8.2 RP Pass/Fail Criteria and Troubleshooting
ASSE 5110 Backflow Prevention Assembly Tester Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About ASSE 5110 and the Series 5000 Program 1.2 Eligibility, 40-Hour Course, Written & Practical Format 1.3 Validity, Recertification, and Retake Rules
2 Hydraulics Fundamentals
2.1 Pressure, Head, and Atmospheric Reference 2.2 Static vs Flowing Conditions for Testers 2.3 PSID and How Differentials Are Measured
3 Backpressure, Backsiphonage & Differentials
3.1 Backpressure: Causes and Field Examples 3.2 Backsiphonage: Causes and Field Examples 3.3 How Differentials Drive Relief and Air-Inlet Action 3.4 When and Why Backflow Occurs in Distribution Systems
4 Cross-Connection Recognition
4.1 Health Hazard vs Non-Health Hazard Classification 4.2 Common Cross-Connections and Correct Protection 4.3 Containment vs Isolation Strategies
5 RP and DC Assemblies
5.1 RP (ASSE 1013) Components and Operation 5.2 RP Relief Valve Theory and Zone Protection 5.3 DC (ASSE 1015) Components and Operation 5.4 When to Use RP vs DC
6 PVB, SVB & Detector Assemblies
6.1 PVB (ASSE 1020) Components and Operation 6.2 SVB (ASSE 1056) Components and Operation 6.3 RPDA and DCDA Detector Assemblies (1047/1048) 6.4 Non-Testable Devices Testers Must Recognize
7 Test Equipment & Calibration
7.1 Three-Valve Differential Pressure Gauges 7.2 Five-Valve Gauges and Hose Discipline 7.3 Bleeding, Hookup Sequence, and Air Elimination 7.4 Calibration, Accuracy, and Field Verification
8 RP & DC Field Test Procedures
8.1 RP Field Test Procedure (USC 10th Edition) 8.2 RP Pass/Fail Criteria and Troubleshooting 8.3 DC Field Test Procedure 8.4 DC Failures and Common Causes
9 PVB/SVB Tests & Practical Sequence
9.1 PVB Field Test Procedure 9.2 SVB Field Test Procedure 9.3 Comparing the Four Practical-Exam Assemblies 9.4 Hands-On Sequence Under Practical Exam Pressure
10 Installation Requirements & Inspection
10.1 Orientation, Clearance, and Elevation Rules 10.2 RP Drainage, Air Gap, and Flood Protection 10.3 Freeze Protection and Thermal Expansion 10.4 Pre-Test Visual Inspection
11 Codes, Standards & Manuals
11.1 ASSE Series 5000 and 5110 Professional Qualifications 11.2 Device Standards 1013, 1015, 1020, 1056 11.3 USC Manual of Cross-Connection Control 10th Edition 11.4 AWWA M14, EPA 816-R-03-002, and SDWA Framework
12 Reporting, Boundaries & Exam Prep
12.1 Field Test Reports and Pass/Fail Language 12.2 Purveyor Notification and Record Retention 12.3 Tester vs Repairer vs Surveyor Boundaries 12.4 Written Exam Strategy, Study Plan, and Next Credentials
8.2 RP Pass/Fail Criteria and Troubleshooting
Key Takeaways Explain This Topic AI
RP pass requires relief ≥ 2.0 psid opening, check #2 tight against backpressure (no psid recorded), and check #1 ≥ 5.0 psid and above relief
Continuous relief drip often points to a fouled or leaking check #1 allowing zone pressure to rise toward supply
Relief opening below 2.0 psid fails the relief; check #1 below 5.0 or not above relief fails check #1; #2 that will not hold fails check #2
Zone pressure essentially equal to supply under static conditions, or drip only at static/no demand, often indicates a leaking check #1
Testers report fail and recommend repair by a qualified repairer (e.g., ASSE 5130 path)—they do not perform unauthorized repair diagnostics beyond tester scope
Last updated: August 2026
8.2 RP Pass/Fail Criteria and Troubleshooting
Quick Answer: An RP passes when relief opens at ≥ 2.0 psid , check #2 holds tight against backpressure (reported tight or leaked, no psid), and check #1 is ≥ 5.0 psid and above the relief opening point. Common fails: continuous drip (often fouled check #1 ), relief < 2.0 , check #1 weak or not above relief, check #2 not tight, zone ≈ supply (#1 leaking), or drip only at static (slow #1 leak). Report the fail; recommend repair by a qualified repairer (ASSE 5130 pathway)—do not exceed tester scope.
Pass criteria table (USC 10th Edition field criteria)
Use this table until it is automatic. Every line is independently gradable on worksheets and written items.
Component What you measure Pass criterion Fail if…
Relief valve Opening point (inlet-to-zone psid at open) Opens at ≥ 2.0 psid Opens < 2.0 psid , stuck open, or fails to open when procedure requires
Check #2 Tightness against backpressure (no psid recorded) Relief stays closed and gauge stabilizes → tight Differential collapses to the relief opening and the relief discharges → leaked
Check #1 Static differential (inlet vs zone) ≥ 5.0 psid and > relief opening < 5.0 psid , or ≤ relief opening , or both
Composite assembly pass: all required components pass on a valid procedure. One failed component → assembly fails for compliance purposes even if the other numbers look excellent.
Numeric examples:
- Relief open Check #2 Check #1 Result
- 2.4 psid Tight 6.2 psid Pass (6.2 > 2.4 and ≥ 5.0)
- 1.7 psid Tight 7.0 psid Fail relief
- 2.5 psid Leaked 6.0 psid Fail check #2
- 2.2 psid Tight 4.9 psid Fail check #1 (< 5.0)
- 2.9 psid Tight 5.5 psid Pass (5.5 ≥ 5.0 and 5.5 > 2.9)
- 3.1 psid Tight 5.0 psid Fail check #1 (5.0 is not above 3.1)
Train the last row carefully: ≥ 5.0 is necessary but not sufficient when relief opens high. “Above relief opening point” is a second gate.
- Failure patterns you must recognize
- Continuous relief drip
Observation: Relief weeps or drips steadily under normal supply with little or no downstream demand.
Common tester-level association: Fouled or leaking check #1 allowing zone pressure to climb toward inlet pressure, collapsing inlet-to-zone differential until the relief cracks open. Debris on the first check seat, damaged disc, or worn elastomer are typical mechanical stories—but as a tester you report continuous discharge and the failed differential/opening data , not a certified internal autopsy.
Other contributors exist (thermal expansion, series RP interaction, elevated downstream pressure events), yet the exam-favorite first association for ongoing drip with soft check #1 numbers is check #1 problem feeding the zone.
Relief opens below 2.0 psid
Observation: Procedure shows opening at 1.0–1.9 psid (or lower).
Call: Fail relief. The designed buffer is gone. Do not “average” with a strong check #1 to invent a pass. A strong check #1 does not legalize a weak relief set.
Check #1 below 5.0 psid or not above relief
Observation: Static differential 3.5 psid; or 5.2 psid with relief opening at 5.4 psid.
Call: Fail check #1. Write both numbers on the report so the repairer sees whether the problem was absolute margin, buffer above relief, or both.
Check #2 fails tightness against backpressure
Observation: With backpressure applied, the differential collapses to the relief opening point and the relief discharges; pressure equalizes across #2 in reverse.
Call: Fail check #2. Downstream pollution or elevated customer pressure can more readily load the zone if #2 will not seat reverse—exactly why this test exists.
Zone essentially equals supply
Observation: Under static conditions, zone pressure tracks inlet pressure; differential near zero; relief may be wide open or dumping hard.
Tester-level reading: Check #1 leaking (or not seating). The reduced-pressure zone has collapsed. This is an urgent compliance fail, not a paperwork quibble.
Drip only at static / no demand
Observation: During flow, relief is quiet; when the system goes static, a slow drip appears.
Pattern: Often a slow check #1 leak . Flowing conditions can hold a temporary differential that masks a marginal seat; when velocity stops, leak-down raises zone pressure until the relief cracks. Capture static data—do not certify pass based only on a flowing glance at a quiet relief.
Troubleshooting vs tester role
- Allowed (tester) Out of scope without repair credential / authorization
- Valid field test procedure and recorded psid values Disassembling checks/relief to “confirm” parts
Pass/fail per component on the report form Replacing discs, springs, seats as a tester-only visit when local rules require a repairer
Noting continuous drip, debris visible at strainers if accessible without unauthorized disassembly Adjusting relief springs to “make 2.0” without proper repair practice
Recommending repair by a qualified repairer (e.g., ASSE 5130 repairer pathway where that model applies) Signing off a failed assembly as “OK until next year”
Retest after qualified repair when hired to retest Falsifying numbers to clear a site
Ethical line: Diagnose at the level of which test failed and what the symptoms were . Do not over-claim internal failure modes you did not open. Do not perform repairs you are not authorized to perform. The written exam rewards knowing that 5110 is tester qualification; repair is a separate competency (often associated with 5130 in the Series 5000 family).
Report language that survives audit
Good report fragments:
- “Relief opening point 1.6 psid — fail (≥ 2.0 required).”
- “Check #1 static 4.7 psid — fail (≥ 5.0 and above relief required).”
- “Check #2 would not hold tight against backpressure — leaked / fail .”
“Continuous relief discharge observed at static; check #1 differential insufficient — assembly fails ; recommend repair by qualified repairer and retest.”
Avoid:
- “Probably fine; drip is normal.” (Continuous drip is not “normal protection working.”)
- “Opened relief spring ½ turn; now passes.” (Unauthorized adjustment narrative.)
“All checks OK” when one line failed.
Connecting symptoms to next actions
Complete the valid test (or stop safely if the assembly is flooding the room—isolate per site rules and document).
Mark fail on each failed component.
Notify per purveyor/AHJ rules (failed assemblies often cannot remain in unlimited service without a plan).
Recommend qualified repair—not DIY spring tweaks by untrained staff.
Retest after repair before calling the assembly compliant.
Exam traps
Treating 2.0 as a check #1 number or 5.0 as a relief number.
Passing check #1 on ≥ 5.0 alone while ignoring above relief .
Calling continuous drip “thermal expansion” every time without recording differentials.
Confusing tester observation with repair authorization .
Forgetting check #2 is about backpressure tightness (tight/leaked, no psid), not a forward flow boast.
When criteria and patterns are solid, Chapter 8.1’s procedure produces numbers you can defend—and 8.2 turns those numbers into clean pass/fail decisions.