1 Chapter 1: ARE 5.0 Structure, Delivery & Scoring

1.1 The Six Divisions: Items, Durations, Sections & Objectives 1.2 Eligibility, PSI Delivery, Fees, Scheduling & Rescheduling 1.3 Cut Scores, Score Reports, Provisional Feedback & Retakes

2 Chapter 2: Licensure Path, Item Types & Test-Day Strategy

2.1 Education Standard, AXP Hours, Settings & Reporting Rules 2.2 The NCARB Record, Score Validity Policy & Reciprocity 2.3 Item Types, Case Studies, Exam Tools, Breaks & Pacing

3 Chapter 3: Practice Management — Firm Resources, Conduct & the Work Environment

3.1 Assessing Practice Resources: Staffing, Development & Capital Investment 3.2 Regulating the Work Environment: FLSA, Antidiscrimination Law, OSHA & ADA Title III 3.3 Ethical Standards, the NCARB Rules of Conduct & the Standard of Care 3.4 Business Structures, Firm Ownership Rules & Practice-Wide Methodologies

4 Chapter 4: Practice Management — Firm Finances & Financial Health

4.1 Utilization, Overhead, Break-Even & Net Multiplier 4.2 Liquidity, Solvency & Reading Firm Financials Strategically 4.3 Accrual vs. Cash Accounting & the Architectural Balance Sheet 4.4 The Income Statement, Net Operating Revenue & Cash Flow Management

5 Chapter 5: Practice Management — Risk, Insurance & Business Development

5.1 Risk Management & the Firm’s Insurance Portfolio 5.2 Contractual Risk Allocation, Intellectual Property & Dispute Resolution 5.3 Client Requests, Compensation Methods, Project Delivery & Project Risk

6 Chapter 6: Project Management — Team, Resources & Consultants

6.1 Assembling the Project Team: Roles, Authority & Selection Criteria 6.2 Allocating & Managing Project Resources: Hours, Rates & Leveling 6.3 Consultant Selection, Qualifications-Based Selection & Scope Boundaries 6.4 AIA C401: Flow-Through, Consultant Standard of Care, Insurance & Payment

7 Chapter 7: Project Management — Work Planning, Scheduling & Budget Control

7.1 The Project Work Plan & Phase Fee Allocation 7.2 Work Breakdown Structures, Scheduling Methods & Dependency Logic 7.3 Critical Path Calculations, Float & Schedule Compression 7.4 Project Communication: Paths, Instruments, Meetings & the Record 7.5 Monitoring the Project Budget with Earned Value Management 7.6 Scope Creep, Additional Services & Written Authorization

8 Chapter 8: Project Management — Contracts, Approvals & Quality Control

8.1 AIA B101: Initial Information, Standard of Care & Basic Services 8.2 B101: Owner Duties, Cost of the Work, Copyright, Termination & Compensation 8.3 The Owner-Contractor Agreement & A201 Contractor Responsibilities 8.4 A201: Architect Administration, Changes, Claims & Separate Contractors 8.5 Regulatory Compliance, Authorities Having Jurisdiction & Project Approvals 8.6 Documenting a Project for the Specified Delivery Method 8.7 Quality Assurance, Quality Control, Constructability & the Record

9 Chapter 9: Programming & Analysis — Site & Environmental Conditions

9.1 Climate Classification, Solar Geometry & Passive Site Opportunities 9.2 Microclimate, Wind, Topography, Grading & Site Hydrology 9.3 Environmental Due Diligence: CERCLA Liability & Phase I / Phase II Assessments 9.4 Soil Mechanics, Geotechnical Investigation & Foundation Selection 9.5 Vehicular Circulation, Access Management, Parking & Emergency Access

10 Chapter 10: Programming & Analysis — Zoning, Codes & Site Infrastructure

10.1 Pedestrian Circulation, Site Utilities & Contextual Constraints 10.2 Zoning Authority, Euclidean and Form-Based Codes & Bulk Standards 10.3 Non-Conforming Uses, Variances, Easements & Parking Feasibility 10.4 IBC Occupancy Classification, Mixed Occupancy & Incidental Uses 10.5 IBC Construction Types, Fire-Resistance Ratings & Compartmentation

11 Chapter 11: Programming & Analysis — Building Programming & Feasibility

11.1 Programming Methodology, Net vs. Gross Area & Building Efficiency 11.2 Adjacency Matrices, Bubble Diagrams, Blocking & Stacking 11.3 Evaluating an Existing Building Against a Program 11.4 Reviewing Project Budget & Schedule Feasibility Against Scope 11.5 Identifying Building & Structural System Alternatives at Programming

12 Chapter 12: Project Planning & Design — Siting, Configuration, Codes & Life Safety

12.1 Building Siting, Neighborhood Context, Zoning Application & Configuration 12.2 IBC Allowable Area: Tabular Area, Frontage & Sprinkler Increases 12.3 Building Height, Story Limits, Mixed Occupancy & Unlimited Area Buildings 12.4 Means of Egress Components & Occupant Load Calculation 12.5 Exit Count, Remoteness, Egress Capacity, Travel Distance & Dead Ends 12.6 Accessible Routes, Slopes, Protruding Objects & Ramp Design 12.7 Door Clearances, Operating Hardware & Accessible Toilet Room Geometry

13 Chapter 13: Project Planning & Design — Structural & Mechanical Systems

13.1 Selecting Structural Systems: Steel, Concrete, Wood & Masonry 13.2 Lateral Force-Resisting Systems, Wind Loads & Seismic Design 13.3 Thermal Comfort, ASHRAE Standard 55 & Psychrometrics 13.4 HVAC System Typologies, Spatial Allocation & Central Plant Equipment 13.5 Potable Water Supply, Drainage, Waste & Vent Systems 13.6 Electrical Distribution, Emergency Power, Lighting & Daylighting 13.7 Fire Suppression, Standpipes, Conveying, Security & Communications

14 Chapter 14: Project Planning & Design — Envelope, Materials & Cost

14.1 Envelope Thermodynamics, Heat Transfer & Fenestration Performance 14.2 Thermal Bridging, Continuous Insulation & Thermal Mass 14.3 Passive Solar Heating, Natural Ventilation & Daylighting Architecture 14.4 Material Selection Criteria, Fire Performance & Vapor Permeance 14.5 Life Cycle Assessment, Embodied Carbon & Material Transparency 14.6 Galvanic Compatibility, Thermal Movement & Masonry Durability 14.7 Cost Estimating by Phase & Contingency Planning 14.8 Life-Cycle Cost Analysis, Present Value & Value Engineering

15 Chapter 15: Project Development & Documentation — Roofing, Waterproofing & Wall Assemblies

15.1 Low-Slope Roofing Systems, Membranes & Drainage Geometry 15.2 Flashing, Parapets, Copings & Roof Penetration Detailing 15.3 Steep-Slope Roofing & Below-Grade Waterproofing 15.4 Enclosure Control Layers & Rain Screen Cladding Systems 15.5 Vapor Retarders, Permeance Classes & Dew Point Control

16 Chapter 16: Project Development & Documentation — Connections, Coordination & Interiors

16.1 Structural Steel Connections & Base Plate Detailing 16.2 Concrete Reinforcing, Cover & Building Movement Joints 16.3 Sizing Structural, Mechanical, Electrical & Plumbing Components 16.4 Ceiling Plenum Coordination, Clash Detection & Level of Development 16.5 Vertical Chases, Shaft Walls, Through-Penetration Firestopping & Rated Joints 16.6 Interior Partition Framing, Head-of-Wall Details & Rated Gypsum Assemblies 16.7 Sound Isolation, STC, NRC & Reverberation Time 16.8 Door and Frame Construction & Fire Door Assemblies Under NFPA 80 16.9 Hardware Functions, Fire-Protection vs. Fire-Resistance Glazing

17 Chapter 17: Project Development & Documentation — Drawings, Specifications & Estimates

17.1 The National CAD Standard, Sheet Modules & Title Blocks 17.2 Drawing Cross-Referencing, Coordination & Revision Control 17.3 Documenting Site Features: Survey, Civil, Grading, Utilities & Landscape 17.4 The Project Manual & CSI MasterFormat Divisions 17.5 Section Numbering & the CSI Three-Part SectionFormat 17.6 Specification Methods & Document Precedence 17.7 Quantity Takeoff Estimating, General Conditions, Overhead & Alternates

18 Chapter 18: Construction & Evaluation — Procurement, Bidding & Preconstruction

18.1 Procurement Methods & AIA A701 Instructions to Bidders 18.2 Addenda Mechanics & Surety Bonds 18.3 The Preconstruction Conference & Administrative Protocols 18.4 Submittal Schedules, Long-Lead Items, Permits & Special Inspections 18.5 Bid Opening, Bidder Qualification & Discrepancy Rules 18.6 Alternates, Allowances, Unit Prices & Contract Award

19 Chapter 19: Construction & Evaluation — Observation & Contract Administration

19.1 The Architect’s Site Observation Role & the Means and Methods Firewall 19.2 Rejecting Non-Conforming Work, Special Inspections & Field Reports 19.3 Submittal Workflow, Review Responsibility & Action Stamps 19.4 Delegated Design, Design-Assist & Deferred Submittals 19.5 Requests for Information & Architect’s Supplemental Instructions 19.6 Change Orders, Construction Change Directives & Instrument Comparison

20 Chapter 20: Construction & Evaluation — Payment, Closeout & Evaluation

20.1 The Schedule of Values & the Application and Certificate for Payment 20.2 Stored Materials, Retainage, Certification Duties & Withholding 20.3 Substantial Completion & the Punch List Protocol 20.4 The Certificate of Substantial Completion & Its Legal Consequences 20.5 Final Completion, Final Payment & the Closeout Package 20.6 Warranty Administration, the Eleven-Month Walk-Through & Post-Occupancy Evaluation

2.2 The NCARB Record, Score Validity Policy & Reciprocity

Key Takeaways Explain This Topic AI

The rolling clock is retired: a passed ARE 5.0 division stays valid for as long as ARE 5.0 is delivered, then establishes credit in the next version.

Once all six divisions are passed the candidate is ARE complete and the score validity policy no longer applies to those scores.

Some jurisdictions retain a rolling-clock requirement in their own statute, and candidates seeking licensure there remain subject to it.

An NCARB Record costs $105 to open and $105 per year to renew; the NCARB Certificate costs $1,415 to apply for and $300 per year.

NCARB never issues a license — only a jurisdiction board grants, denies, suspends, or revokes an architecture license.

Last updated: September 2026

Your NCARB Record is the file that holds your education verification, AXP hours, exam eligibilities and scores, and professional history. It is the instrument through which a board grants you eligibility, and later the instrument through which you obtain licenses in additional jurisdictions.

Maintaining the Record

Application fee: $105 for a licensure candidate.

Annual renewal: $105, payable for every year you remain active.

Transmittal: once education, experience, and examination requirements are satisfied, NCARB transmits your Record to the board that will issue the license.

NCARB reserves the right to withhold scores and suspend testing privileges while an outstanding balance exists, so a lapsed renewal can stall a testing plan.

The Score Validity Policy (the Rolling Clock Is Retired)

For years the ARE ran on a "rolling clock" : a passed division expired five years after you passed it, and candidates who stalled lost credit they had already earned. That policy is gone .

NCARB's Board of Directors voted unanimously to retire the rolling clock and replaced it with the score validity policy , which ties validity to the version of the exam rather than to the calendar:

A passed ARE division is valid throughout the delivery of the version of the exam under which it was taken . A division you pass in ARE 5.0 stays valid for as long as ARE 5.0 is delivered.

When the next version launches, your passed divisions are used to establish appropriate credit under that next version (for example, ARE 6.0).

Once you have passed all six divisions you are ARE complete , and your scores are no longer subject to the score validity policy at all.

Two consequences follow that candidates frequently get wrong:

A career pause no longer destroys credit. Parental leave, illness, a stint outside practice — none of these erase a passed division under the score validity policy.

Mixing exam versions is where expiration still bites. NCARB's own example: a candidate who passed an ARE 4.0 division that provided credit toward ARE 5.0, then passed three ARE 5.0 divisions, will lose the ARE 4.0-derived credit if ARE 5.0 ends before they finish — while the three genuine ARE 5.0 passes carry forward.

The Jurisdiction Exception

All 55 U.S. boards have adopted the score validity policy, and NCARB has reinstated thousands of previously expired credits. But some jurisdictions still carry a rolling-clock requirement in their own statute or rules , and a candidate seeking licensure in one of those jurisdictions remains subject to it until the statute is amended. This is why your official score report shows rolling-clock information and expiration dates only if your jurisdiction has such a requirement — and why a passing score report may still display a five-year expiration date for those candidates.

Check your own jurisdiction rather than assuming. The national policy and your board's statute are two different things.

Reciprocity, the NCARB Certificate & Mobility

Passing the ARE licenses you in one jurisdiction. Practicing in a second jurisdiction requires reciprocity (also called comity), and the standard vehicle is the NCARB Certificate .

The Certificate is issued to architects who have satisfied NCARB's education, experience, and examination standards.

Holding it lets you request electronic transmittal of your verified Record to another board, rather than reassembling transcripts, employment verifications, and score reports for each new jurisdiction.

Certificate fees are separate from candidate Record fees — a $1,415 application and $300 annual renewal for a registered architect.

International Mutual Recognition

NCARB maintains Mutual Recognition Agreements (MRAs) that let U.S. architects holding an NCARB Certificate pursue registration abroad — and let foreign-registered architects pursue U.S. registration — through negotiated terms rather than a full re-examination. Current partners include Canada , Mexico (through the tri-national agreement), Australia and New Zealand , and the United Kingdom (with the Architects Registration Board).

Two qualifications matter. First, each MRA sets its own eligibility conditions, and those conditions change: the Australia and New Zealand agreement implemented in November 2024 removed a 6,000-hour post-licensure experience requirement, and the updated Canada agreement implemented in January 2026 removed a 2,000-hour requirement along with citizenship and residency conditions. Second, because each U.S. jurisdiction regulates practice within its own borders, a jurisdiction decides individually whether it will accept a given MRA . Verify both the current MRA terms and your jurisdiction's participation before relying on either.

Exam Tip: The single most testable fact in this material is jurisdictional authority. NCARB does not license anyone. It maintains records, administers the AXP and the ARE, and issues the Certificate. Only a jurisdiction's board of architecture grants, denies, suspends, or revokes a license — and several boards add their own supplemental examination, such as California's Supplemental Examination, on top of the ARE.