide Methodologies

4 Chapter 4: Practice Management — Firm Finances & Financial Health

4.1 Utilization, Overhead, Break-Even & Net Multiplier 4.2 Liquidity, Solvency & Reading Firm Financials Strategically 4.3 Accrual vs. Cash Accounting & the Architectural Balance Sheet 4.4 The Income Statement, Net Operating Revenue & Cash Flow Management

5 Chapter 5: Practice Management — Risk, Insurance & Business Development

5.1 Risk Management & the Firm’s Insurance Portfolio 5.2 Contractual Risk Allocation, Intellectual Property & Dispute Resolution 5.3 Client Requests, Compensation Methods, Project Delivery & Project Risk

6 Chapter 6: Project Management — Team, Resources & Consultants

6.1 Assembling the Project Team: Roles, Authority & Selection Criteria 6.2 Allocating & Managing Project Resources: Hours, Rates & Leveling 6.3 Consultant Selection, Qualifications-Based Selection & Scope Boundaries 6.4 AIA C401: Flow-Through, Consultant Standard of Care, Insurance & Payment

7 Chapter 7: Project Management — Work Planning, Scheduling & Budget Control

7.1 The Project Work Plan & Phase Fee Allocation 7.2 Work Breakdown Structures, Scheduling Methods & Dependency Logic 7.3 Critical Path Calculations, Float & Schedule Compression 7.4 Project Communication: Paths, Instruments, Meetings & the Record 7.5 Monitoring the Project Budget with Earned Value Management 7.6 Scope Creep, Additional Services & Written Authorization

8 Chapter 8: Project Management — Contracts, Approvals & Quality Control

8.1 AIA B101: Initial Information, Standard of Care & Basic Services 8.2 B101: Owner Duties, Cost of the Work, Copyright, Termination & Compensation 8.3 The Owner-Contractor Agreement & A201 Contractor Responsibilities 8.4 A201: Architect Administration, Changes, Claims & Separate Contractors 8.5 Regulatory Compliance, Authorities Having Jurisdiction & Project Approvals 8.6 Documenting a Project for the Specified Delivery Method 8.7 Quality Assurance, Quality Control, Constructability & the Record

9 Chapter 9: Programming & Analysis — Site & Environmental Conditions

9.1 Climate Classification, Solar Geometry & Passive Site Opportunities 9.2 Microclimate, Wind, Topography, Grading & Site Hydrology 9.3 Environmental Due Diligence: CERCLA Liability & Phase I / Phase II Assessments 9.4 Soil Mechanics, Geotechnical Investigation & Foundation Selection 9.5 Vehicular Circulation, Access Management, Parking & Emergency Access

10 Chapter 10: Programming & Analysis — Zoning, Codes & Site Infrastructure

10.1 Pedestrian Circulation, Site Utilities & Contextual Constraints 10.2 Zoning Authority, Euclidean and Form-Based Codes & Bulk Standards 10.3 Non-Conforming Uses, Variances, Easements & Parking Feasibility 10.4 IBC Occupancy Classification, Mixed Occupancy & Incidental Uses 10.5 IBC Construction Types, Fire-Resistance Ratings & Compartmentation

11 Chapter 11: Programming & Analysis — Building Programming & Feasibility

11.1 Programming Methodology, Net vs. Gross Area & Building Efficiency 11.2 Adjacency Matrices, Bubble Diagrams, Blocking & Stacking 11.3 Evaluating an Existing Building Against a Program 11.4 Reviewing Project Budget & Schedule Feasibility Against Scope 11.5 Identifying Building & Structural System Alternatives at Programming

12 Chapter 12: Project Planning & Design — Siting, Configuration, Codes & Life Safety

12.1 Building Siting, Neighborhood Context, Zoning Application & Configuration 12.2 IBC Allowable Area: Tabular Area, Frontage & Sprinkler Increases 12.3 Building Height, Story Limits, Mixed Occupancy & Unlimited Area Buildings 12.4 Means of Egress Components & Occupant Load Calculation 12.5 Exit Count, Remoteness, Egress Capacity, Travel Distance & Dead Ends 12.6 Accessible Routes, Slopes, Protruding Objects & Ramp Design 12.7 Door Clearances, Operating Hardware & Accessible Toilet Room Geometry

13 Chapter 13: Project Planning & Design — Structural & Mechanical Systems

13.1 Selecting Structural Systems: Steel, Concrete, Wood & Masonry 13.2 Lateral Force-Resisting Systems, Wind Loads & Seismic Design 13.3 Thermal Comfort, ASHRAE Standard 55 & Psychrometrics 13.4 HVAC System Typologies, Spatial Allocation & Central Plant Equipment 13.5 Potable Water Supply, Drainage, Waste & Vent Systems 13.6 Electrical Distribution, Emergency Power, Lighting & Daylighting 13.7 Fire Suppression, Standpipes, Conveying, Security & Communications

14 Chapter 14: Project Planning & Design — Envelope, Materials & Cost

14.1 Envelope Thermodynamics, Heat Transfer & Fenestration Performance 14.2 Thermal Bridging, Continuous Insulation & Thermal Mass 14.3 Passive Solar Heating, Natural Ventilation & Daylighting Architecture 14.4 Material Selection Criteria, Fire Performance & Vapor Permeance 14.5 Life Cycle Assessment, Embodied Carbon & Material Transparency 14.6 Galvanic Compatibility, Thermal Movement & Masonry Durability 14.7 Cost Estimating by Phase & Contingency Planning 14.8 Life-Cycle Cost Analysis, Present Value & Value Engineering

15 Chapter 15: Project Development & Documentation — Roofing, Waterproofing & Wall Assemblies

15.1 Low-Slope Roofing Systems, Membranes & Drainage Geometry 15.2 Flashing, Parapets, Copings & Roof Penetration Detailing 15.3 Steep-Slope Roofing & Below-Grade Waterproofing 15.4 Enclosure Control Layers & Rain Screen Cladding Systems 15.5 Vapor Retarders, Permeance Classes & Dew Point Control

16 Chapter 16: Project Development & Documentation — Connections, Coordination & Interiors

16.1 Structural Steel Connections & Base Plate Detailing 16.2 Concrete Reinforcing, Cover & Building Movement Joints 16.3 Sizing Structural, Mechanical, Electrical & Plumbing Components 16.4 Ceiling Plenum Coordination, Clash Detection & Level of Development 16.5 Vertical Chases, Shaft Walls, Through-Penetration Firestopping & Rated Joints 16.6 Interior Partition Framing, Head-of-Wall Details & Rated Gypsum Assemblies 16.7 Sound Isolation, STC, NRC & Reverberation Time 16.8 Door and Frame Construction & Fire Door Assemblies Under NFPA 80 16.9 Hardware Functions, Fire-Protection vs. Fire-Resistance Glazing

17 Chapter 17: Project Development & Documentation — Drawings, Specifications & Estimates

17.1 The National CAD Standard, Sheet Modules & Title Blocks 17.2 Drawing Cross-Referencing, Coordination & Revision Control 17.3 Documenting Site Features: Survey, Civil, Grading, Utilities & Landscape 17.4 The Project Manual & CSI MasterFormat Divisions 17.5 Section Numbering & the CSI Three-Part SectionFormat 17.6 Specification Methods & Document Precedence 17.7 Quantity Takeoff Estimating, General Conditions, Overhead & Alternates

18 Chapter 18: Construction & Evaluation — Procurement, Bidding & Preconstruction

18.1 Procurement Methods & AIA A701 Instructions to Bidders 18.2 Addenda Mechanics & Surety Bonds 18.3 The Preconstruction Conference & Administrative Protocols 18.4 Submittal Schedules, Long-Lead Items, Permits & Special Inspections 18.5 Bid Opening, Bidder Qualification & Discrepancy Rules 18.6 Alternates, Allowances, Unit Prices & Contract Award

19 Chapter 19: Construction & Evaluation — Observation & Contract Administration

19.1 The Architect’s Site Observation Role & the Means and Methods Firewall 19.2 Rejecting Non-Conforming Work, Special Inspections & Field Reports 19.3 Submittal Workflow, Review Responsibility & Action Stamps 19.4 Delegated Design, Design-Assist & Deferred Submittals 19.5 Requests for Information & Architect’s Supplemental Instructions 19.6 Change Orders, Construction Change Directives & Instrument Comparison

20 Chapter 20: Construction & Evaluation — Payment, Closeout & Evaluation

20.1 The Schedule of Values & the Application and Certificate for Payment 20.2 Stored Materials, Retainage, Certification Duties & Withholding 20.3 Substantial Completion & the Punch List Protocol 20.4 The Certificate of Substantial Completion & Its Legal Consequences 20.5 Final Completion, Final Payment & the Closeout Package 20.6 Warranty Administration, the Eleven-Month Walk-Through & Post-Occupancy Evaluation

2.1 Education Standard, AXP Hours, Settings & Reporting Rules

Key Takeaways Explain This Topic AI

The AXP requires a minimum of 3,740 hours: PcM 160, PjM 360, PA 260, PPD 1,080, PDD 1,520, and CE 360.

At least 1,860 hours must be earned in Setting A, under an AXP supervisor licensed in the United States or Canada.

Setting O has no minimum but caps each opportunity individually, such as 320 hours for construction work and 40 hours for a mentor site visit.

Since November 18, 2025, experience reported within one year earns 100% credit and older experience earns 75% credit with no age limit.

A four-year pre-professional degree is not NAAB-accredited and does not by itself satisfy the education standard in most jurisdictions.

Last updated: September 2026

Licensure in the United States is granted by 55 jurisdictional boards , not by the federal government and not by NCARB. Every board builds its standard on the same three pillars — the Three E's: Education, Experience, and Examination — and NCARB administers the national programs that satisfy two of them.

Education: The NAAB-Accredited Degree

The benchmark education requirement in most jurisdictions is a professional degree accredited by the National Architectural Accrediting Board (NAAB) :

Bachelor of Architecture (B.Arch): a five-year undergraduate professional degree.

Master of Architecture (M.Arch): a graduate professional degree, typically two years after a four-year pre-professional degree in architecture, or three-plus years for candidates entering from an unrelated undergraduate field.

Doctor of Architecture (D.Arch): a professional doctorate offered by a small number of accredited programs.

A four-year pre-professional degree — a B.S. in Architecture or a B.A. in Architectural Studies — is not an accredited professional degree and does not by itself satisfy the education standard in most jurisdictions.

Alternatives to the Accredited Degree

NCARB Education Alternative: allows candidates without an accredited degree to satisfy NCARB's Education Standard through a documented portfolio rather than a specific credential.

Jurisdiction experience equivalency: several boards (California, New York, Washington among them) allow extended documented employment under a licensed architect in place of an accredited degree. These paths are set by the board, not by NCARB, so verify the rule in the jurisdiction you intend to enter.

Experience: The Architectural Experience Program (AXP)

The AXP requires a minimum of 3,740 documented hours across six experience areas that map one-to-one onto the six ARE divisions. That mapping is deliberate — work you do on Friday is meant to be testable content on the following Saturday.

  • AXP experience area Required hours What it covers
  • Practice Management 160 Running a firm: business management, marketing, winning work, client relationships
  • Project Management 360 Delivering to contract: budgeting, coordinating, overseeing, executing a project
  • Programming & Analysis 260 Pre-design: client requirements, codes and zoning, site data, feasibility

Project Planning & Design 1,080 Schematic design: layout, code review, consultant coordination, client communication

  • Project Development & Documentation 1,520 Post-schematic: construction documents, regulatory approvals
  • Construction & Evaluation 360 Construction administration and post-construction: site visits, punch lists
  • TOTAL 3,740

Source: NCARB, Your Guide to the AXP.

Note the shape of that table. PDD alone is 1,520 hours — 41% of the entire program , and PDD plus PPD is 2,600 hours, roughly 70%. PcM at 160 hours is the smallest by an order of magnitude. Candidates consistently finish PPD and PDD hours long before they finish PcM and PA hours.

Experience Settings

Setting A — Architecture. Experience gained while employed by an architecture firm under an AXP supervisor licensed to practice architecture in the United States or Canada. You must earn at least 1,860 hours in Setting A. There is no maximum; all 3,740 hours may be Setting A.

Setting O — Other Experience Opportunities. Everything else. There is no minimum for Setting O, but each opportunity carries its own maximum . Examples from NCARB's published table:

Setting O opportunity Where hours go Maximum

Other work under licensed professionals (engineer, landscape architect, etc.) Any experience area Up to 1,860 hours

  • Design or construction related employment Any experience area Up to 320 hours
  • Community-based design center / collaborative Any experience area Up to 320 hours
  • Construction work Construction & Evaluation Up to 320 hours
  • Site visit with a mentor Construction & Evaluation Up to 40 hours
  • NCARB's Professional Conduct CE series Construction & Evaluation 40 hours

The exam-relevant takeaway is the asymmetry: Setting A has a floor (1,860) and Setting O has ceilings. A candidate cannot assemble a complete AXP out of Setting O opportunities.

The Reporting Rule

NCARB's reporting policy changed on November 18, 2025 , and the old eight-month/five-year framework is retired. Under the current rule:

Experience submitted within one year of being gained earns 100% credit .

Experience older than one year at the time of submission earns 75% credit , and there is no limit on how old that experience can be .

Hours previously credited at 50% under the retired policy were automatically increased to 75% for candidates who were not yet AXP complete. NCARB may grant a reasonable extension to the reporting policy in defined circumstances.

The practical consequence is unchanged even though the numbers moved: report promptly . A candidate who lets 1,000 hours age past a year converts them into 750 credited hours and has to work an extra 250 hours to make up the difference.

Supervisors and Mentors

Every reported hour must be approved by an AXP supervisor with direct knowledge of your work. A mentor is a separate, optional relationship used for specific Setting O opportunities such as site visits.

Exam Tip: AXP questions on PcM and PjM are rarely about the hour totals themselves. They are about who may supervise what, in which setting, and what happens to late-reported hours. Learn the 1,860-hour Setting A floor, the per-opportunity Setting O caps, and the one-year/100% versus older-than-one-year/75% reporting split.