13.1 Risk Assessment Inputs, Monitoring, and Control Plans

ASQ Certified Quality Technician CQT

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Quality Philosophies, Principles, and Management Systems

1.1 Quality Philosophies & Pioneers 1.2 Quality Management Systems, Standards & Documentation 1.3 Customer-Supplier Relationships & Quality Culture

2 Chapter 2: Cost of Quality, Teams, and Professional Ethics

2.1 Cost of Quality (COQ) & Economic Trade-Offs 2.2 Quality Improvement Teams & Meeting Management 2.3 Professional Conduct & ASQ Code of Ethics

3 Chapter 3: Basic Quality Tools & Continuous Improvement

3.1 Process Mapping, Flowcharts, and SIPOC 3.2 Cause-and-Effect Analysis & Check Sheets 3.3 Pareto Analysis & Prioritization 3.4 Histograms & Scatter Diagrams

4 Chapter 4: Descriptive Statistics and Probability Distributions

4.1 Data Types, Sampling Methods, and Populations 4.2 Measures of Central Tendency and Dispersion 4.3 Normal Distribution & Z-Score Calculations 4.4 Discrete Distributions: Binomial, Poisson, and Hypergeometric

5 Chapter 5: Statistical Process Control (SPC) Fundamentals & Variables Charts

5.1 SPC Fundamentals & Process Variation 5.2 Control Limits vs. Specification Limits 5.3 X-bar and R Charts 5.4 X-bar & s Charts and Individual-Moving Range (I-MR) Charts

6 Chapter 6: Attributes Control Charts and Out-of-Control Patterns

6.1 Control Charts for Nonconforming Units: p and np Charts 6.2 Control Charts for Nonconformities: c and u Charts 6.3 Out-of-Control Rules & Process Analysis

7 Chapter 7: Process Capability and Performance Analysis

7.1 Process Stability Prerequisite & Capability Basics 7.2 Potential Capability (Cp) and Actual Capability (Cpk) 7.3 Process Performance (Pp, Ppk) and Long-Term vs. Short-Term Variation 7.4 One-Sided Tolerances and PPM Defect Calculations

8 Chapter 8: Metrology Fundamentals, Standards, and Calibration

8.1 Metrology Foundations & Environmental Controls 8.2 Precision Gage Blocks & Standards Hierarchy 8.3 Calibration Systems & NIST Traceability 8.4 Out-of-Calibration Procedures & Reverse Traceability 8.5 M&TE Identification, Control, and Customer-Supplied Equipment

9 Chapter 9: Measurement Instruments and Measurement System Analysis (Gage R&R)

9.1 Common Dimensional Hand Measuring Instruments 9.2 Fixed Gages, Optical Comparators, and CMM Systems 9.3 Measurement System Analysis: Bias, Linearity, and Stability 9.4 Variable Gage R&R: Repeatability and Reproducibility 9.5 Electronic, Weighing, and Force Measurement Equipment

10 Chapter 10: Technical Drawings, Tolerancing, and GD&T (ASME Y14.5)

10.1 Engineering Drawing Basics & Projection Methods 10.2 Datums and the Datum Reference Frame 10.3 Form and Orientation Controls in GD&T 10.4 Location, Profile, and Runout Controls with Modifiers 10.5 Classification of Product Characteristics and Defects

11 Chapter 11: Inspection Planning, Sampling Plans, and Material Disposition

11.1 Inspection Planning & Inspection Points 11.2 Acceptance Sampling & ANSI/ASQ Z1.4 11.3 Switching Rules & Variables Sampling (Z1.9) 11.4 Nonconforming Material Control & MRB Dispositions 11.5 Types of Measurements, Unit Conversion, and Rounding Rules

12 Chapter 12: Quality Audits

12.1 Quality Auditing Principles & Types 12.2 The Audit Process: Planning, Performance, and Reporting 12.3 Audit Tools and Techniques

13 Chapter 13: Risk Management, Corrective and Preventive Action, and Safety

13.1 Risk Assessment Inputs, Monitoring, and Control Plans 13.2 FMEA, Action Priority, and Technician Workplace Safety 13.3 Root Cause Analysis & Problem-Solving 13.4 Corrective and Preventive Action (CAPA) & Verification 13.5 Preventive Action, Mistake-Proofing, and Read-Across

13.1 Risk Assessment Inputs, Monitoring, and Control Plans

Key Takeaways Explain This Topic AI

ISO 9001:2015 clause 6.1 replaced the standalone preventive action clause with risk-based thinking, requiring organizations to determine risks and opportunities affecting conformity, plan actions to address them, and evaluate the effectiveness of those actions.

Risk assessment inputs include customer complaints, field and warranty returns, internal scrap and rework, SPC and capability trends, product and process monitoring reports, supplier performance, audit findings, near-misses, and change events.

Sorting the same defect count by where it was found -- in-process, final inspection, or the customer -- converts routine reject data into a risk signal about which control failed.

A control plan lists, for each operation, the characteristic and its classification, the specification, the measurement technique, the sample size and frequency, the control method, and the reaction plan; the reaction plan is what tells the operator what to contain, whom to notify, and what to stop.

The four mitigation strategies are avoid or eliminate, reduce or mitigate, transfer or share, and accept -- and acceptance is legitimate only when it is explicit, documented, monitored, and carries a defined review trigger.

Last updated: September 2026

  • 13.1 Risk Assessment Inputs, Monitoring, and Control Plans
  • Risk-Based Thinking Replaced the Preventive Action Clause

ISO 9001:2015 clause 6.1 (Actions to Address Risks and Opportunities) requires an organization to determine the risks and opportunities that could affect conformity of products and services and the ability to enhance customer satisfaction, to plan actions to address them, and to evaluate the effectiveness of those actions. This clause replaced the standalone preventive-action clause that existed in earlier editions: risk-based thinking is preventive action, built into every process instead of sitting in its own procedure .

For a quality technician this is not a documentation detail. It changes the daily question from "did this part conform?" to "what is this data telling me is about to go wrong?"

Risk in this context is the effect of uncertainty on an expected result — an effect that may be negative (a threat) or positive (an opportunity). Risk assessment combines two dimensions: Risk = f ( Severity of the consequence , Likelihood of occurrence ) \text{Risk} = f(\text{Severity of the consequence},\ \text{Likelihood of occurrence}) Risk = f ( Severity of the consequence , Likelihood of occurrence )

and, in failure-mode work, a third: how likely the organization is to detect the problem before the customer does (Section 13.2).

The Methods of Risk Assessment and Mitigation

Method What it evaluates Where a technician meets it

Trend analysis (SPC) Whether a process is drifting toward a limit before it violates one Control charts, capability trending, monthly PPM charts

FMEA (DFMEA and PFMEA) Which failure modes carry the highest combination of severity, occurrence, and detection PFMEA reviews, Action Priority ratings (Section 13.2)

Root cause analysis Why a realized failure occurred, so the same risk is eliminated 5 Whys, 8D, fault tree (Section 13.3)

Product and process monitoring reports Whether performance is holding over time Scrap and rework reports, first-pass yield, audit results, gage R&R trending

Risk matrix / risk register Relative priority across many dissimilar risks Cross-functional risk reviews, new-product launches

Control plans Which controls are in place at each operation, and what happens when they fail The control plan posted at the operation

ISO 14971 provides the formal risk-management framework for medical devices, and IATF 16949 requires control plans and FMEAs as standing automotive requirements, but the underlying logic is identical everywhere: identify what can go wrong, rank it, control it, and monitor whether the control is working.

Inputs to Risk Assessment

Risk assessment is only as good as the data fed into it. A technician is usually the person closest to several of these inputs.

Input What it signals How a technician reads it

Customer complaints Problems the internal system failed to catch Pareto by defect type, by part number, and by customer; a rising count on one defect type is a signal even if each complaint is small

Field and warranty returns Failures that survived all internal controls and reached service Returns per thousand units by build month; a rising cohort points at a change made in that period

Internal scrap and rework Where the process is losing money and stability Scrap dollars by operation; rework hours by defect; both are Cost of Poor Quality (Section 2.1)

SPC and capability trends Drift, shift, increased dispersion before a specification violation Run rules on the control chart; a declining Cpk trend across months

Product and process monitoring reports Aggregate health of an operation First-pass yield, downtime, tool life against plan, in-process reject rate

Supplier performance Incoming risk Supplier PPM, on-time delivery, SCAR count, receiving inspection reject rate

Internal and external audit findings Systemic weaknesses not yet visible in product data Repeat findings against the same clause across areas

Near-misses and close calls Failures that were caught by luck rather than by control Caught-at-final-inspection escapes that should have been caught in-process

Change events The single largest source of new risk New material, new supplier, new operator, new tool, engineering change, relocation

Important

Escapes matter more than rejects. A defect found at in-process inspection is the system working. The same defect found at final inspection means an in-process control failed. The same defect found by the customer means every control failed. Sorting the same defect count by where it was found converts ordinary reject data into a risk signal about the control system.

Trend Analysis: Using SPC as a Risk Tool

Control charts are usually taught as a process-control tool; the Body of Knowledge lists trend analysis (SPC) as a risk assessment method, and the difference is the time horizon.

  • Control use Risk use
  • "Is this subgroup out of control right now?" "Is this process moving toward a limit over weeks?"
  • Reacts to a single out-of-control signal Reacts to a pattern of small, consistent movement

Chart of the characteristic Chart of the metric: monthly PPM, weekly scrap dollars, Cpk by month, returns per thousand

Three risk-relevant patterns (the run rules of Section 6.3 applied to management metrics):

A trend — six or more consecutive points moving in one direction — on a Cpk-by-month chart means the process is deteriorating even if no part has yet been rejected. Tool wear, fixture wear, and supplier drift all look like this.

A shift — nine or more consecutive points on one side of the centerline — after a known change confirms the change had an effect, whether or not anybody expected one.

Increasing dispersion — a widening range chart with a stable average — is the classic precursor to a capability failure, because Cpk erodes from the spread rather than from the mean.

Charting a metric rather than a characteristic also protects against the most common management error: treating every monthly movement as a special cause. Applying control-chart logic to a scrap-rate metric tells you whether last month's increase is a signal or noise, which decides whether a corrective action is warranted at all.

Control Plans

A control plan is the document that states, operation by operation, what is controlled, how, how often, by whom, and what happens when the control detects a problem. It is the bridge between the PFMEA (what could go wrong) and the work instruction (what the operator does).

The Three Types

  • Type When it applies Characteristic emphasis
  • Prototype During prototype builds Heavy dimensional and material measurement to learn the process

Pre-launch After prototype, before full production sign-off Increased inspection frequency and additional controls until the process proves stable

Production Ongoing mass production Normal frequencies, SPC where appropriate, reaction plans in place

Pre-launch control plans deliberately over-inspect. Moving to the production control plan too early — before capability and stability are demonstrated — is one of the most common launch failures.

What a Control Plan Contains

  • Column Content
  • Part / process number and name Which operation
  • Machine, device, jig, tool What performs the operation
  • Characteristic (product and process) What is being controlled, with its classification symbol (Section 10.5)
  • Specification / tolerance The requirement
  • Evaluation / measurement technique Which gage or method, tied to a specific M&TE type
  • Sample size and frequency How many, how often
  • Control method SPC chart, check sheet, error-proofing device, 100 percent automated gage

Reaction plan Exactly what happens when the control detects a nonconformity: contain what, notify whom, stop what

Caution

The reaction plan is the column technicians are tested on. A control plan that specifies a characteristic, a gage, and a frequency but leaves the reaction plan blank has documented detection without documenting response. When an out-of-control point appears, the operator does not know whether to stop the machine, how far back to contain, or whom to call, and the containment boundary expands with every minute of confusion.

Keeping the Three Documents Consistent

The PFMEA, the control plan, and the work instruction must agree. A PFMEA that calls for a torque check every hour, a control plan that says once per shift, and a work instruction that mentions no torque check at all is a systemic finding regardless of which document is right. When any one of them changes, the other two are reviewed — and a control plan is always reviewed after a nonconformance, a customer complaint, an engineering change, or a process change.

  • Ranking and Mitigating Risk
  • The Risk Matrix

Ranking dissimilar risks requires a common scale. A simple matrix crosses consequence against likelihood: LIKELIHOOD

  • Rare Unlikely Possible Likely Frequent
  • +--------+--------+--------+--------+--------+
  • Severe | MEDIUM | HIGH | HIGH | EXTREME| EXTREME|
  • +--------+--------+--------+--------+--------+
  • Major | LOW | MEDIUM | HIGH | HIGH | EXTREME|
  • S +--------+--------+--------+--------+--------+
  • E Moderate | LOW | LOW | MEDIUM | HIGH | HIGH |
  • V +--------+--------+--------+--------+--------+
  • E Minor | LOW | LOW | LOW | MEDIUM | MEDIUM |
  • R +--------+--------+--------+--------+--------+
  • I Negligible| LOW | LOW | LOW | LOW | MEDIUM |
  • T +--------+--------+--------+--------+--------+
  • Y

The matrix is a communication tool, not a calculation. Its value is forcing a cross-functional team to agree on where each risk sits, and its danger is the same arithmetic trap as the Risk Priority Number (Section 13.2): a high-severity, low-likelihood risk can be scored down into complacency. Severity is never reduced by argument — it is reduced only by changing the design or the consequence.

The Four Mitigation Strategies

Strategy Meaning Manufacturing example

Avoid / eliminate Remove the source of the risk entirely Redesign so the part cannot be assembled backwards; eliminate a hazardous solvent

Reduce / mitigate Lower the likelihood or the consequence Error-proof the fixture; add an in-process automated gage; tighten the control plan frequency

Transfer / share Move the consequence to another party Insurance; contractual allocation; outsourcing a special process to a qualified specialist

Accept Retain the risk deliberately, with monitoring A low-severity cosmetic risk retained with a trend chart and a review trigger

Acceptance is a legitimate decision only when it is explicit, documented, and monitored . Undocumented acceptance is just an unmanaged risk with a better name.

Worked Example: Reading the Inputs Before Anything Fails

Situation : A machining cell has shipped no nonconforming parts in six months. The technician assembles the monthly monitoring data:

  • Month Cpk (bore dia.) In-process rejects Final-inspection catches Customer complaints
  • April 1.68 11 0 0
  • May 1.61 14 0 0
  • June 1.55 13 1 0
  • July 1.47 19 2 0
  • August 1.41 22 3 1

Analysis :

Cpk shows a five-point downward trend. No specification has been violated, but capability is eroding steadily — the signature of progressive tool, fixture, or spindle wear.

The escape location is migrating downstream. Final-inspection catches rose from 0 to 3, meaning the in-process control is no longer catching what it used to. This is a risk signal about the control , not only about the process.

The first customer complaint arrived in August , after eight months of data that predicted it.

Action : This is a risk-assessment finding, not a nonconformance. Raise it through the control-plan review: investigate the wear mechanism, tighten the in-process frequency as an interim control, evaluate a PFMEA update for occurrence and detection ratings, and set a monitoring trigger on the Cpk trend. Waiting for a rejected lot would have converted a preventable trend into a corrective action and a customer escape.

Common Exam Traps for CQT Candidates

Caution

Trap 1: Believing ISO 9001:2015 removed preventive action. It removed the separate clause and distributed the requirement through risk-based thinking in clause 6.1. The obligation is stronger, not weaker.

Trap 2: Treating every monthly movement in a metric as a special cause. Apply control-chart logic to the metric first; reacting to noise is tampering (Section 5.1).

Trap 3: Counting defects without sorting them by where they were found. In-process, final, and customer discovery carry completely different risk meanings for the same defect.

Trap 4: Leaving the reaction plan column blank. A control plan that detects without prescribing a response leaves containment to improvisation.

Trap 5: Scoring severity down. Likelihood and detection can be improved by controls; severity changes only when the design or the consequence changes.

Trap 6: Letting the PFMEA, control plan, and work instruction drift apart. Inconsistency among the three is a systemic finding by itself.

Trap 7: Accepting a risk silently. Acceptance must be explicit, documented, monitored, and have a defined review trigger.

Loading diagram... Risk Inputs, Assessment, Mitigation, and the Control Plan Loop