7.3 Documentation, Reporting & Acceptance Criteria
ASNT NDT Level III Certification Exam Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Strategy
1.1 Exam Structure, Basic + Method Exams & Scoring 1.2 How to Study & Test-Taking Strategy
2 Certification Programs & Documents
2.1 SNT-TC-1A: The Employer-Based Recommended Practice 2.2 CP-189, CP-105, NAS 410 & ISO 9712 2.3 Level I/II/III Responsibilities, Eligibility & Recertification
3 Level III Duties, Ethics & Program Oversight
3.1 Level III Duties & the Written Practice 3.2 Ethics & Professional Conduct 3.3 Audits, Records & Certification-Program Control
4 NDT Training & Personnel Qualification
4.1 Training Program Design & Curriculum 4.2 Examination Development & Grading 4.3 Practical/Hands-on Oversight, Competency Evaluation & Vision Requirements
5 Materials Science & Manufacturing Processes
5.1 Metallurgy & Material Properties 5.2 Manufacturing Processes & Heat Treatment 5.3 Product Forms & Service Conditions
6 Discontinuities & Their Origins
6.1 Discontinuity Classes 6.2 Typical Discontinuities by Product Form
7 Codes, Standards & Procedures
7.1 Codes vs Standards vs Specifications 7.2 Written Procedures & Technique Sheets 7.3 Documentation, Reporting & Acceptance Criteria
8 Visual & Penetrant Testing (VT, PT)
8.1 Visual Testing (VT) 8.2 Penetrant Testing — Process & Materials 8.3 PT Applications, Capabilities & Limitations
9 Magnetic Particle & Electromagnetic Testing (MT, ET)
9.1 Magnetic Particle Testing 9.2 Eddy Current Testing 9.3 Related Electromagnetic Methods & Comparison
10 Ultrasonic Testing (UT)
10.1 UT Physics 10.2 Equipment & Techniques 10.3 Calibration, Applications, Capabilities & Limitations
11 Radiographic Testing (RT)
11.1 RT Physics 11.2 Technique & Image Quality 11.3 Radiation Safety, Applications, Capabilities & Limitations
12 Other Methods & Method Selection
12.1 Leak Testing & Acoustic Emission 12.2 Infrared/Thermal & Other Methods 12.3 Method Selection & Comparison Matrix
7.3 Documentation, Reporting & Acceptance Criteria
Key Takeaways Explain This Topic AI
A complete NDT report supports reconstruction of what was done: part identification, procedure number and revision, equipment and calibration status, technique, results, acceptance basis, and examiner identity, level, and date.
Records retention is set by the governing code, contract, and employer written practice; personnel certification records are kept per SNT-TC-1A or CP-189, and examination records or radiographs per the construction code or contract.
Acceptance criteria come only from the governing code, standard, specification, drawing, or contract; if the job is silent, the Level III obtains the controlling criteria before any accept/reject decision.
Ladder of terms: an indication is any NDT response; a relevant indication is caused by a discontinuity that must be evaluated (commonly one exceeding 1/16 in or 1.6 mm); a defect is a discontinuity that fails the acceptance criteria and is rejectable.
Every defect is a discontinuity, but not every discontinuity is a defect — only those that fail acceptance criteria.
Last updated: July 2026
Reports and Documentation
The purpose of an NDT report is traceability — the ability to reconstruct exactly what was done, support a technical review or audit, and stand up to legal scrutiny years later. A Level III designs report forms so that no critical detail depends on memory. A complete examination report normally captures:
Part/component identification — serial, heat, weld, or joint number and location.
Procedure number and revision used.
Method and technique with the actual parameters.
Equipment identification and its calibration/verification status .
Reference standards / Image Quality Indicator (IQI) used.
Results — indications recorded by location, size/length, and type.
Acceptance criteria basis — the code, specification, or drawing applied.
Disposition — accept, reject, or referred for engineering evaluation.
Examiner name, certification level, and date , plus Level III review/approval where required.
The reason each of these matters is a common exam theme: part ID, procedure revision, and equipment/calibration status exist so the examination can be reconstructed and audited , not merely filed.
Records Retention
How long records are kept is set by the governing code, the contract, and the employer written practice — there is no single universal number, and a Level III must cite the applicable source rather than guess. In practice:
Record type Retention basis Typical practice
Personnel certification files SNT-TC-1A / ANSI-ASNT CP-189, written practice At least through the current certification cycle
Examination reports Construction code + contract Often a stated minimum (for example five years) or the life of the component
- Radiographs / raw data Contract / code Retained and archived per the purchaser's requirement
- Procedures and revisions Written practice / quality manual Controlled, with superseded versions archived
- Acceptance Criteria — Where They Come From
Acceptance criteria are not invented by the technician or the Level III. They come only from the applicable code, standard, specification, drawing, or contract requirement. When a purchase order requires an examination but neither the PO nor the local procedure states limits, the correct Level III action is to obtain the controlling acceptance criteria from the governing code/specification or from documented customer/engineering direction before any accept or reject decision is made. Codes express these limits quantitatively — for surface methods, a linear indication is one whose length is at least three times its width, while a rounded indication is shorter than that; radiographic and ultrasonic codes set porosity charts, slag-length limits, and amplitude/length limits keyed to material thickness.
Indication, Relevant Indication, and Defect
The most tested vocabulary ladder in this domain separates four terms. Confusing them is the classic trap, because a technician who calls every discontinuity a "defect" over-rejects good hardware.
- Term Meaning Action
- Indication Any response the method produces (a mark, signal, or spot) Says only "look here"
Nonrelevant indication Caused by geometry, part configuration, or process, not a real discontinuity Documented, then dismissed
Relevant indication Caused by a discontinuity that must be evaluated, commonly one exceeding 1/16 in (1.6 mm) Evaluate against acceptance criteria
- Discontinuity An interruption in the normal structure of the part May or may not be rejectable
- Defect A discontinuity that fails the acceptance criteria Rejectable — disposition required
The rule to memorize: every defect is a discontinuity, but not every discontinuity is a defect. A discontinuity only becomes a defect once it fails the governing acceptance criteria. Likewise, an indication is only relevant once it is shown to arise from a discontinuity that the code says must be evaluated.
Disposition of Indications
After evaluation, a relevant indication is dispositioned three ways: accept (within criteria), reject/repair (a defect, removed or repaired then re-inspected), or referred for engineering evaluation — a fitness-for-service or use-as-is judgment made by engineering when the code allows it. The Level III owns the traceable trail from indication to disposition and never dispositions without a documented acceptance basis.
Worked Example: From Signal to Disposition
An angle-beam ultrasonic scan of a groove weld produces a reflector at 40 percent of the distance-amplitude-correction (DAC) curve. Walk the ladder. The response on the screen is an indication . The inspector confirms it does not come from the weld root geometry or a mode-converted signal, so it is a relevant indication — a real discontinuity that must be evaluated. The Level III then compares its amplitude and length against the invoked code's limits. If it stays within the amplitude and length allowed for that thickness, the discontinuity is acceptable and the weld is accepted ; if it exceeds the limit, that discontinuity is now a defect and the weld is rejected for repair and re-inspection, or referred to engineering for a documented use-as-is evaluation where the code permits it. Every step is written down with the code basis, so an auditor can reconstruct the call.
Auditability and Calibration Traceability
Audit-readiness is why calibration and verification records ride along with the report. Current calibration status shows that measurements and indications are supported by controlled equipment, and the IQI or reference standard proves the technique achieved the required sensitivity that day. The best audit evidence that certification and examination records are controlled is a sampling of traceable files — training, experience, vision, examinations, procedure revisions, and current status — that hang together and reconstruct what was done.
Common Traps
Calling every discontinuity a defect and over-rejecting acceptable hardware.
Dispositioning before securing a documented acceptance basis.
Filing a report with no procedure revision, equipment ID, or calibration status, breaking traceability.
Assuming one universal retention period instead of citing the code, contract, and written practice.