Study guide
3.4 Brazing Procedure & Brazer Qualification, Records and Continuity
ASSE 6010 Medical Gas Systems Installer Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Credential, Codes & Medical Gas Fundamentals
1.1 The ASSE 6010 Credential: Eligibility, Exam Format & Recertification 1.2 Codes, Referenced Standards & the Medical Gas Team 1.3 Medical Gases, Hazards & Permitted Uses 1.4 Risk Categories & Category 1, 2, and 3 Piped Systems 1.5 Key NFPA 99 Definitions & Terminology
2 Chapter 2: Piping Materials, Oxygen Cleanliness & Joining Methods
2.1 Tube Specifications for Medical Gas and Vacuum Piping 2.2 Oxygen-Clean Materials: Delivery, Handling & Recleaning 2.3 Joining Methods: Permitted and Prohibited Joints
3 Chapter 3: Brazing Medical Gas Piping
3.1 Joint Preparation, Fittings, Filler Metals & Flux 3.2 Nitrogen Purge: Setup, Control & Final Tie-In Exception 3.3 Heating, Filling & Inspecting Brazed Joints 3.4 Brazing Procedure & Brazer Qualification, Records and Continuity
4 Chapter 4: Installing the Distribution Piping
4.1 Pipe Sizing, Protection & Permitted Locations 4.2 Supports, Buried Piping, Flexible Connectors & System Interconnections
5 Chapter 5: Valves, Station Outlets, Alarms & Labeling
5.1 Valve Requirements: Source, Main Line, Riser, Service & In-Line Valves 5.2 Zone Valves & Zone Valve Box Assemblies 5.3 Station Outlets & Inlets, Manufactured Assemblies & Pressure Indicators 5.4 Warning Systems: Master, Area & Local Alarms 5.5 Labeling, Identification & Color Codes
6 Chapter 6: Central Supply Systems & Source Equipment
6.1 Central Supply Locations, Cylinder Manifolds, Line Controls & Relief Valves 6.2 Cryogenic Supplies, Reserves, EOSC, IBER & Oxygen Concentrators 6.3 Medical Air Compressor Systems 6.4 Medical-Surgical Vacuum, WAGD & Medical Support Gas Sources
7 Chapter 7: Testing, Verification & Documentation
7.1 Installer Tests I: Blowdown, Initial Pressure, Cross-Connection & Piping Purge 7.2 Installer Tests II: 24-Hour Standing Pressure & Vacuum Tests, Inspection & Witnessing 7.3 System Verification: The Verifier's Test Sequence 7.4 Tie-Ins, Breached Systems, Operational Flow & Gas Concentration Tests 7.5 Documentation, Records & System Turnover
3.4 Brazing Procedure & Brazer Qualification, Records and Continuity
Key Takeaways Explain This Topic AI
Brazing procedures and brazer performance are qualified to ASME BPVC Section IX or AWS B2.2, as modified by NFPA 99.
Brazers are qualified by visual examination of the test coupon followed by sectioning.
The BPS must address cleaning, joint clearance, overlap, internal purge gas, purge gas flow rate, and filler metal.
A brazer's qualification stays in effect indefinitely unless the brazer goes more than six months without brazing on the qualified procedure, or there is a specific reason to question their ability.
The installer must have brazing procedure and brazer qualification documentation on the job site before any installation work starts.
Last updated: October 2026
Two Things Get Qualified: the Procedure and the Person
NFPA 99 requires brazing procedures and brazer performance for medical gas and vacuum piping to be qualified to either:
- Section IX, Welding, Brazing, and Fusing Qualifications, of the ASME Boiler and Pressure Vessel Code , or
- AWS B2.2, Specification for Brazing Procedure and Performance Qualification ,
with both as modified by NFPA 99 . The NFPA 99 modifications are what the exam tests.
- Document What it is
- BPS (brazing procedure specification) The written recipe the brazer follows
- PQR (procedure qualification record) Proof that the BPS, when followed, produces a sound joint
BPQ (brazer performance qualification record) Proof that a specific brazer can make sound joints following the BPS
NFPA 99's Modifications
Examination method: brazers are qualified by visual examination of the test coupon followed by sectioning . Sectioning cuts the joint open to show filler penetration, voids, and whether the inside surface stayed free of oxidation.
BPS content: the procedure must address cleaning, joint clearance, overlap, internal purge gas, purge gas flow rate, and filler metal .
Record content: the PQR and the BPQ record must document the filler metal used, base metals, cleaning, joint clearance, overlap, internal purge gas and flow rate during brazing of the coupon, and absence of internal oxidation in the completed coupon .
The record requirement explains why the purge gas and flow rate matter so much. A brazer who qualified with a nitrogen purge at a recorded flow is not qualified to braze without a purge, or with a different purge practice.
Procedures Qualified by Others
A contractor does not have to develop every BPS from scratch. NFPA 99 allows brazing procedures qualified by a technically competent group or agency , under three conditions:
The BPS and PQR meet the code's requirements .
The employer obtains copies of both from the group or agency and signs and dates them , accepting responsibility for the qualifications that group or agency performed.
The employer qualifies at least one brazer following each BPS it uses.
Carrying Qualifications Between Employers
An employer may accept a brazer's qualification records from a previous employer if:
the brazer qualified using the same or an equivalent procedure that the new employer uses, and
the new employer obtains a copy of the brazer's performance qualification records from the previous employer and signs and dates them , accepting responsibility.
How Long a Qualification Lasts
NFPA 99 states that brazer performance qualifications remain in effect indefinitely unless either:
the brazer does not braze with the qualified procedure for more than 6 months , or
there is a specific reason to question the brazer's ability .
That is the source of the six-month continuity rule. Certification bodies build their programs around it. At NITC, an authorized employer or contractor representative documents continuity every six months , and the brazer cannot submit it personally. The employer keeps the Record of Brazer Qualification . A lapsed qualification is restored by brazing one vertical up-flow joint under the BTS15 package, which extends the qualification another six months.
NITC Braze Tests and Their Size Ranges
NITC braze test Coupon size Qualifies Type L and K, nominal
BTS34 3/4 in. 1/4 in. to 1 in.
BTS15 (mandatory for ASSE 6010) 1-1/2 in. 5/8 in. to 2 in.
BTS2 2 in. 1 in. to 3 in.
BTS4 4 in. 2 in. to 5 in.
BTS6 6 in. 2-1/2 in. to 6 in.
BTS8 8 in. 2-1/2 in. to 8 in.
A brazer who holds only BTS15 is qualified for nominal sizes from 5/8 in. through 2 in. Brazing a 4 in. main requires an additional qualification that covers that size, such as BTS4. Ranges are expressed in nominal sizes; for example, 5/8 in. nominal tube has a 3/4 in. OD.
Documentation Before the First Joint
NFPA 99 states that before any installation work , the installer of medical gas and vacuum piping must provide and maintain on the job site documentation for the qualification of brazing procedures and individual brazers . A typical job-site binder holds:
Every BPS in use, with its supporting PQR, signed and dated by the employer when it came from a technically competent group or agency
- Each brazer's BPQ record, plus signed acceptance of records carried over from a previous employer
- Current continuity documentation showing no brazer has gone more than six months without using the procedure
Each installer's ASSE 6010 card. NFPA 99 requires every installer to hold the qualification, and a certified installer may not oversee noncertified installers.
Important
ASSE 6010 certification and brazer qualification are related but separate. The certificate shows that the person passed the written exam and practical. The brazer qualification records show that the person may braze on this employer's qualified procedure right now. An inspector can stop work if either is missing.