Study guide

1.3 Level I vs Level II vs Level III Responsibilities

ASNT NDT Level II Certification Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts 1.2 Certification Paths: SNT-TC-1A, CP-189, and ASNT Central Certification 1.3 Level I vs Level II vs Level III Responsibilities 1.4 Application, Scheduling, Identification, and Retake Rules

2 Eligibility, Fees & Recertification

2.1 Training Hours, Experience Days, and Documentation 2.2 Vision, Practical Exams, and the Employer's Written Practice 2.3 Fees, Validity, Recertification, and 529 Funding

3 NDT Fundamentals & Method Selection

3.1 What NDT Can and Cannot Detect 3.2 Surface vs Subsurface and Method Selection Logic 3.3 Product Forms: Welds, Castings, Forgings, Wrought, In-Service Damage

4 MT Principles & Flux Fields

4.1 Magnetism, Permeability, and Flux Leakage 4.2 Flux Fields: Circular vs Longitudinal 4.3 How Discontinuities Distort Magnetic Fields

5 MT Magnetization & Demagnetization

5.1 Magnetization by Electric Current: Contact, Prods, Central Conductor 5.2 Selecting the Proper Magnetization Method: Coils, Yokes, Current Type 5.3 Demagnetization Procedures and Residual Field Limits

6 MT Equipment, Evaluation & Process Control

6.1 MT Equipment, Media, and Lighting 6.2 Types of Discontinuities Detected by MT 6.3 MT Evaluation Techniques 6.4 Quality Control of MT Equipment and Processes

7 PT Principles & Materials

7.1 PT Principles: Capillarity, Wetting, and Process Physics 7.2 Penetrant Types, Methods, and Sensitivity Classes 7.3 Developers and Process Sequence Controls

8 PT Method Selection & Process Control

8.1 Selecting the Appropriate PT Method for the Job 8.2 Surface Preparation, Dwell, Removal, and Lighting 8.3 Station Equipment, Process Control, and Safety

9 PT Indications, Evaluation & Standards

9.1 Relevant, Nonrelevant, and False Indications 9.2 Evaluating Indication Size, Shape, and Persistence 9.3 PT Procedures, ASTM/ASME Standards, and Acceptance

10 RT Principles & Exposure Technique

10.1 Radiation Physics: X-ray vs Gamma, Energy, and Attenuation 10.2 Exposure Geometry, Inverse Square Law, and Geometric Unsharpness 10.3 Radiographic Technique: kV, mA-min, Screens, and Source Selection

11 RT Image Quality, Processing & Indications

11.1 Film, Digital Detectors, Density, and Image Quality Indicators 11.2 Darkroom Facilities, Processing, and Artifact Control 11.3 Radiographic Indications, Discontinuities, and Defects

12 RT Product Discontinuities & Radiation Safety

12.1 Manufacturing Processes and Associated Discontinuities 12.2 Radiological Safety: Time, Distance, Shielding, and Dose Limits 12.3 RT Procedures, Codes, and Viewing Practice

13 UT Principles & Techniques

13.1 Sound Propagation, Modes, Velocity, and Wavelength 13.2 Transducers, Couplant, and Straight-Beam Techniques 13.3 Angle-Beam Techniques, Snell's Law, and Skip Distance

14 UT Calibration & Base Material

14.1 Calibration Blocks, DAC, TCG, and Sensitivity Setting 14.2 Evaluating Base-Material Product Forms 14.3 Evaluating Weldments

15 UT Bonds, Detection & Evaluation

15.1 Evaluating Bonded Structures 15.2 Discontinuity Detection and Characterization 15.3 General Evaluation, Sizing, and Acceptance Logic

16 VT Scope, Vision & Lighting

16.1 Purpose and Scope of VT 16.2 Elements of Vision 16.3 Elements of Lighting 16.4 Contrast and Resolution

17 VT Optics, Equipment & Discontinuities

17.1 Optics and Magnification 17.2 VT Equipment: Direct, Remote, and Measuring Tools 17.3 Visual Appearance of Discontinuities

18 VT Evaluation, Codes & Employer Topics

18.1 Evaluation and Reporting 18.2 Codes, Standards, and Specifications 18.3 Employer-Specific Topics and Written-Practice Controls

19 Specific Exam: Codes & Sectors

19.1 How the Specific Exam Differs from the General Exam 19.2 General Industry Codes and Procedure Use 19.3 Pressure Equipment Sector Codes (ASME, NBIC, API context)

20 Specific Exam: Applications & Techniques

20.1 Applications: Matching Method to Product Form and Access 20.2 Technique Selection and Essential Variables 20.3 Procedure Compliance, Reporting, and Acceptance/Rejection

21 Exam Strategy & Maintenance

21.1 Timed 50+40 Strategy and CBT Rules 21.2 Common Traps by Method 21.3 Weak-Area Review and Recertification Planning

1.3 Level I vs Level II vs Level III Responsibilities

Key Takeaways Explain This Topic AI

An NDT Level I follows written instructions under the supervision of a Level II or Level III and records results; Level I does not independently interpret to code or write procedures.

An NDT Level II sets up and calibrates equipment, interprets and evaluates results to approved procedures, organizes and reports findings, and provides on-the-job guidance to trainees and Level I personnel.

An NDT Level III establishes techniques and procedures, interprets codes and specifications, designates methods, and trains and examines Level I and Level II personnel.

This study guide prepares the ASNT NDT Level II written exams. Passing Level II does not authorize procedure approval or personnel certification.

Last updated: August 2026

Why duty lines are exam content, not org-chart trivia

ASNT's career pages and every employer written practice describe NDT Level I , NDT Level II , and NDT Level III as different grants of authority. Specific-exam items and many general items are really asking: who is allowed to do this next action? If you answer from job-title habit (“I have been doing it for years”), you will pick the Level III action on a Level II question or let a Level I interpret a rejectable crack. This guide prepares Level II . Learn the ceiling as carefully as the floor.

The duty language below follows the long-standing SNT-TC-1A / CP-189 split that US written practices copy. Individual employers may tighten it; they rarely loosen the idea that procedure ownership sits at Level III and independent interpretation sits at Level II .

Define the three levels

NDT Level I is qualified to perform specific calibrations , specific NDT , and specific evaluations for acceptance or rejection — but only according to written instructions — and to record results . A Level I receives the necessary instruction and supervision from a certified Level II or Level III . “Written instructions” means a work instruction, technique sheet, or traveler that already chose the method, technique, and accept/reject rule. A Level I is not the person who decides the technique from a bare code paragraph.

NDT Level II is qualified to set up and calibrate equipment and to interpret and evaluate results with respect to applicable codes, standards, and specifications as implemented in an approved procedure . A Level II must know the scope and limitations of each method held, must organize and report results, and has assigned responsibility for on-the-job training and guidance of trainees and Level I personnel. That is the autonomous field technician ASNT describes: read the procedure, perform the inspection, document completely.

NDT Level III is capable of establishing techniques and procedures , interpreting codes, standards, specifications, and procedures , and designating the NDT methods, techniques, and procedures to be used. A Level III is responsible for the NDT operations assigned, can interpret and evaluate results in terms of existing codes when writing or qualifying techniques, needs enough materials and fabrication background to help set acceptance criteria when none exist, should have general familiarity with other NDT methods, and is capable of training and examining Level I and Level II personnel for certification. ASNT's career language adds the manager-level work: auditing documentation, supervising teams, and running the internal certification program.

  • Action Level I Level II Level III
  • Follow a technique sheet under supervision Yes Yes Yes
  • Choose and set up the technique inside an approved procedure No Yes Yes
  • Calibrate or standardize equipment for the assigned test Only as the instruction specifies Yes Yes

Interpret indications and apply acceptance criteria in the procedure Only if the written instruction already reduces the call to a specific check Yes Yes

  • Organize and sign an inspection report Records data; report ownership is usually Level II Yes Yes
  • Guide trainees and Level I personnel No Yes Yes
  • Write or approve the NDT procedure No No Yes
  • Change acceptance criteria or select a new method when the procedure is silent No No — stop and elevate Yes
  • Qualify, administer, and grade certification exams of others No No (except limited OJT coaching) Yes
  • Designate which method the written practice will use on a new product No Recommend only Yes
  • What “interpret and evaluate per procedure” actually allows

Level II authority is broad inside a procedure and narrow outside it.

Inside the procedure , a Level II may:

Select among allowed techniques (for example, yoke versus coil, water-washable versus post-emulsifiable, 0-degree versus angle beam) when the procedure lists those options and the selection rules.

Set instrument controls, magnetization current, exposure, or scanning pattern to the procedure's essential variables.

Characterize indications as relevant, nonrelevant, or false using the method's evaluation rules.

Apply the acceptance standard named in the procedure (a workmanship table, an ASME reference, a customer spec).

Reject a part, request blend-and-reinspect, or accept it, and own the report .

Stop a Level I who is skipping a process-control check.

Outside the procedure , a Level II must stop . Examples that belong to Level III:

The procedure does not cover this alloy, thickness, or geometry.

The customer wants a different acceptance class than the procedure states.

A new technique (phased array instead of conventional shear wave, digital radiography instead of film) is proposed.

Someone asks you to “just initial” a procedure revision.

The written practice needs a new exam or a reduced experience alternative.

Some shops authorize experienced Level IIs to draft work instructions that implement a Level III procedure on a specific part. That is still Level II work only when the Level III procedure already exists and the Level III (or the written practice) allows the draft. Writing the procedure that cites the code is Level III work. The post-15-December-2026 MT outline even lists “develop MT work instructions” as a future general-exam duty; that does not move procedure approval down to Level II.

Supervision, reporting, and the Level I relationship

“Supervision” of a Level I is not the same as standing over every yoke stroke. It means the Level II (or III) has assigned the work, confirmed the instruction is the right one, is available to resolve indications the instruction does not cover, and reviews the records. A Level I who finds an unexpected linear indication should not close the report as “accept — grinding mark.” That call is Level II interpretation.

Reporting is a Level II skill the VT, MT, PT, RT, and UT outlines all test. A complete Level II report identifies the procedure and revision, the part and product form, the technique essential variables, calibration or process-control results, indication descriptions (location, size, type), and the accept/reject decision against the named standard. “NDT OK” with no essentials is not a Level II report.

Level II also guides Level I and trainees. Guidance includes demonstrating a setup, checking a concentration test, and explaining why a magnetic-writing indication is nonrelevant. Guidance does not include letting the Level I invent a new technique or signing a certification record as if you were the Level III examiner.

Realistic shop scenarios

Yoke weld exam. A Level I, working to a technique sheet, performs a yoke examination on a fillet weld and records a linear powder buildup at the toe. The sheet says “record all linear indications and notify Level II.” The Level II measures the indication, compares it to the visual plus MT acceptance table in the welding procedure specification, and rejects the weld. The Level I correctly stopped . The Level II correctly interpreted . Rewriting the acceptance table after the customer complains is Level III (and customer) work.

Silent geometry. A Level II UT technician is asked to inspect a branch connection the procedure never sketches. The technician may not invent a scan plan and call it “equivalent.” The correct action is to stop and obtain a Level III technique extension or a revised procedure. Specific-exam items punish the heroic improviser.

Training request. A supervisor tells a Level II to “certify” two new hires because the Level III is on vacation. The Level II may give on-the-job training and may sign as the person who observed practice hours if the written practice allows. The Level II may not write the certification, administer the qualification exams, or issue the employer certificate. Those are Level III (and written-practice) acts.

Procedure conflict. Two codes named in a job package disagree on lighting intensity for fluorescent MT. Choosing which code governs, or writing a procedure that resolves the conflict, is Level III . The Level II follows the approved procedure once it exists and documents the light-meter reading it requires.

Hold a simple test in your head on every duty item: instruction follower (I), procedure user and reporter (II), procedure and program owner (III). This study guide trains the middle box — the ASNT NDT Level II written exams — not the Level III Basic exam and not a Level I checklist course.