6.1 Central Supply Locations, Cylinder Manifolds, Line Controls & Relief Valves

ASSE 6010 Medical Gas Systems Installer Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The Credential, Codes & Medical Gas Fundamentals

1.1 The ASSE 6010 Credential: Eligibility, Exam Format & Recertification 1.2 Codes, Referenced Standards & the Medical Gas Team 1.3 Medical Gases, Hazards & Permitted Uses 1.4 Risk Categories & Category 1, 2, and 3 Piped Systems 1.5 Key NFPA 99 Definitions & Terminology

2 Chapter 2: Piping Materials, Oxygen Cleanliness & Joining Methods

2.1 Tube Specifications for Medical Gas and Vacuum Piping 2.2 Oxygen-Clean Materials: Delivery, Handling & Recleaning 2.3 Joining Methods: Permitted and Prohibited Joints

3 Chapter 3: Brazing Medical Gas Piping

3.1 Joint Preparation, Fittings, Filler Metals & Flux 3.2 Nitrogen Purge: Setup, Control & Final Tie-In Exception 3.3 Heating, Filling & Inspecting Brazed Joints 3.4 Brazing Procedure & Brazer Qualification, Records and Continuity

4 Chapter 4: Installing the Distribution Piping

4.1 Pipe Sizing, Protection & Permitted Locations 4.2 Supports, Buried Piping, Flexible Connectors & System Interconnections

5 Chapter 5: Valves, Station Outlets, Alarms & Labeling

5.1 Valve Requirements: Source, Main Line, Riser, Service & In-Line Valves 5.2 Zone Valves & Zone Valve Box Assemblies 5.3 Station Outlets & Inlets, Manufactured Assemblies & Pressure Indicators 5.4 Warning Systems: Master, Area & Local Alarms 5.5 Labeling, Identification & Color Codes

6 Chapter 6: Central Supply Systems & Source Equipment

6.1 Central Supply Locations, Cylinder Manifolds, Line Controls & Relief Valves 6.2 Cryogenic Supplies, Reserves, EOSC, IBER & Oxygen Concentrators 6.3 Medical Air Compressor Systems 6.4 Medical-Surgical Vacuum, WAGD & Medical Support Gas Sources

7 Chapter 7: Testing, Verification & Documentation

7.1 Installer Tests I: Blowdown, Initial Pressure, Cross-Connection & Piping Purge 7.2 Installer Tests II: 24-Hour Standing Pressure & Vacuum Tests, Inspection & Witnessing 7.3 System Verification: The Verifier's Test Sequence 7.4 Tie-Ins, Breached Systems, Operational Flow & Gas Concentration Tests 7.5 Documentation, Records & System Turnover

6.1 Central Supply Locations, Cylinder Manifolds, Line Controls & Relief Valves

Key Takeaways Explain This Topic AI

Indoor rooms for oxygen, nitrous oxide, or other oxidizers must be separated from the rest of the building by 1-hour fire-rated walls and floors, with 3/4-hour rated doors.

Supply locations must be lockable, have no fuel-fired equipment, use heating elements no hotter than 266°F (130°C), and secure every cylinder, full or empty, against falling.

Final line pressure controls must keep pressure within Table 5.1.11, each flow 100% of peak demand, and be redundant so any component can be serviced without interrupting supply.

Central supply relief valves sit between each final line regulator and the source valve, are set 50% above normal operating pressure, and are vented outdoors except for small compressed air systems.

A gas cylinder manifold has two equal headers, each holding one average day's supply but never fewer than two cylinder connections, with automatic changeover that signals the master alarms.

Last updated: October 2026

Types of Central Supply Systems

NFPA 99 permits central supply systems to consist of:

  • Cylinder manifolds for gas cylinders
  • Manifolds for cryogenic liquid containers
  • Cryogenic fluid central supply systems (bulk)
  • Medical air compressor systems
  • Medical-surgical vacuum producers
  • WAGD producers
  • Instrument air compressor systems
  • Proportioning systems for medical air USP
  • Oxygen central supply systems using concentrators

Central supply systems must come from a supplier or manufacturer familiar with their construction and use, and must be installed per the manufacturer's instructions . Installers of medical gas piping that supports pump, compressor, and source gas manifold systems must be ASSE 6010 certified. Permanently installed bulk source systems are excluded from that requirement.

Locations for Cylinders and Gas Manifolds

Locations for central supply systems (other than cryogenic fluid systems and motor-driven equipment), and locations where positive-pressure gases are stored, must:

  • Requirement Detail
  • Access Allow cylinders and equipment to be moved in and out on hand trucks
  • Security Have lockable doors or gates , or otherwise be securable

Outdoors Be well drained, with a noncombustible enclosure such as a wall or fence; keep cylinders off prolonged contact with soil

Indoor finishes Use noncombustible or limited-combustible interior finishes

Oxidizer rooms Separate rooms with oxygen, nitrous oxide, or other oxidizers from the building with 1-hour fire-rated walls and floors and 3/4-hour rated doors and other opening protectives

Electrical Meet NFPA 70 for ordinary locations; protect electrical devices from damage; supply power from the essential electrical system

  • Fuel-fired equipment None in the room
  • Heat Where heat is needed, in-room heating elements may reach at most 266°F (130°C)
  • Cylinder restraint Racks, chains, or other fastenings for all cylinders, connected or not, full or empty
  • Shelving Racks, shelves, and supports of noncombustible or limited-combustible materials
  • Delivery Allow access by delivery vehicles and for cylinder management

Ventilation: indoor central supply locations, medical gas storage rooms, and transfilling rooms are ventilated per NFPA 99's HVAC chapter. Rooms with motor-driven sources (medical air, vacuum, WAGD, instrument air) must be ventilated to prevent heat buildup . Outdoor enclosures with solid walls need protected ventilation openings at the base of each wall. Indoor supply systems must vent all relief valves outdoors as described below.

Storage quantity limits per room or enclosure

Gas Outdoor enclosure Indoor, nonsprinklered Indoor, sprinklered

Oxygen and nitrous oxide (sum of all oxidizing gases in the room) No limit 10,000 ft3 (283 m3) 20,000 ft3 (566 m3)

Carbon dioxide, helium, medical air, nitrogen No limit Per Table 5.1.3.3.2.5 Per Table 5.1.3.3.2.5

These limits may be exceeded only where an approved risk assessment by the governing body documents it.

Storage rule: cylinders, full or empty, may not be stored in enclosures that contain motor-driven machinery. The one exception is cylinders for an instrument air reserve header , which may share a room with the instrument air compressor when it is the only machinery there. Locations for motor-driven central supply systems must be lockable, meet NFPA 70, stay within the manufacturer's temperature limits, and run on essential electrical power.

Final Line Pressure Controls

Every positive-pressure supply system must control final line pressure at the source with equipment that:

  • Keeps pressure within the limits of Table 5.1.11
  • Can flow 100% of the peak calculated demand through each control mechanism
  • Is redundant , so each component can be isolated for service while normal operation continues
  • Is protected against overpressure
  • Is built from materials the manufacturer deems suitable

For cryogenic fluid central supply systems, these line pressure regulators must be of a balanced design . Where one gas is piped at two pressures, each pressure needs its own pressure-regulating equipment, relief valve, and source shutoff valve.

Relief Valves

All pressure relief valves must:

Be brass, bronze, or stainless steel , designed for the specific gas

Be set no higher than the maximum allowable working pressure of the weakest component in the portion of the system they protect

Vent outside the building . Relief valves on compressed air systems holding less than 3000 ft3 at STP may diffuse locally by means that do not restrict flow.

Have a vent discharge line no smaller than the relief valve outlet or NPS 3/4 , whichever is larger. Where several relief valves share a vent, its cross-sectional area must be at least the combined area of all of them.

Discharge where escaping gas will not hit people, equipment, or structures or enter enclosed spaces, and have the vent end turned down and screened

Be designed to ASME B31.3

Plumbing codes that extract NFPA 99, such as the Uniform Plumbing Code's health care chapter, add that a relief valve may not be isolated from its intended use by a valve.

Central supply systems for positive-pressure gases must have one or more relief valves between each final line regulator and the source valve , set 50% above the normal system operating pressure .

Headers

Each header in a system using cylinders or containers includes:

  • Cylinder or container connection points
  • A connection lead for each point, with end fittings per CGA V-1
  • A filter to keep debris out of the manifold controls
  • A header shutoff valve
  • A pressure indicator for header contents
  • A check valve that prevents backflow into the header and allows the header to be serviced

For gas cylinders: a check valve at each cylinder lead connection, and a pressure regulator that reduces cylinder pressure to an intermediate pressure

  • For cryogenic liquid containers: a pressure relief valve
  • Any header vent valves piped outdoors
  • Manifolds for Gas Cylinders

Location: outdoors in an enclosure used only for that purpose (sited per the separation table), or indoors in a room used only for such manifolds. The room or enclosure must be built to the location rules above.

The primary and secondary headers are in the same enclosure .

Two equal headers , each with enough cylinder connections for one average day's supply but not fewer than two connections , connected so either header can supply the system

Intermediate relief valve(s) , piped outdoors, protecting the piping between the header regulator and the line regulators

Automatic alternation: one header is primary and the other secondary, and either can take either role. The secondary is held off while the primary supplies, then takes over automatically when the primary is depleted.

A local signal that shows operating status, and an indicator at all master alarm panels when, or just before, the secondary header begins to supply the system ( changeover )