Study guide
5.4 X-bar & s Charts and Individual-Moving Range (I-MR) Charts
ASQ Certified Quality Technician CQT
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Quality Philosophies, Principles, and Management Systems
1.1 Quality Philosophies & Pioneers 1.2 Quality Management Systems, Standards & Documentation 1.3 Customer-Supplier Relationships & Quality Culture
2 Chapter 2: Cost of Quality, Teams, and Professional Ethics
2.1 Cost of Quality (COQ) & Economic Trade-Offs 2.2 Quality Improvement Teams & Meeting Management 2.3 Professional Conduct & ASQ Code of Ethics
3 Chapter 3: Basic Quality Tools & Continuous Improvement
3.1 Process Mapping, Flowcharts, and SIPOC 3.2 Cause-and-Effect Analysis & Check Sheets 3.3 Pareto Analysis & Prioritization 3.4 Histograms & Scatter Diagrams
4 Chapter 4: Descriptive Statistics and Probability Distributions
4.1 Data Types, Sampling Methods, and Populations 4.2 Measures of Central Tendency and Dispersion 4.3 Normal Distribution & Z-Score Calculations 4.4 Discrete Distributions: Binomial, Poisson, and Hypergeometric
5 Chapter 5: Statistical Process Control (SPC) Fundamentals & Variables Charts
5.1 SPC Fundamentals & Process Variation 5.2 Control Limits vs. Specification Limits 5.3 X-bar and R Charts 5.4 X-bar & s Charts and Individual-Moving Range (I-MR) Charts
6 Chapter 6: Attributes Control Charts and Out-of-Control Patterns
6.1 Control Charts for Nonconforming Units: p and np Charts 6.2 Control Charts for Nonconformities: c and u Charts 6.3 Out-of-Control Rules & Process Analysis
7 Chapter 7: Process Capability and Performance Analysis
7.1 Process Stability Prerequisite & Capability Basics 7.2 Potential Capability (Cp) and Actual Capability (Cpk) 7.3 Process Performance (Pp, Ppk) and Long-Term vs. Short-Term Variation 7.4 One-Sided Tolerances and PPM Defect Calculations
8 Chapter 8: Metrology Fundamentals, Standards, and Calibration
8.1 Metrology Foundations & Environmental Controls 8.2 Precision Gage Blocks & Standards Hierarchy 8.3 Calibration Systems & NIST Traceability 8.4 Out-of-Calibration Procedures & Reverse Traceability 8.5 M&TE Identification, Control, and Customer-Supplied Equipment
9 Chapter 9: Measurement Instruments and Measurement System Analysis (Gage R&R)
9.1 Common Dimensional Hand Measuring Instruments 9.2 Fixed Gages, Optical Comparators, and CMM Systems 9.3 Measurement System Analysis: Bias, Linearity, and Stability 9.4 Variable Gage R&R: Repeatability and Reproducibility 9.5 Electronic, Weighing, and Force Measurement Equipment
10 Chapter 10: Technical Drawings, Tolerancing, and GD&T (ASME Y14.5)
10.1 Engineering Drawing Basics & Projection Methods 10.2 Datums and the Datum Reference Frame 10.3 Form and Orientation Controls in GD&T 10.4 Location, Profile, and Runout Controls with Modifiers 10.5 Classification of Product Characteristics and Defects
11 Chapter 11: Inspection Planning, Sampling Plans, and Material Disposition
11.1 Inspection Planning & Inspection Points 11.2 Acceptance Sampling & ANSI/ASQ Z1.4 11.3 Switching Rules & Variables Sampling (Z1.9) 11.4 Nonconforming Material Control & MRB Dispositions 11.5 Types of Measurements, Unit Conversion, and Rounding Rules
12 Chapter 12: Quality Audits
12.1 Quality Auditing Principles & Types 12.2 The Audit Process: Planning, Performance, and Reporting 12.3 Audit Tools and Techniques
13 Chapter 13: Risk Management, Corrective and Preventive Action, and Safety
13.1 Risk Assessment Inputs, Monitoring, and Control Plans 13.2 FMEA, Action Priority, and Technician Workplace Safety 13.3 Root Cause Analysis & Problem-Solving 13.4 Corrective and Preventive Action (CAPA) & Verification 13.5 Preventive Action, Mistake-Proofing, and Read-Across
5.4 X-bar & s Charts and Individual-Moving Range (I-MR) Charts
Key Takeaways Explain This Topic AI
The X-bar and s control chart pair is preferred over X-bar and R charts when subgroup sample size is large (n ≥ 10) or when subgroup sizes vary, because sample standard deviation (s) utilizes all data points while range (R) relies solely on extreme values.
For X-bar and s charts, control limits are calculated using factors A3, B3, and B4, and the process standard deviation is estimated as sigma_hat = s-bar / c4.
Individual and Moving Range (I-MR or X-MR) charts are deployed when rational subgrouping is impossible or uneconomical, such as in destructive testing, slow cycle times, homogeneous fluids, or automated 100% inspection (n = 1).
On an I-MR chart with span 2, control limits for individual readings are UCL_X, LCL_X = X-bar ± 2.660 * MR-bar (using factor E2 = 2.660), while for moving range UCL_MR = 3.267 * MR-bar and LCL_MR = 0.
I-MR charts carry critical statistical limitations: they lack Central Limit Theorem protection (making them highly sensitive to non-normality) and consecutive moving ranges are mathematically correlated, inducing artificial runs.
Last updated: September 2026
5.4 X-bar & s Charts and Individual-Moving Range (I-MR) Charts
While the classic X ˉ \bar{X} X ˉ and R R R chart is ideal for standard manufacturing operations with small subgroup sizes ( n = 4 n = 4 n = 4 or 5 5 5 ), quality technicians frequently encounter operational environments where the range chart is either statistically inefficient or physically impossible to deploy.
When automated coordinate measuring machines (CMMs) collect large subgroups of data ( n ≥ 10 n \ge 10 n ≥ 10 ), or when parts arrive in variable lot sizes, the sample range discards valuable information, mandating the X ˉ \bar{X} X ˉ and s s s control chart . Conversely, when parts take 18 hours to machine, tests destroy expensive aerospace components, or a single 5,000-gallon chemical tank is mixed, subgrouping multiple parts is meaningless, mandating the Individual and Moving Range ( I − M R I-MR I − MR ) chart .
Mastering these two advanced variables charting techniques is essential for the ASQ CQT examination and modern quality engineering practice.
- 1. X ˉ \bar{X} X ˉ and s s s Control Charts: When and Why to Replace the Range
- The Statistical Inefficiency of Range for Large Samples
The sample range ( R = X max − X min R = X_{\max} - X_{\min} R = X m a x − X m i n ) is computationally simple, which made it the standard in the pre-computer era of 1930s shop-floor math. However, the range suffers from a fatal theoretical flaw: it utilizes only two data points (the highest and the lowest), completely ignoring all intermediate observations.
As subgroup sample size ( n n n ) increases, the statistical efficiency of R R R relative to the sample standard deviation ( s s s ) drops precipitously:
At n = 2 n = 2 n = 2 , relative efficiency is 100% ( R R R and s s s contain identical information).
At n = 5 n = 5 n = 5 , relative efficiency is 95.5% (a tiny, acceptable loss of efficiency).
At n = 10 n = 10 n = 10 , relative efficiency drops to 85.0% .
At n = 15 n = 15 n = 15 , relative efficiency plummets to 75.5% .
At n = 25 n = 25 n = 25 , relative efficiency is under 65% .
In samples of n ≥ 10 n \ge 10 n ≥ 10 , an extreme outlier artificially inflates the range, while significant clustering or shift among the remaining 8 or 9 parts goes completely undetected. The sample standard deviation ( s s s ) evaluates the distance of every single data point from the subgroup mean, making it a far more robust and efficient measure of dispersion.
When to Select an X ˉ \bar{X} X ˉ and s s s Chart
Subgroup Sample Size n ≥ 10 n \ge 10 n ≥ 10 : Industry standards universally mandate switching from R R R to s s s when n ≥ 10 n \ge 10 n ≥ 10 (many automotive and aerospace standards mandate s s s at n ≥ 9 n \ge 9 n ≥ 9 ).
Variable Subgroup Sizes ( n i ≠ n n_i \ne n n i = n ) : When subgroups contain different numbers of parts (e.g., due to missing parts, tool breakdowns, or varying production lot runs), range charts cannot be mathematically standardized without complex adjustments. The s s s chart accommodates varying sample sizes seamlessly.
Automated and Computerized Data Systems : Modern digital calipers, inline optical probes, and CMMs compute standard deviation instantaneously, eliminating any computational barrier.
2. Mathematical Formulas and Factors for X ˉ \bar{X} X ˉ and s s s Charts
For a study of k k k subgroups with sample size n n n :
Subgroup Statistics
For each subgroup i i i ( i = 1 , 2 , … , k i = 1, 2, \dots, k i = 1 , 2 , … , k ):
Subgroup Average ( X ˉ i \bar{X}_i X ˉ i ) : X ˉ i = ∑ j = 1 n X i j n \bar{X}_i = \frac{\sum_{j=1}^n X_{ij}}{n} X ˉ i = n ∑ j = 1 n X ij
Subgroup Sample Standard Deviation ( s i s_i s i ) : s i = ∑ j = 1 n ( X i j − X ˉ i ) 2 n − 1 s_i = \sqrt{\frac{\sum_{j=1}^n (X_{ij} - \bar{X}_i)^2}{n - 1}} s i = n − 1 ∑ j = 1 n ( X ij − X ˉ i ) 2
Centerlines
Grand Mean ( X ˉ ˉ \bar{\bar{X}} X ˉ ˉ ) : X ˉ ˉ = 1 k ∑ i = 1 k X ˉ i \bar{\bar{X}} = \frac{1}{k} \sum_{i=1}^k \bar{X}_i X ˉ ˉ = k 1 i = 1 ∑ k X ˉ i
Average Sample Standard Deviation ( s ˉ \bar{s} s ˉ ) : s ˉ = 1 k ∑ i = 1 k s i \bar{s} = \frac{1}{k} \sum_{i=1}^k s_i s ˉ = k 1 i = 1 ∑ k s i
Dispersion ( s s s ) Chart Control Limits
As with X ˉ − R \bar{X}-R X ˉ − R charts, process dispersion must be evaluated first using factors B 3 B_3 B 3 and B 4 B_4 B 4 : U C L s = B 4 s ˉ UCL_s = B_4 \bar{s} U C L s = B 4 s ˉ C L s = s ˉ CL_s = \bar{s} C L s = s ˉ L C L s = B 3 s ˉ LCL_s = B_3 \bar{s} L C L s = B 3 s ˉ
(Note: B 3 = 0 B_3 = 0 B 3 = 0 for n ≤ 5 n \le 5 n ≤ 5 . A positive lower limit exists for n ≥ 6 n \ge 6 n ≥ 6 .)
Location ( X ˉ \bar{X} X ˉ ) Chart Control Limits
Control limits for process location use factor A 3 A_3 A 3 : U C L X ˉ = X ˉ ˉ + A 3 s ˉ UCL_{\bar{X}} = \bar{\bar{X}} + A_3 \bar{s} U C L X ˉ = X ˉ ˉ + A 3 s ˉ C L X ˉ = X ˉ ˉ CL_{\bar{X}} = \bar{\bar{X}} C L X ˉ = X ˉ ˉ L C L X ˉ = X ˉ ˉ − A 3 s ˉ LCL_{\bar{X}} = \bar{\bar{X}} - A_3 \bar{s} L C L X ˉ = X ˉ ˉ − A 3 s ˉ
- (Derivation: A 3 = 3 c 4 n A_3 = \frac{3}{c_4 \sqrt{n}} A 3 = c 4 n 3 )
- Estimating Population Standard Deviation ( σ ^ \hat{\sigma} σ ^ )
The sample standard deviation s s s is a slightly biased estimator of the true population parameter σ \sigma σ for small samples. The unbiasing constant c 4 c_4 c 4 is used to obtain the true within-subgroup standard deviation: σ ^ = s ˉ c 4 \hat{\sigma} = \frac{\bar{s}}{c_4} σ ^ = c 4 s ˉ
Standard Factor Table for X ˉ \bar{X} X ˉ and s s s Charts
- Subgroup Size ( n n n ) c 4 c_4 c 4 A 3 A_3 A 3 B 3 B_3 B 3 B 4 B_4 B 4
- 5 0.9400 1.427 0 2.089
- 6 0.9515 1.287 0.030 1.970
- 8 0.9650 1.099 0.185 1.815
- 10 0.9727 0.975 0.284 1.716
- 12 0.9776 0.886 0.354 1.646
- 15 0.9823 0.789 0.428 1.572
- 20 0.9869 0.680 0.510 1.490
- Handling Variable Subgroup Sizes
When sample sizes vary from subgroup to subgroup ( n i ≠ n n_i \ne n n i = n ):
Average Sample Size Method : If sample sizes vary by no more than ± 10 % \pm 10\% ± 10% to 15 % 15\% 15% (e.g., n n n varies between 9 and 11), technicians can calculate an average sample size n ˉ = ∑ n i / k \bar{n} = \sum n_i / k n ˉ = ∑ n i / k and use fixed limits based on n ˉ \bar{n} n ˉ .
Individual Control Limit Method (Stair-Step Limits) : If sample sizes vary widely (e.g., some subgroups have n = 5 n=5 n = 5 , others n = 15 n=15 n = 15 ), separate control limits must be computed for each individual subgroup using that subgroup's specific n i n_i n i and corresponding factors A 3 ( n i ) A_3(n_i) A 3 ( n i ) , B 3 ( n i ) B_3(n_i) B 3 ( n i ) , and B 4 ( n i ) B_4(n_i) B 4 ( n i ) . On the control chart, the control limits expand when n i n_i n i is small and contract when n i n_i n i is large, creating a characteristic 'stair-step' appearance.
3. Individual and Moving Range ( I − M R I-MR I − MR / X − M R X-MR X − MR ) Charts
In many production environments, collecting rational subgroups of n ≥ 2 n \ge 2 n ≥ 2 is physically impossible, economically unfeasible, or statistically meaningless. In these situations, the subgroup sample size is exactly one ( n = 1 n = 1 n = 1 ) , and the process must be monitored using an Individual and Moving Range ( I − M R I-MR I − MR ) chart (also known as an X − M R X-MR X − MR chart ). INDIVIDUALS (X) CHART
- UCL_X --------------------------------- X-bar + 2.660 * MR-bar
- * * *
- CL --*-------*-------*---*-------*-- X-bar
- * * *
- LCL_X --------------------------------- X-bar - 2.660 * MR-bar
- MOVING RANGE (MR) CHART
- UCL_MR --------------------------------- 3.267 * MR-bar
- * *
- CL --*-------*---*---*-------*------ MR-bar
- * * *
- LCL_MR --------------------------------- 0
- Industrial Applications Mandating n = 1 n = 1 n = 1
Quality technicians must deploy an I − M R I-MR I − MR chart under four primary conditions:
Destructive Testing : Measuring missile casing burst pressure, tensile fracture strength of aerospace fasteners, or impact resistance. Because each tested part is destroyed at high cost, pulling multiple pieces per subgroup is economically prohibitive.
Very Slow Production Rates : Machining massive turbine rotors, locomotive frames, or aerospace wing spars where only one part is produced every 8 to 24 hours. Subgrouping n = 5 n=5 n = 5 parts would span an entire week of production, violating rational subgrouping by mixing tool wear, ambient temperature swings, and multiple operator shifts into within-subgroup variation.
Homogeneous Fluids and Chemical Batches : In chemical vats, liquid pharmaceutical mixing tanks, molten alloy furnaces, or electroplating baths, the fluid is completely homogeneous. Taking five consecutive beakers from the same tank does not measure process variation—it only measures measurement error! Each individual batch represents n = 1 n=1 n = 1 .
Automated 100% Inspection : Inline laser gaging, optical inspection, or automated electronic testing measuring every consecutive part as it flows down a transfer line.
4. Mathematical Formulas and Construction for I − M R I-MR I − MR Charts
An I − M R I-MR I − MR chart consists of two paired charts:
The Individuals ( X X X ) Chart : Monitors process central tendency across single readings.
The Moving Range ( M R MR MR ) Chart : Monitors process dispersion by calculating the absolute difference between successive individual readings.
Step 1: Compute Moving Ranges
For a series of k k k individual observations ( X 1 , X 2 , … , X k X_1, X_2, \dots, X_k X 1 , X 2 , … , X k ), the moving range between consecutive observations using a standard span of w = 2 w = 2 w = 2 is: M R i = ∣ X i − X i − 1 ∣ for i = 2 , 3 , … , k MR_i = |X_i - X_{i-1}| \quad \text{for } i = 2, 3, \dots, k M R i = ∣ X i − X i − 1 ∣ for i = 2 , 3 , … , k
- (Note: For k k k individual observations, there are exactly k − 1 k - 1 k − 1 moving ranges .)
- Step 2: Compute Centerlines
Centerline for Individuals Chart ( X ˉ \bar{X} X ˉ ) : X ˉ = 1 k ∑ i = 1 k X i \bar{X} = \frac{1}{k} \sum_{i=1}^k X_i X ˉ = k 1 i = 1 ∑ k X i
Centerline for Moving Range Chart ( M R ˉ \bar{MR} MR ˉ ) : M R ˉ = 1 k − 1 ∑ i = 2 k M R i \bar{MR} = \frac{1}{k - 1} \sum_{i=2}^k MR_i MR ˉ = k − 1 1 i = 2 ∑ k M R i
Step 3: Compute Moving Range ( M R MR MR ) Control Limits
Because the moving range is calculated between successive pairs of parts, the effective sample size is n = 2 n = 2 n = 2 . Using standard Shewhart factors for n = 2 n = 2 n = 2 ( D 4 = 3.267 D_4 = 3.267 D 4 = 3.267 and D 3 = 0 D_3 = 0 D 3 = 0 ): U C L M R = D 4 M R ˉ = 3.267 M R ˉ UCL_{MR} = D_4 \bar{MR} = 3.267 \bar{MR} U C L MR = D 4 MR ˉ = 3.267 MR ˉ C L M R = M R ˉ CL_{MR} = \bar{MR} C L MR = MR ˉ L C L M R = D 3 M R ˉ = 0 LCL_{MR} = D_3 \bar{MR} = 0 L C L MR = D 3 MR ˉ = 0
Step 4: Compute Individuals ( X X X ) Control Limits
The population standard deviation is estimated from the average moving range using the n = 2 n=2 n = 2 factor d 2 = 1.128 d_2 = 1.128 d 2 = 1.128 : σ ^ = M R ˉ d 2 = M R ˉ 1.128 \hat{\sigma} = \frac{\bar{MR}}{d_2} = \frac{\bar{MR}}{1.128} σ ^ = d 2 MR ˉ = 1.128 MR ˉ
The 3 σ 3\sigma 3 σ control limits for individual observations are therefore: U C L X = X ˉ + 3 σ ^ = X ˉ + 3 ( M R ˉ 1.128 ) = X ˉ + ( 3 1.128 ) M R ˉ = X ˉ + 2.660 M R ˉ UCL_X = \bar{X} + 3\hat{\sigma} = \bar{X} + 3\left(\frac{\bar{MR}}{1.128}\right) = \bar{X} + \left(\frac{3}{1.128}\right)\bar{MR} = \bar{X} + 2.660 \bar{MR} U C L X = X ˉ + 3 σ ^ = X ˉ + 3 ( 1.128 MR ˉ ) = X ˉ + ( 1.128 3 ) MR ˉ = X ˉ + 2.660 MR ˉ L C L X = X ˉ − 3 σ ^ = X ˉ − 2.660 M R ˉ LCL_X = \bar{X} - 3\hat{\sigma} = \bar{X} - 2.660 \bar{MR} L C L X = X ˉ − 3 σ ^ = X ˉ − 2.660 MR ˉ U C L X = X ˉ + E 2 M R ˉ \mathbf{UCL_X = \bar{X} + E_2 \bar{MR}} UC L X = X ˉ + E 2 MR ˉ L C L X = X ˉ − E 2 M R ˉ \mathbf{LCL_X = \bar{X} - E_2 \bar{MR}} LC L X = X ˉ − E 2 MR ˉ
- (Where factor E 2 = 2.660 E_2 = 2.660 E 2 = 2.660 for a span of w = 2 w = 2 w = 2 .)
- 5. Critical Statistical Limitations of I − M R I-MR I − MR Charts
While extraordinarily versatile, I − M R I-MR I − MR charts possess three severe statistical vulnerabilities that quality technicians must understand:
A. Extreme Sensitivity to Non-Normality
On an X ˉ \bar{X} X ˉ chart, the Central Limit Theorem guarantees that subgroup averages are approximately normally distributed even if individual parts are skewed. The Central Limit Theorem does not apply to the Individuals chart. The X X X chart plots raw, un-averaged individual measurements.
If the underlying process distribution is skewed (e.g., flatness, roundness, surface roughness, hole true position, or chemical cycle times), plotting raw individual data against symmetric ± 3 σ \pm 3\sigma ± 3 σ limits will generate massive false alarm rates on the skewed tail and zero sensitivity on the short tail. Individual data must be tested for normality (e.g., via Anderson-Darling test or probability plots) before deploying an I − M R I-MR I − MR chart. If non-normal, data must undergo a Box-Cox transformation or be fitted to a Weibull/lognormal model.
B. Mathematically Induced Autocorrelation on the M R MR MR Chart
In standard rational subgrouping, each subgroup range is completely independent. On an I − M R I-MR I − MR chart, consecutive moving ranges are mathematically correlated because each individual observation X i X_i X i is used to calculate two successive moving ranges: M R i = ∣ X i − X i − 1 ∣ and M R i + 1 = ∣ X i + 1 − X i ∣ MR_i = |X_i - X_{i-1}| \quad \text{and} \quad MR_{i+1} = |X_{i+1} - X_i| M R i = ∣ X i − X i − 1 ∣ and M R i + 1 = ∣ X i + 1 − X i ∣
If observation X i X_i X i is an extreme outlier, it will cause two consecutive points on the M R MR MR chart to spike upwards ! Inexperienced technicians often misinterpret this paired spike as two independent out-of-control events. Technicians must recognize that a single bad part inevitably induces a paired alarm on the moving range chart.
C. Reduced Power to Detect Small Shifts
Because n = 1 n = 1 n = 1 , the standard error of the estimate is large ( σ / 1 = σ \sigma / \sqrt{1} = \sigma σ / 1 = σ ). An I − M R I-MR I − MR chart requires significantly more observations to detect a moderate process shift ( 1.0 σ 1.0\sigma 1.0 σ to 1.5 σ 1.5\sigma 1.5 σ ) than an X ˉ \bar{X} X ˉ chart of n = 5 n=5 n = 5 . When rapid detection of small shifts is essential, technicians should supplement the I − M R I-MR I − MR chart with a CUSUM (Cumulative Sum) or EWMA (Exponentially Weighted Moving Average) control chart.
- 6. Comprehensive Worked Numerical Examples
- Worked Example 1: X ˉ \bar{X} X ˉ and s s s Control Chart Calculations
Scenario : An automated CMM measures the bore diameter of 20 consecutive automotive engine blocks per shift. The quality technician establishes an X ˉ \bar{X} X ˉ and s s s chart with subgroup size n = 10 n = 10 n = 10 across k = 25 k = 25 k = 25 baseline subgroups .
- Grand Mean: X ˉ ˉ = 85.025 mm \bar{\bar{X}} = 85.025\text{ mm} X ˉ ˉ = 85.025 mm
- Average Sample Standard Deviation: s ˉ = 0.0120 mm \bar{s} = 0.0120\text{ mm} s ˉ = 0.0120 mm
Step 1: Retrieve factors for n = 10 n = 10 n = 10 From the factor table: c 4 = 0.9727 , A 3 = 0.975 , B 3 = 0.284 , B 4 = 1.716 c_4 = 0.9727, \quad A_3 = 0.975, \quad B_3 = 0.284, \quad B_4 = 1.716 c 4 = 0.9727 , A 3 = 0.975 , B 3 = 0.284 , B 4 = 1.716 .
Step 2: Calculate dispersion ( s s s ) chart limits U C L s = B 4 s ˉ = 1.716 × 0.0120 = 0.02059 ≈ 0.0206 mm UCL_s = B_4 \bar{s} = 1.716 \times 0.0120 = 0.02059 \approx 0.0206\text{ mm} U C L s = B 4 s ˉ = 1.716 × 0.0120 = 0.02059 ≈ 0.0206 mm C L s = s ˉ = 0.0120 mm CL_s = \bar{s} = 0.0120\text{ mm} C L s = s ˉ = 0.0120 mm L C L s = B 3 s ˉ = 0.284 × 0.0120 = 0.00341 ≈ 0.0034 mm LCL_s = B_3 \bar{s} = 0.284 \times 0.0120 = 0.00341 \approx 0.0034\text{ mm} L C L s = B 3 s ˉ = 0.284 × 0.0120 = 0.00341 ≈ 0.0034 mm
Step 3: Calculate location ( X ˉ \bar{X} X ˉ ) chart limits 3-Sigma Margin = A 3 s ˉ = 0.975 × 0.0120 = 0.0117 mm \text{3-Sigma Margin} = A_3 \bar{s} = 0.975 \times 0.0120 = 0.0117\text{ mm} 3-Sigma Margin = A 3 s ˉ = 0.975 × 0.0120 = 0.0117 mm U C L X ˉ = X ˉ ˉ + A 3 s ˉ = 85.025 + 0.0117 = 85.0367 mm UCL_{\bar{X}} = \bar{\bar{X}} + A_3 \bar{s} = 85.025 + 0.0117 = 85.0367\text{ mm} U C L X ˉ = X ˉ ˉ + A 3 s ˉ = 85.025 + 0.0117 = 85.0367 mm C L X ˉ = 85.0250 mm CL_{\bar{X}} = 85.0250\text{ mm} C L X ˉ = 85.0250 mm L C L X ˉ = X ˉ ˉ − A 3 s ˉ = 85.025 − 0.0117 = 85.0133 mm LCL_{\bar{X}} = \bar{\bar{X}} - A_3 \bar{s} = 85.025 - 0.0117 = 85.0133\text{ mm} L C L X ˉ = X ˉ ˉ − A 3 s ˉ = 85.025 − 0.0117 = 85.0133 mm
Step 4: Estimate true population standard deviation ( σ ^ \hat{\sigma} σ ^ ) σ ^ = s ˉ c 4 = 0.0120 0.9727 = 0.01234 mm \hat{\sigma} = \frac{\bar{s}}{c_4} = \frac{0.0120}{0.9727} = 0.01234\text{ mm} σ ^ = c 4 s ˉ = 0.9727 0.0120 = 0.01234 mm
Worked Example 2: Individual and Moving Range ( I − M R I-MR I − MR ) Chart Calculations
Scenario : A chemical processing facility manufactures specialty polymer resin in 2,000-pound batches. Because each batch is a homogeneous liquid, the technician tracks batch Melt Flow Index (MFI) using an I − M R I-MR I − MR chart ( n = 1 n = 1 n = 1 ). Baseline data from k = 15 k = 15 k = 15 consecutive batches yields:
Mean Melt Flow Index: X ˉ = 22.40 g/10 min \bar{X} = 22.40\text{ g/10 min} X ˉ = 22.40 g/10 min
Sum of 14 moving ranges: ∑ i = 2 15 M R i = 21.70 g/10 min \sum_{i=2}^{15} MR_i = 21.70\text{ g/10 min} ∑ i = 2 15 M R i = 21.70 g/10 min
Step 1: Calculate Average Moving Range ( M R ˉ \bar{MR} MR ˉ ) Remember: For 15 individual batches, there are 15 − 1 = 14 15 - 1 = 14 15 − 1 = 14 moving ranges! M R ˉ = ∑ M R i k − 1 = 21.70 14 = 1.550 g/10 min \bar{MR} = \frac{\sum MR_i}{k - 1} = \frac{21.70}{14} = 1.550\text{ g/10 min} MR ˉ = k − 1 ∑ M R i = 14 21.70 = 1.550 g/10 min
Step 2: Calculate Moving Range ( M R MR MR ) Chart Limits Using D 4 = 3.267 D_4 = 3.267 D 4 = 3.267 and D 3 = 0 D_3 = 0 D 3 = 0 : U C L M R = D 4 M R ˉ = 3.267 × 1.550 = 5.064 g/10 min UCL_{MR} = D_4 \bar{MR} = 3.267 \times 1.550 = 5.064\text{ g/10 min} U C L MR = D 4 MR ˉ = 3.267 × 1.550 = 5.064 g/10 min C L M R = M R ˉ = 1.550 g/10 min CL_{MR} = \bar{MR} = 1.550\text{ g/10 min} C L MR = MR ˉ = 1.550 g/10 min L C L M R = 0 LCL_{MR} = 0 L C L MR = 0
Step 3: Calculate Individuals ( X X X ) Chart Limits Using factor E 2 = 2.660 E_2 = 2.660 E 2 = 2.660 : 3-Sigma Margin = E 2 M R ˉ = 2.660 × 1.550 = 4.123 g/10 min \text{3-Sigma Margin} = E_2 \bar{MR} = 2.660 \times 1.550 = 4.123\text{ g/10 min} 3-Sigma Margin = E 2 MR ˉ = 2.660 × 1.550 = 4.123 g/10 min U C L X = X ˉ + E 2 M R ˉ = 22.40 + 4.123 = 26.523 g/10 min UCL_X = \bar{X} + E_2 \bar{MR} = 22.40 + 4.123 = 26.523\text{ g/10 min} U C L X = X ˉ + E 2 MR ˉ = 22.40 + 4.123 = 26.523 g/10 min C L X = X ˉ = 22.40 g/10 min CL_X = \bar{X} = 22.40\text{ g/10 min} C L X = X ˉ = 22.40 g/10 min L C L X = X ˉ − E 2 M R ˉ = 22.40 − 4.123 = 18.277 g/10 min LCL_X = \bar{X} - E_2 \bar{MR} = 22.40 - 4.123 = 18.277\text{ g/10 min} L C L X = X ˉ − E 2 MR ˉ = 22.40 − 4.123 = 18.277 g/10 min
Step 4: Estimate Process Standard Deviation ( σ ^ \hat{\sigma} σ ^ ) σ ^ = M R ˉ d 2 = 1.550 1.128 = 1.374 g/10 min \hat{\sigma} = \frac{\bar{MR}}{d_2} = \frac{1.550}{1.128} = 1.374\text{ g/10 min} σ ^ = d 2 MR ˉ = 1.128 1.550 = 1.374 g/10 min
7. Summary Comparison: Variables Control Chart Selection Guide
| Control Chart | Data Type | Subgroup Size ( n n n ) | Dispersion Measure | Factors Used | Primary Applications & Advantages |
|:---|:---|:---:|:---:|:---:|:---||
| X ˉ \bar{X} X ˉ and R R R | Continuous Variables | 2 ≤ n ≤ 9 2 \le n \le 9 2 ≤ n ≤ 9 (Typically 4–5) | Range ( R R R ) | A 2 , D 3 , D 4 , d 2 A_2, D_3, D_4, d_2 A 2 , D 3 , D 4 , d 2 | Standard shop-floor machining, stamping; computationally simple; high efficiency for small n n n . |
| X ˉ \bar{X} X ˉ and s s s | Continuous Variables | n ≥ 10 n \ge 10 n ≥ 10 or variable n n n | Sample Standard Deviation ( s s s ) | A 3 , B 3 , B 4 , c 4 A_3, B_3, B_4, c_4 A 3 , B 3 , B 4 , c 4 | High-speed CMM inspection, automated gages; statistically superior for large or varying subgroups. |
| I − M R I-MR I − MR ( X − M R X-MR X − MR ) | Continuous Variables | n = 1 n = 1 n = 1 | Moving Range ( M R MR MR ) of span 2 | E 2 = 2.660 E_2 = 2.660 E 2 = 2.660 , D 4 = 3.267 , d 2 = 1.128 D_4 = 3.267, d_2 = 1.128 D 4 = 3.267 , d 2 = 1.128 | Destructive testing, homogeneous chemical vats, slow cycle times, automated 100% sorting lines. |