Study guide
7.2 Installer Tests II: 24-Hour Standing Pressure & Vacuum Tests, Inspection & Witnessing
ASSE 6010 Medical Gas Systems Installer Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Credential, Codes & Medical Gas Fundamentals
1.1 The ASSE 6010 Credential: Eligibility, Exam Format & Recertification 1.2 Codes, Referenced Standards & the Medical Gas Team 1.3 Medical Gases, Hazards & Permitted Uses 1.4 Risk Categories & Category 1, 2, and 3 Piped Systems 1.5 Key NFPA 99 Definitions & Terminology
2 Chapter 2: Piping Materials, Oxygen Cleanliness & Joining Methods
2.1 Tube Specifications for Medical Gas and Vacuum Piping 2.2 Oxygen-Clean Materials: Delivery, Handling & Recleaning 2.3 Joining Methods: Permitted and Prohibited Joints
3 Chapter 3: Brazing Medical Gas Piping
3.1 Joint Preparation, Fittings, Filler Metals & Flux 3.2 Nitrogen Purge: Setup, Control & Final Tie-In Exception 3.3 Heating, Filling & Inspecting Brazed Joints 3.4 Brazing Procedure & Brazer Qualification, Records and Continuity
4 Chapter 4: Installing the Distribution Piping
4.1 Pipe Sizing, Protection & Permitted Locations 4.2 Supports, Buried Piping, Flexible Connectors & System Interconnections
5 Chapter 5: Valves, Station Outlets, Alarms & Labeling
5.1 Valve Requirements: Source, Main Line, Riser, Service & In-Line Valves 5.2 Zone Valves & Zone Valve Box Assemblies 5.3 Station Outlets & Inlets, Manufactured Assemblies & Pressure Indicators 5.4 Warning Systems: Master, Area & Local Alarms 5.5 Labeling, Identification & Color Codes
6 Chapter 6: Central Supply Systems & Source Equipment
6.1 Central Supply Locations, Cylinder Manifolds, Line Controls & Relief Valves 6.2 Cryogenic Supplies, Reserves, EOSC, IBER & Oxygen Concentrators 6.3 Medical Air Compressor Systems 6.4 Medical-Surgical Vacuum, WAGD & Medical Support Gas Sources
7 Chapter 7: Testing, Verification & Documentation
7.1 Installer Tests I: Blowdown, Initial Pressure, Cross-Connection & Piping Purge 7.2 Installer Tests II: 24-Hour Standing Pressure & Vacuum Tests, Inspection & Witnessing 7.3 System Verification: The Verifier's Test Sequence 7.4 Tie-Ins, Breached Systems, Operational Flow & Gas Concentration Tests 7.5 Documentation, Records & System Turnover
7.2 Installer Tests II: 24-Hour Standing Pressure & Vacuum Tests, Inspection & Witnessing
Key Takeaways Explain This Topic AI
Positive-pressure systems get a 24-hour standing pressure test with nitrogen NF at 20% above normal operating line pressure, after outlet valve bodies, faceplates, and all other distribution components are installed.
Leakage during the 24-hour positive-pressure test may not exceed 0.5% of the starting pressure (for example, 0.3 psi starting at 60 psig), excluding effects of ambient temperature changes.
Vacuum systems get a 24-hour standing vacuum test between 12 in. HgV and full vacuum, with the test vacuum source disconnected, and leakage limited to 0.5% of the starting vacuum.
The 24-hour positive-pressure test must be witnessed by an ASSE 6020 inspector, an ASSE 6030 verifier, or the AHJ or its designee, and a form documenting it goes to the verifier.
System inspections, including labeling and valve tagging of concealed components, happen before piping is concealed and must be done by a party other than the installing contractor.
Last updated: October 2026
The 24-Hour Standing Pressure Test (Positive-Pressure Gases)
- Item Requirement
- Prerequisite The initial pressure tests passed
Timing After final installation of station outlet valve bodies, faceplates, and all other distribution system components
- Source valve Closed
- Test gas Oil-free, dry nitrogen NF
- Duration 24 hours
- Test pressure 20% above the normal system operating line pressure
Acceptance Leakage over 24 hours may not exceed 0.5% of the starting pressure (for example, 0.3 psi starting at 60 psig ), except changes caused by ambient temperature
Leaks Locate them, repair (where permitted) or replace, and retest
Witness An ASSE 6020 inspector, an ASSE 6030 verifier, or the AHJ or its designee ; a form documenting the witnessed test goes to the verifier at the start of verification
Worked examples
- System Normal line pressure Test pressure (normal x 1.2) Maximum leakage (0.5% of start)
- Oxygen 50 psig 60 psig 0.30 psi
- Medical air 55 psig 66 psig 0.33 psi
- Nitrogen 160 psig 192 psig 0.96 psi
- Instrument air 175 psig 210 psig 1.05 psi
- Accounting for temperature
Gas pressure follows absolute temperature. Suppose an oxygen line starts at 60 psig (about 74.7 psia ) at 70°F (529.67°R), and the space cools to 65°F (524.67°R) overnight. With no leakage at all, the absolute pressure falls in proportion: P 2 = 74.7 × 524.67 529.67 ≈ 74.0 psia P_2 = 74.7 \times \frac{524.67}{529.67} \approx 74.0 \text{ psia} P 2 = 74.7 × 529.67 524.67 ≈ 74.0 psia
That is a drop of about 0.7 psi , more than twice the 0.3 psi limit, with no leak. This is why NFPA 99 excludes changes attributed to specific changes in ambient temperature . Record the temperature at the start and the end of the test. Then you can show whether a drop is temperature or a real leak, and a real leak must be found and fixed.
The 24-Hour Standing Vacuum Test
- Item Requirement
- Prerequisite The initial pressure tests passed (vacuum piping is also pressure tested at 150 psi minimum)
- Timing After installation of all components of the vacuum system
- Duration 24 hours
- Test level Between 12 in. HgV and full vacuum
- Test source Disconnected from the piping during the test
Acceptance Leakage may not exceed 0.5% of the starting vacuum (for example, 0.125 in. HgV starting at 25 in. HgV ), except changes caused by ambient temperature
Leaks Locate them, repair (where permitted) or replace, and retest
Witness and form The test is witnessed, and a form documenting it goes to the verifier at the start of verification
Example: a WAGD and vacuum branch is pulled to 24 in. HgV and isolated from the pump. The maximum allowable loss is 0.5% of 24, or 0.12 in. HgV . A reading of 23.7 in. HgV the next morning (a 0.3 in. loss) fails unless the change can be attributed to temperature.
System Inspection Before Concealment
NFPA 99 also requires inspections separate from the installer's own tests:
When: before piping is concealed in walls, ceilings, chases, trenches, underground, or otherwise hidden from view
Test gas: nitrogen NF, where gas is needed for the inspection
Who: a qualified party experienced in medical gas and vacuum pipeline inspection and testing, certified to ASSE 6020 (inspector) or ASSE 6030 (verifier)
Independence: performed by a party other than the installing contractor . Where the system was not installed by the facility's own personnel, the facility's qualified personnel may inspect it.
What: the presence and correctness of labeling and valve tagging for all concealed components and piping
Witnessing: the initial pressure tests performed by the installer are witnessed by an ASSE 6020 inspector, an ASSE 6030 verifier, or the AHJ or its designee, and documented on a form for the verifier
Practical Test-Day Checklist
Confirm the system is complete for the test stage: rough-ins for the initial test; valve bodies, faceplates, and components for the 24-hour test.
Close the source valve. Disconnect or isolate anything that test pressure could damage during initial tests.
Use calibrated gauges with a range and resolution suited to the acceptance criterion. A 0.3 psi limit cannot be read on a gauge with 5 psi divisions.
Record the start time, pressure, and temperature , and the end time, pressure, and temperature .
Have the witness sign the form, and file it for the verifier.
If a leak is found, repair it as the code permits. A joint may be reheated only once. Then retest from the start .
Tip
Do not mix up the two "20%" rules. 20% above normal pressure is the installer's 24-hour standing test pressure. Plus or minus 20% is the alarm trigger for line pressure. Also keep the durations straight: the installer's standing test lasts 24 hours , and the verifier's standing test lasts 10 minutes (Section 7.3).