5.1 Valve Requirements: Source, Main Line, Riser, Service & In-Line Valves
ASSE 6010 Medical Gas Systems Installer Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Credential, Codes & Medical Gas Fundamentals
1.1 The ASSE 6010 Credential: Eligibility, Exam Format & Recertification 1.2 Codes, Referenced Standards & the Medical Gas Team 1.3 Medical Gases, Hazards & Permitted Uses 1.4 Risk Categories & Category 1, 2, and 3 Piped Systems 1.5 Key NFPA 99 Definitions & Terminology
2 Chapter 2: Piping Materials, Oxygen Cleanliness & Joining Methods
2.1 Tube Specifications for Medical Gas and Vacuum Piping 2.2 Oxygen-Clean Materials: Delivery, Handling & Recleaning 2.3 Joining Methods: Permitted and Prohibited Joints
3 Chapter 3: Brazing Medical Gas Piping
3.1 Joint Preparation, Fittings, Filler Metals & Flux 3.2 Nitrogen Purge: Setup, Control & Final Tie-In Exception 3.3 Heating, Filling & Inspecting Brazed Joints 3.4 Brazing Procedure & Brazer Qualification, Records and Continuity
4 Chapter 4: Installing the Distribution Piping
4.1 Pipe Sizing, Protection & Permitted Locations 4.2 Supports, Buried Piping, Flexible Connectors & System Interconnections
5 Chapter 5: Valves, Station Outlets, Alarms & Labeling
5.1 Valve Requirements: Source, Main Line, Riser, Service & In-Line Valves 5.2 Zone Valves & Zone Valve Box Assemblies 5.3 Station Outlets & Inlets, Manufactured Assemblies & Pressure Indicators 5.4 Warning Systems: Master, Area & Local Alarms 5.5 Labeling, Identification & Color Codes
6 Chapter 6: Central Supply Systems & Source Equipment
6.1 Central Supply Locations, Cylinder Manifolds, Line Controls & Relief Valves 6.2 Cryogenic Supplies, Reserves, EOSC, IBER & Oxygen Concentrators 6.3 Medical Air Compressor Systems 6.4 Medical-Surgical Vacuum, WAGD & Medical Support Gas Sources
7 Chapter 7: Testing, Verification & Documentation
7.1 Installer Tests I: Blowdown, Initial Pressure, Cross-Connection & Piping Purge 7.2 Installer Tests II: 24-Hour Standing Pressure & Vacuum Tests, Inspection & Witnessing 7.3 System Verification: The Verifier's Test Sequence 7.4 Tie-Ins, Breached Systems, Operational Flow & Gas Concentration Tests 7.5 Documentation, Records & System Turnover
5.1 Valve Requirements: Source, Main Line, Riser, Service & In-Line Valves
Key Takeaways Explain This Topic AI
New or replacement shutoff valves must be quarter-turn to off, meet minimum Cv values, show whether they are open or closed, be serviceable in line, be cleaned for oxygen if used for pressure gases, and have threaded purge ports on both sides.
Every valve except those in zone valve box assemblies must be secured: in a secured area, locked or latched in its operating position, or above a ceiling where it stays accessible and unobstructed.
A source valve sits at the immediate connection of each central supply system so the entire source, including dryers and final line regulators, can be isolated.
A main line valve is required inside the building unless the source and its source valve are inside, or the source is mounted on the building wall with the pipeline entering right beside the source valve.
Each riser needs a riser valve next to the main; each branch off a riser needs one service valve ahead of all zone valve boxes on that branch.
Last updated: October 2026
Why Shutoff Valves Exist
NFPA 99 requires shutoff valves to isolate sections of the distribution system for maintenance, repair, and planned future expansion, and to make periodic testing possible. Because a closed valve can stop oxygen to an ICU, valve selection, location, security, and labeling are all regulated.
Requirements for Any New or Replacement Valve
A valve may be of any design as long as it meets every condition below:
- Has at least the minimum Cv in NFPA 99's tables
- Turns a quarter turn to off
- Is made of materials suitable for the service
- Comes with copper tube extensions from the manufacturer for brazing, or with CMT fittings
- Shows the operator whether it is open or closed
- Permits in-line serviceability
- Is cleaned for oxygen service by the manufacturer if used for any positive-pressure service
- Has threaded purge ports on both the patient side and the source side
Has a minimum working pressure at least equal to the setting of the relief valve protecting that piping, for positive-pressure service
- Has replaceable seals that meet the central supply materials rules (NFPA 99-2024)
- Minimum Cv (full open)
- Valve size Positive-pressure gases Vacuum and WAGD
- 1/2 in. 17 17
- 3/4 in. 31 31
- 1 in. 60 60
- 1-1/4 in. 110 110
- 1-1/2 in. 169 169
- 2 in. 357 357
- 2-1/2 in. 390 196
- 3 in. 912 302
- 4 in. 1837 600
The vacuum table continues to 5 in. (1022), 6 in. (1579), and 8 in. (3136).
Security and Labeling
Every valve except those in zone valve box assemblies must be secured in one of three ways:
- Located in a secured area
- Locked or latched in its operating position
- Located above a ceiling , as long as it stays accessible and unobstructed
Every valve must be labeled with the gas it supplies and the area or areas it controls . Section 5.5 gives the required wording.
The Valve Hierarchy
Valve Where it goes What it does
Source valve At the immediate connection of each central supply system to the distribution piping, in the immediate vicinity of the source Isolates the entire central supply system , including accessories such as air dryers and final line regulators
Main line valve In the main supply line inside the building , on the facility side of the source valve and outside the source room or enclosure , or where the main first enters the building Shuts off the whole building's supply from inside the building
Riser valve In each riser , next to the main line Isolates one riser
Service valve In the branch (lateral) off a riser, ahead of any zone valve box on that branch Lets a branch be serviced or modified without shutting down the main, the riser, or the facility
- Zone valve Outside the area it controls (Section 5.2) Controls the gas to one zone
- In-line valve Optional Isolates piping to individual rooms or areas for service
- When a main line valve is not required
A main line valve is not required where either of these applies:
The source and its source valve are inside the building served.
The source system is physically mounted to the wall of the building served, and the pipeline enters the building right next to the source valve .
Service valves: one per branch
Only one service valve is required for each branch off a riser, regardless of how many zone valve boxes are on that lateral. It must be placed in the branch before any zone valve box on that branch.
Other Valves and Connections
Valves for future connections must be labeled as to gas content . The downstream piping is closed with a brazed cap , leaving enough tube to cut off the cap and braze again later.
In-line check valves , new or replacement, must be brass or bronze with brazed extensions. They must be serviceable in line, have no threaded connections , and have 1/8 in. NPT purge points . They must be sized so flow velocity stays within the manufacturer's recommendation.
Relief valves: plumbing codes that extract NFPA 99, such as the Uniform Plumbing Code's health care chapter, state that a pressure relief valve may not be isolated from its intended use by a valve.
Auxiliary source connection (cryogenic systems): every cryogenic fluid central supply system must have an auxiliary source connection. It is the same size as the main line , located immediately on the patient side of the source valve , and consists of a tee, a valve, and a removable plug or cap . The valve is normally closed and secured . NFPA 99-2024 also requires an access point for a temporary or supplemental supply on other systems, located in the main line on the patient side of the source valve.
Walking the Hierarchy in an Emergency
Suppose a leak develops in a ceiling above a 4th-floor patient corridor. Staff close the zone valve for the affected rooms first, which stops gas to the fewest patients. If the leak is upstream of the zone valve, in the branch, the service valve for that lateral isolates it without touching other branches. A leak in the riser needs the riser valve . Only a main or source problem calls for the main line valve or source valve . That would cut supply to the whole building, so emergency plans arrange portable supplies first. This is why NFPA 99 wants every level of valve present, accessible to the right people, and secured against everyone else.
The diagram after this text shows the hierarchy.