15.3 Steep-Slope Roofing & Below-Grade Waterproofing

Architect Registration Examination ARE 5.0

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: ARE 5.0 Structure, Delivery & Scoring

1.1 The Six Divisions: Items, Durations, Sections & Objectives 1.2 Eligibility, PSI Delivery, Fees, Scheduling & Rescheduling 1.3 Cut Scores, Score Reports, Provisional Feedback & Retakes

2 Chapter 2: Licensure Path, Item Types & Test-Day Strategy

2.1 Education Standard, AXP Hours, Settings & Reporting Rules 2.2 The NCARB Record, Score Validity Policy & Reciprocity 2.3 Item Types, Case Studies, Exam Tools, Breaks & Pacing

3 Chapter 3: Practice Management — Firm Resources, Conduct & the Work Environment

3.1 Assessing Practice Resources: Staffing, Development & Capital Investment 3.2 Regulating the Work Environment: FLSA, Antidiscrimination Law, OSHA & ADA Title III 3.3 Ethical Standards, the NCARB Rules of Conduct & the Standard of Care 3.4 Business Structures, Firm Ownership Rules & Practice-Wide Methodologies

4 Chapter 4: Practice Management — Firm Finances & Financial Health

4.1 Utilization, Overhead, Break-Even & Net Multiplier 4.2 Liquidity, Solvency & Reading Firm Financials Strategically 4.3 Accrual vs. Cash Accounting & the Architectural Balance Sheet 4.4 The Income Statement, Net Operating Revenue & Cash Flow Management

5 Chapter 5: Practice Management — Risk, Insurance & Business Development

5.1 Risk Management & the Firm’s Insurance Portfolio 5.2 Contractual Risk Allocation, Intellectual Property & Dispute Resolution 5.3 Client Requests, Compensation Methods, Project Delivery & Project Risk

6 Chapter 6: Project Management — Team, Resources & Consultants

6.1 Assembling the Project Team: Roles, Authority & Selection Criteria 6.2 Allocating & Managing Project Resources: Hours, Rates & Leveling 6.3 Consultant Selection, Qualifications-Based Selection & Scope Boundaries 6.4 AIA C401: Flow-Through, Consultant Standard of Care, Insurance & Payment

7 Chapter 7: Project Management — Work Planning, Scheduling & Budget Control

7.1 The Project Work Plan & Phase Fee Allocation 7.2 Work Breakdown Structures, Scheduling Methods & Dependency Logic 7.3 Critical Path Calculations, Float & Schedule Compression 7.4 Project Communication: Paths, Instruments, Meetings & the Record 7.5 Monitoring the Project Budget with Earned Value Management 7.6 Scope Creep, Additional Services & Written Authorization

8 Chapter 8: Project Management — Contracts, Approvals & Quality Control

8.1 AIA B101: Initial Information, Standard of Care & Basic Services 8.2 B101: Owner Duties, Cost of the Work, Copyright, Termination & Compensation 8.3 The Owner-Contractor Agreement & A201 Contractor Responsibilities 8.4 A201: Architect Administration, Changes, Claims & Separate Contractors 8.5 Regulatory Compliance, Authorities Having Jurisdiction & Project Approvals 8.6 Documenting a Project for the Specified Delivery Method 8.7 Quality Assurance, Quality Control, Constructability & the Record

9 Chapter 9: Programming & Analysis — Site & Environmental Conditions

9.1 Climate Classification, Solar Geometry & Passive Site Opportunities 9.2 Microclimate, Wind, Topography, Grading & Site Hydrology 9.3 Environmental Due Diligence: CERCLA Liability & Phase I / Phase II Assessments 9.4 Soil Mechanics, Geotechnical Investigation & Foundation Selection 9.5 Vehicular Circulation, Access Management, Parking & Emergency Access

10 Chapter 10: Programming & Analysis — Zoning, Codes & Site Infrastructure

10.1 Pedestrian Circulation, Site Utilities & Contextual Constraints 10.2 Zoning Authority, Euclidean and Form-Based Codes & Bulk Standards 10.3 Non-Conforming Uses, Variances, Easements & Parking Feasibility 10.4 IBC Occupancy Classification, Mixed Occupancy & Incidental Uses 10.5 IBC Construction Types, Fire-Resistance Ratings & Compartmentation

11 Chapter 11: Programming & Analysis — Building Programming & Feasibility

11.1 Programming Methodology, Net vs. Gross Area & Building Efficiency 11.2 Adjacency Matrices, Bubble Diagrams, Blocking & Stacking 11.3 Evaluating an Existing Building Against a Program 11.4 Reviewing Project Budget & Schedule Feasibility Against Scope 11.5 Identifying Building & Structural System Alternatives at Programming

12 Chapter 12: Project Planning & Design — Siting, Configuration, Codes & Life Safety

12.1 Building Siting, Neighborhood Context, Zoning Application & Configuration 12.2 IBC Allowable Area: Tabular Area, Frontage & Sprinkler Increases 12.3 Building Height, Story Limits, Mixed Occupancy & Unlimited Area Buildings 12.4 Means of Egress Components & Occupant Load Calculation 12.5 Exit Count, Remoteness, Egress Capacity, Travel Distance & Dead Ends 12.6 Accessible Routes, Slopes, Protruding Objects & Ramp Design 12.7 Door Clearances, Operating Hardware & Accessible Toilet Room Geometry

13 Chapter 13: Project Planning & Design — Structural & Mechanical Systems

13.1 Selecting Structural Systems: Steel, Concrete, Wood & Masonry 13.2 Lateral Force-Resisting Systems, Wind Loads & Seismic Design 13.3 Thermal Comfort, ASHRAE Standard 55 & Psychrometrics 13.4 HVAC System Typologies, Spatial Allocation & Central Plant Equipment 13.5 Potable Water Supply, Drainage, Waste & Vent Systems 13.6 Electrical Distribution, Emergency Power, Lighting & Daylighting 13.7 Fire Suppression, Standpipes, Conveying, Security & Communications

14 Chapter 14: Project Planning & Design — Envelope, Materials & Cost

14.1 Envelope Thermodynamics, Heat Transfer & Fenestration Performance 14.2 Thermal Bridging, Continuous Insulation & Thermal Mass 14.3 Passive Solar Heating, Natural Ventilation & Daylighting Architecture 14.4 Material Selection Criteria, Fire Performance & Vapor Permeance 14.5 Life Cycle Assessment, Embodied Carbon & Material Transparency 14.6 Galvanic Compatibility, Thermal Movement & Masonry Durability 14.7 Cost Estimating by Phase & Contingency Planning 14.8 Life-Cycle Cost Analysis, Present Value & Value Engineering

15 Chapter 15: Project Development & Documentation — Roofing, Waterproofing & Wall Assemblies

15.1 Low-Slope Roofing Systems, Membranes & Drainage Geometry 15.2 Flashing, Parapets, Copings & Roof Penetration Detailing 15.3 Steep-Slope Roofing & Below-Grade Waterproofing 15.4 Enclosure Control Layers & Rain Screen Cladding Systems 15.5 Vapor Retarders, Permeance Classes & Dew Point Control

16 Chapter 16: Project Development & Documentation — Connections, Coordination & Interiors

16.1 Structural Steel Connections & Base Plate Detailing 16.2 Concrete Reinforcing, Cover & Building Movement Joints 16.3 Sizing Structural, Mechanical, Electrical & Plumbing Components 16.4 Ceiling Plenum Coordination, Clash Detection & Level of Development 16.5 Vertical Chases, Shaft Walls, Through-Penetration Firestopping & Rated Joints 16.6 Interior Partition Framing, Head-of-Wall Details & Rated Gypsum Assemblies 16.7 Sound Isolation, STC, NRC & Reverberation Time 16.8 Door and Frame Construction & Fire Door Assemblies Under NFPA 80 16.9 Hardware Functions, Fire-Protection vs. Fire-Resistance Glazing

17 Chapter 17: Project Development & Documentation — Drawings, Specifications & Estimates

17.1 The National CAD Standard, Sheet Modules & Title Blocks 17.2 Drawing Cross-Referencing, Coordination & Revision Control 17.3 Documenting Site Features: Survey, Civil, Grading, Utilities & Landscape 17.4 The Project Manual & CSI MasterFormat Divisions 17.5 Section Numbering & the CSI Three-Part SectionFormat 17.6 Specification Methods & Document Precedence 17.7 Quantity Takeoff Estimating, General Conditions, Overhead & Alternates

18 Chapter 18: Construction & Evaluation — Procurement, Bidding & Preconstruction

18.1 Procurement Methods & AIA A701 Instructions to Bidders 18.2 Addenda Mechanics & Surety Bonds 18.3 The Preconstruction Conference & Administrative Protocols 18.4 Submittal Schedules, Long-Lead Items, Permits & Special Inspections 18.5 Bid Opening, Bidder Qualification & Discrepancy Rules 18.6 Alternates, Allowances, Unit Prices & Contract Award

19 Chapter 19: Construction & Evaluation — Observation & Contract Administration

19.1 The Architect’s Site Observation Role & the Means and Methods Firewall 19.2 Rejecting Non-Conforming Work, Special Inspections & Field Reports 19.3 Submittal Workflow, Review Responsibility & Action Stamps 19.4 Delegated Design, Design-Assist & Deferred Submittals 19.5 Requests for Information & Architect’s Supplemental Instructions 19.6 Change Orders, Construction Change Directives & Instrument Comparison

20 Chapter 20: Construction & Evaluation — Payment, Closeout & Evaluation

20.1 The Schedule of Values & the Application and Certificate for Payment 20.2 Stored Materials, Retainage, Certification Duties & Withholding 20.3 Substantial Completion & the Punch List Protocol 20.4 The Certificate of Substantial Completion & Its Legal Consequences 20.5 Final Completion, Final Payment & the Closeout Package 20.6 Warranty Administration, the Eleven-Month Walk-Through & Post-Occupancy Evaluation

15.3 Steep-Slope Roofing & Below-Grade Waterproofing

Key Takeaways Explain This Topic AI

Steep-slope roofing is water-shedding and depends on lap, slope, and underlayment rather than on a continuous waterproof plane.

Roofing felt or synthetic underlayment and ice-barrier membranes are required backups where wind-driven rain or ice damming is likely.

Damp-proofing resists moisture vapor and incidental water, while waterproofing resists hydrostatic pressure — they are not interchangeable.

Positive-side waterproofing is applied on the water side of the wall and is strongly preferred; negative-side application is a remedial measure.

Footing drains, free-draining backfill, and drainage composites reduce hydrostatic head and are part of the waterproofing system, not an alternative to it.

Last updated: September 2026

Steep-Slope Roofing Systems

Steep-slope roofs are defined by IBC Section 1507 as roofs with a slope of 2:12 (17% slope) or greater, primarily shedding water through gravity overlap rather than hydrostatic barrier seals.

Asphalt Shingles (Fiberglass Composition):

Slope Limits: Standard single-layer underlayment (one ply of ASTM D226 Type I/II felt or synthetic underlayment with 2-inch headlap) requires a minimum slope of 4:12 . Low-slope applications between 2:12 and 4:12 are permitted only when installed with double-layer underlayment (two plies of felt overlapped 19 inches, creating a complete two-ply water-shedding membrane beneath shingles). Asphalt shingles are strictly prohibited on slopes below 2:12.

Fastening: Standard 4 nails per shingle (or 6 nails per shingle in high-wind regions >110 mph) placed below the adhesive sealant strip.

Standing Seam Metal Roofing: Minimum slope typically 3:12 for architectural snap-lock seams, or 1/2:12 for structural standing seams with factory-applied hot-melt sealant in mechanically seamed ribs. Fastened with concealed sliding clips that accommodate longitudinal thermal expansion and contraction.

Slate & Clay/Concrete Tile: Heavy gravity-shedding assemblies requiring robust structural framing (dead loads of 9 to 15 psf for tile; 10 to 25 psf for slate). Slopes generally require a minimum of 4:12; tile requires counter-battens over underlayment to promote cavity drainage and ventilation.

Ice Barrier Protection (Ice-and-Water Shield): In geographical areas subject to freezing temperatures and snow (where average daily temperatures in January are 25°F or less, or where ice damming occurs), IBC Section 1507.2.8.2 mandates the installation of an ice barrier . The ice barrier must consist of a self-adhering polymer-modified bitumen membrane (complying with ASTM D1970). It must extend continuously from the lowest edge of the roof eaves to a point at least 24 inches (610 mm) horizontally inside the interior warm wall line (the interior finished face of the exterior wall). In valleys, the self-adhering membrane must be installed at least 36 inches wide (18 inches on each side of the valley centerline) beneath metal valley flashings.

Below-Grade Waterproofing Systems

Subsurface building foundations (basements, elevator pits, underground parking structures) face constant moisture exposure and hydrostatic water pressure. The architectural strategy must distinguish between dampproofing (which resists moisture vapor and capillary dampness in well-draining soils with no hydrostatic head) and waterproofing (which resists continuous lateral and upward liquid water under hydrostatic head). BELOW-GRADE WATERPROOFING & DRAINAGE ASSEMBLY

  • Native Soil Backfill
  • ┌──────────────────────────────────────────────┐
  • │ Granular Backfill / Filter Fabric │
  • │ ┌────────────────────────────────────────────┤
  • │ │ Dimpled Polymeric Drainage Core Mat │
  • │ │ ┌──────────────────────────────────────────┤
  • │ │ │ Continuous Waterproofing Membrane (60 mil│
  • │ │ │ ┌────────────────────────────────────────┤
  • │ │ │ │ Concrete Foundation Wall (Reinforced) │
  • │ │ │ │ │
  • │ │ │ │ Footing Keyway ┌─────────┘
  • │ │ │ │ Continuous Waterstop ──┼──┐
  • │ │ │ │ └──┴──────┐
  • │ │ │ └────────────────────────────────────────┤
  • │ └─┴─ Perforated Perimeter Drain (Weep Tile) │ Concrete Footing
  • └─── Washed Stone Envelope in Geotextile ──────┴─────────────────
  • Waterproofing Membrane Typologies

Self-Adhering Rubberized Asphalt Sheet Membranes: Factory-controlled 60-mil (0.060") composite membranes composed of polymer-modified asphalt laminated to high-density cross-laminated polyethylene film (e.g., Bituthene). Requires primed concrete substrates, taped seams, and a protective drainage board. Offers uniform factory thickness and crack-bridging flexibility.

Fluid-Applied Elastomeric Membranes: Polyurethane, polymer-modified asphalt, or hot rubberized asphalt applied seamlessly by squeegee, roller, or spray to a thickness of 60 to 120 mils. Eliminates field seams, conforms flawlessly to complex geometry (footing keyways, pipe penetrations, irregular soil nails), and bonds tenaciously to the concrete substrate, preventing lateral water migration behind the membrane if punctured.

Bentonite Clay Systems: Sodium bentonite clay panels or geotextile-encapsulated blankets. Sodium bentonite clay swells up to 15 times its dry volume when exposed to ground moisture, expanding into a dense, impermeable gelatinous seal that automatically self-heals around small cracks and punctures. Must be installed under structural confinement (minimum 30 to 60 psf compressive backfill or slab pressure) to prevent unconfined swelling.

Blindside Waterproofing (Pre-Applied Systems): Installed in zero-lot-line urban excavations where property lines prevent excavating around the foundation perimeter. The waterproofing membrane (thick HDPE sheets coated with pressure-sensitive adhesive or bentonite mats) is fastened directly to the excavation shoring wall (sheet piling, soldier piles with timber lagging, or slurry diaphragm walls) before the concrete foundation wall is cast. When liquid concrete is poured directly against the membrane, the heat of hydration and mechanical pressure chemically lock the membrane to the curing concrete face.

Hydrostatic Pressure Mitigation & Subsurface Drainage

No below-grade waterproofing membrane should bear hydrostatic water pressure indefinitely without structural relief. A comprehensive foundation moisture control system includes:

Dimpled Polymeric Drainage Mat: High-density polyethylene (HDPE) core with molded dimples faced with a bonded non-woven geotextile filter fabric. Installed against the exterior face of the waterproofing membrane. Relieves hydrostatic pressure by providing an unobstructed vertical drainage path for groundwater while shielding the membrane from puncture during backfilling.

Perforated Perimeter Foundation Drain (Weep Tile): A minimum 4-inch (100 mm) perforated rigid PVC (ASTM D2729 or ASTM F758) or corrugated HDPE pipe set along the outside perimeter of the footing. Pipe perforations must face downward (at the 4 o'clock and 8 o'clock positions) so groundwater rises into the pipe from below and drains away by gravity without washing soil fines into the invert. The drain pipe must be surrounded by a minimum of 6 to 12 inches of clean washed gravel (ASTM C33 No. 57 stone) wrapped completely in geotextile filter fabric to prevent silt clogging, sloped minimum 1/8 inch per foot (1%) to gravity discharge or an interior duplex sump pump basin.