Study guide
18.3 Aerial Conductors & Underground Wiring
Queensland Electrical Licence Capstone Assessment Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Capstone Overview
1.1 Current Capstone Exam Facts 1.2 Capstone Written & Practical Format 1.3 Queensland ESO Licence Pathway
2 AS/NZS 3000 Fundamentals
2.1 Scope & Fundamental Principles 2.2 Nominal Voltages & System Classifications 2.3 Conductor Identification & Colour Coding 2.4 Protection Against Electric Shock
3 Isolation, Switching & Special Locations
3.1 Isolation & Switching 3.2 Special Locations (Bathrooms, Pools & More) 3.3 Installation Defects & Rectification
4 Cable Selection Basics (AS/NZS 3008)
4.1 Current-Carrying Capacity & Installation Methods 4.2 Reference Temperatures & Insulation Types 4.3 Grouping & Thermal Derating Factors 4.4 Cable Short-Circuit Capacity
5 Voltage Drop & Selection Order
5.1 Voltage Drop (mV/A·m) & the 5% Limit 5.2 Order of Cable-Selection Checks 5.3 Worked Cable Selection Examples
6 Maximum Demand Calculations
6.1 Diversity & Appendix C Overview 6.2 Domestic Table C1 Demand Factors 6.3 Commercial Demand & Mains/Main-Switch Sizing
7 Circuit Protection Coordination
7.1 Overload & Short-Circuit Protection 7.2 The Ib ≤ In ≤ Iz Coordination Rule 7.3 Circuit-Breaker Curves & Breaking Capacity 7.4 Discrimination & Selectivity
8 RCDs, Division of Circuits & SELV/PELV
8.1 RCD Types & 30 mA Additional Protection 8.2 Division of Circuits 8.3 SELV & PELV Systems
9 Earthing & the MEN System
9.1 MEN System Principles & Fault Return Path 9.2 The MEN Link at the Main Switchboard 9.3 Main Earthing Conductor Sizing (Table 5.1) 9.4 Equipotential Bonding
10 Electrodes, Adiabatic & Prospective Fault Current
10.1 Earth Electrodes & Arrangements 10.2 The Adiabatic Equation for Protective Conductors 10.3 Prospective Fault Current
11 Earth-Fault-Loop Impedance & Disconnection
11.1 Earth-Fault-Loop Impedance (Zs = Ze + R1 + R2) 11.2 Disconnection Times (0.4 s & 5 s) 11.3 Breaking Capacity Coordination with PFC
12 Consumer Mains & Submains
12.1 Point of Supply Definitions 12.2 Consumer Mains Sizing & Installation 12.3 Submains Definitions & Sizing 12.4 Neutral & Earth Separation Downstream
13 QLD Electrical Safety Legislation
13.1 Electrical Safety Act 2002 & the ESO 13.2 Licensing Classes & Worker Duties 13.3 Certificates of Testing & Compliance 13.4 Construction Sites (AS/NZS 3012)
14 Safe Work & Critical Theory
14.1 Safe Isolation & Lock-Out/Tag-Out 14.2 Energised Electrical Work Controls 14.3 Effects of Electric Current (Critical EPC Theory)
15 Testing & Verification
15.1 AS/NZS 3000 Section 8 Test Sequence 15.2 Earth Continuity & Polarity 15.3 Insulation Resistance (1 MΩ at 500 V DC) 15.4 RCD Testing & Loop-Impedance Verification 15.5 AS/NZS 3017 Verification, Reporting & Documentation
16 DC, AC & Three-Phase Circuit Theory
16.1 DC Circuits, Ohm’s Law & Power 16.2 AC Generation, RMS Values & Phase 16.3 Three-Phase Systems & Phase Sequence
17 Motors, Transformers & Switchboards
17.1 Motor Selection, Enclosures & Starting Methods 17.2 Motor Overload & Short-Circuit Protection 17.3 Transformer Key Safety Issues 17.4 Switchboard Location, Arrangement & Form Types
18 Wiring Systems, Aerials & Hazardous Areas
18.1 Cable Installation & Termination Requirements 18.2 Final Subcircuits Into Switchboards 18.3 Aerial Conductors & Underground Wiring 18.4 Hazardous Areas & Classified Zones
19 Drawings, Commissioning & Fault Rectification
19.1 Reading, Sketching & Interpreting Electrical Diagrams 19.2 Commissioning & Decommissioning 19.3 Diagnosing & Rectifying Faults
20 Workplace Safety, Rescue & High Voltage
20.1 Statutory WHS Duties, Supervision & Duty of Care 20.2 Asbestos, Silica & Hazardous Gases 20.3 Workplace Safety Checks & Hazard Control 20.4 Rescue From Live Electrical Conductors 20.5 Electric Shock First Aid & CPR 20.6 High Voltage Dangers & Distribution Systems
18.3 Aerial Conductors & Underground Wiring
Key Takeaways Explain This Topic AI
EPC 27 covers aerial conductors, underground wiring and specialist cables under AS/NZS 3000 and local supply authority requirements
Aerial spans are limited by conductor type and support strength, and must maintain minimum clearances above ground, roads, driveways and structures
A catenary support system carries the mechanical load so the cable itself is not stressed in tension
Underground cables must be of a type suitable for direct burial or be enclosed, and must be laid at the required depth with marking tape or cover protection above them
Clearances and separation from other services such as gas, water and communications must be maintained, and existing services must be located before excavation
Last updated: August 2026
Aerial Conductors & Underground Wiring
Quick Answer: Aerial wiring is governed by span length, support strength and clearance ; underground wiring is governed by cable type, depth, mechanical protection and separation from other services . Both must satisfy AS/NZS 3000 and the local supply authority. Locate existing services before you dig, every time.
Why This Is a Critical Capability
An electrician running a submain to a shed, a workshop or a second dwelling is doing exactly this work. EPC 27 is critical because the failure modes are severe: an aerial span at insufficient height contacts a vehicle or a person, and an underground cable at insufficient depth is struck by the next person with a shovel.
Aerial Conductors — Types and Application
Type Description Typical application
Insulated aerial cable (aerial bundled) Insulated cores twisted, often with a bare or insulated catenary core Most common modern consumer mains and submains aerials
Catenary-supported cable Standard cable supported by a separate steel catenary wire Spans where the cable has no self-supporting strength
Bare conductors Uninsulated, spaced on insulators Legacy installations and distributor network — much greater clearance requirements
For consumer installations, insulated or catenary-supported systems are the normal answer. Bare conductors within a consumer's installation are largely historical and attract far larger clearance requirements.
Span Limitations and Clearances
Span length is limited by:
- the mechanical strength of the cable or catenary;
- the strength and stability of the supports at each end;
the permitted sag , which must not allow the conductor to fall below minimum clearance under maximum temperature and wind loading.
Clearances must be maintained above ground and above anything the span crosses. The categories to name are:
- Crossed feature Clearance principle
- Ground, not accessible to vehicles Sufficient to be clear of persons and equipment
- Driveways and areas accessible to vehicles Substantially greater, to clear trucks and machinery
- Public roads Greatest clearance, to the supply authority's requirement
Roofs and structures Clearance above, below and beside, so the cable cannot be reached from a normally accessible position
Swimming pools Aerial conductors over a pool are heavily restricted
Always take the actual values from the current AS/NZS 3000 clause and the local supply authority requirements on the day. The examinable knowledge is the hierarchy — pedestrian areas need less than vehicle areas, which need less than public roads — plus the discipline of measuring at maximum sag , not at the pole.
Supporting Poles, Posts and Struts
Select the pole material and section for the loading — conductor tension, wind, and any future addition.
Set the pole to sufficient depth and consolidate the backfill; a leaning pole reduces clearance across the whole span.
Use struts or stays where the pull is one-directional, such as at a termination.
Confirm the structure being used as a support can take the load. A private pole attached to a light timber fascia is a defect.
Provide safe access for maintenance and correct earthing where a metallic pole is used.
Catenary Support Systems
A catenary wire carries the mechanical load so the cable does not:
Terminate the catenary at each end to purpose-made anchors, not to the cable glands.
Tension the catenary so sag stays within clearance limits at maximum temperature.
Attach the cable with hangers at appropriate intervals so no tension reaches the cable itself.
Earth the catenary where required, since a steel wire spanning between structures can otherwise become a hazard.
Provide a drip loop at each entry so water does not track along the cable into an enclosure.
Underground Wiring — Cable Categories
Acceptable underground arrangements depend on the protection provided:
Category Typical arrangement
Direct buried Cable specifically suitable for direct burial, at full required depth, with protective cover and marking tape
- Enclosed in conduit Cable in heavy-duty conduit, which may permit reduced depth in some situations
- Under a slab or paving Enclosed and protected; the surface treatment does not itself substitute for depth
- Under a roadway or driveway Greater depth and full mechanical protection, usually heavy-duty conduit
Depth requirements increase with the likelihood of disturbance: a garden bed differs from a driveway, which differs from a road crossing. Take the values from the current clause; know the principle that depth follows risk of excavation and vehicle loading.
Marking is required so the next person finds the cable before their shovel does: orange marking tape at the specified height above the cable, or a protective cover slab, or both, depending on the arrangement.
Clearances From Other Services
Underground electrical cables must be separated from other services. The reasons are specific and examinable:
Gas — an electrical fault near a gas line is a fire and explosion risk; a gas leak into a cable trench is equally hazardous.
Water and sewer — excavation for repair of one service must not damage the other; water in a trench accelerates cable degradation.
Communications — induced voltage and physical damage during maintenance.
Where the required separation cannot be achieved, a barrier or additional mechanical protection is used, and crossings are made at the specified separation with the electrical cable normally in conduit.
Before You Excavate
Obtain service location information and have the site scanned or potholed.
Hand-dig in the vicinity of known services.
Treat any unidentified cable as live until proven otherwise.
Record the as-installed route and depth so future work is safer.
Reinstate marking tape and covers before backfilling — this is the step most often skipped and it is a defect.