Study guide
14.3 Airworthiness, Serviceability and Defect Reporting
CASA Remote Pilot Licence RePL
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the RePL Exam 1.2 How to Use This Guide & Build a Study Plan
2 RPA Air Law: Regulatory Framework & Standard Operating Conditions
2.1 CASR Part 101 and the Manual of Standards 2.2 Standard Operating Conditions (SOC) 2.3 The 120 m (400 ft) AGL Height Limit 2.4 VLOS, Daylight, Visibility and the One-RPA Rule
3 RPA Air Law: Licensing, Categories & Approvals
3.1 RePL vs ReOC: Pilot Licence vs Operator Certificate 3.2 Excluded Categories and Operator Accreditation 3.3 RPA Weight Categories and Registration 3.4 Operating Beyond the SOC: Approvals and the ReB1
4 Basic Aviation Knowledge (RBAK)
4.1 Direction, Wind Velocity and Aviation Time 4.2 Units of Measurement: Height, Altitude and Elevation 4.3 Aerodynamics: Lift, Drag, Thrust, Weight and Energy 4.4 Weight and Balance: Terms and Limits 4.5 Propellers and Rotors 4.6 Axes, Attitude and Flight Control Principles 4.7 The Remote Pilot Station
5 RPAS Systems: Platforms, C2 Link & Power
5.1 Multirotor vs Fixed-Wing Characteristics 5.2 Command-and-Control Link and Failsafes 5.3 Lithium-Polymer Battery Management and Safety
6 RPAS Systems: Sensors, Payload & Preflight
6.1 GNSS, Compass, IMU and Geofencing 6.2 Payload, Centre of Gravity and Pre-Flight Checks 6.3 Automated Flight Management Systems (RAFM)
7 Electrical & Electronic Systems (REES)
7.1 Electrical Terms and RPAS Electrical Components 7.2 Electric Motors, Kv and Current Draw 7.3 Battery Types, Specifications and Dangerous Goods 7.4 Charging, Discharging, Balancing and Battery Limitations 7.5 Radio Waves, Frequency Bands and Propagation 7.6 GPS Components, Errors and Electromagnetic Hazards
8 Multirotor Aerodynamics & Performance (RBKM)
8.1 Multirotor Airframe and Component Layout 8.2 Rotor Aerodynamics: Blade Design, Thrust, Drag and Torque 8.3 Hovering: Ground Effect, Recirculation and Translational Lift 8.4 Multirotor Flight Controls, Stabilisation and GPS Hold 8.5 Motor Failure, Rotor Direction and Abnormal Aerodynamics 8.6 Weight, Power, Wind and Climb Performance 8.7 Descent, Vortex Ring State and Landing
9 Navigation & Charts
9.1 Chart Fundamentals: Latitude, Longitude, Variation and Distance 9.2 Visual Terminal Charts and Visual Navigation Charts 9.3 Airspace Classes, Control Zones and CTA Steps 9.4 Restricted, Danger and Prohibited Areas and Obstacles 9.5 NOTAMs, the AIP and Chart Currency
10 Meteorology
10.1 Wind, Sea Breezes and Local Effects 10.2 Turbulence, Orographic Effects and Terrain 10.3 Thunderstorms, Fronts and Fog 10.4 Density Altitude, METAR/TAF and BoM Forecasts 10.5 Weather Observations: Reading the Sky and the Site
11 Human Factors
11.1 IMSAFE, Fatigue and Complacency 11.2 Situational Awareness, Fixation and External Pressure 11.3 Alcohol, Drugs and Crew Resource Management 11.4 Vision, Visual Limitations and Illusions 11.5 Stress and Stress Management 11.6 Threat and Error Management
12 Radio & AROC
12.1 Phonetic Alphabet, Phraseology and CTAF 12.2 The 121.5 MHz Emergency Frequency, Transponder Codes and the AROC
13 Risk & Operational Procedures
13.1 Job Safety Assessment, Risk Assessment and the Hierarchy of Controls 13.2 Site Survey, Bystander Management, Emergencies and Giving Way
14 Operations, Airworthiness & Reporting (RKOP)
14.1 Remote Pilot Responsibilities, Crew Briefing and Ground Operations 14.2 Operational, Remote Pilot and Technical Logs 14.3 Airworthiness, Serviceability and Defect Reporting 14.4 Role Equipment, Sensors and Payload Implications 14.5 Accident and Incident Reporting to the ATSB 14.6 Abnormal Operations, Fail-Safes and Flight Termination 14.7 Operating Near Aerodromes and Above 400 ft AGL
14.3 Airworthiness, Serviceability and Defect Reporting
Key Takeaways Explain This Topic AI
Section 20AA(4) of the Civil Aviation Act prohibits commencing a flight where there is an outstanding maintenance requirement, where maintenance will be needed before the flight ends, or where a defect may endanger safety.
Every ReOC holder must nominate a maintenance controller responsible for ensuring the RPA operated under the certificate are serviceable.
Large RPA over 150 kg require an experimental or restricted-category certificate of airworthiness under CASR 101.255.
Determining serviceability for a specific operation is a pilot judgement made against the technical log, the manufacturer's schedule and the demands of the task.
Last updated: August 2026
Airworthiness Applies to Drones Too
Candidates sometimes assume airworthiness is a crewed-aviation concept. It is not. Section 20AA(4) of the Civil Aviation Act 1988 applies to all Australian aircraft, RPA included. It provides that an owner, operator, hirer or pilot must not commence a flight, or permit a flight to commence, if any of the following apply:
there is an outstanding requirement imposed by or under the regulations in relation to maintenance of the aircraft;
the aircraft will require maintenance before the flight can end ; or
there is a defect or damage that may endanger the safety of the aircraft, or of any person or property.
That is the legal frame. Everything else in this section is about how a remote pilot satisfies themselves that none of the three applies.
Who Is Responsible
Party Airworthiness responsibility
RPA operator (ReOC holder) Ultimately responsible for ensuring continuing airworthiness; must nominate a maintenance controller
Maintenance controller (MC) Ensures the RPA operated under the ReOC are serviceable — maintenance by competent personnel, record keeping, essential equipment checks, and defect investigation
Registered operator of a large RPA Must ensure the aircraft is maintained under the applicable parts of CAR 1988 and is in a condition for safe operation
Remote pilot in command Determines serviceability for this flight, conducts inspections, and reports defects and unserviceability
The MC's functions and duties are set out in AC 101-05 , and for RPA above a certain weight CASA assesses the MC's suitability directly.
Certificates of airworthiness
Most RPA do not hold a certificate of airworthiness. Large RPA (more than 150 kg) are the exception: under CASR 101.255(1) they require either an experimental certificate or a restricted-category certificate of airworthiness , issued under Subpart 21.H, before they may be operated.
Determining Serviceability for a Specific Operation
Schedule 4 topic 3(a) asks the pilot to determine RPAS serviceability for a specific operation — and the phrase "for a specific operation" is doing real work. Serviceability is not a binary property of the aircraft; it is a judgement about whether this aircraft, in this condition, is fit for this task.
Work through four questions:
Is there an open defect in the technical log? Read it before every flight. An entry that has not been signed off as rectified is an open question, not a historical note.
Is scheduled maintenance due or overdue? Check hours or cycles against the manufacturer's schedule. An aircraft due for a motor change at 200 hours is not serviceable at 205.
Does the physical inspection reveal anything? The walk-around covered in the multirotor chapter: airframe cracks, arm locks, motor free rotation, propeller condition, secure fasteners, connector condition, antenna integrity, battery condition.
Is the aircraft adequate for the specific task? A minor defect that is acceptable for a low-risk flight over an empty paddock may be unacceptable for a flight near people or infrastructure. A hexacopter with a marginal motor should not be flown over an asset where a second failure would be catastrophic.
That fourth question is the reason the wording is "for a specific operation". The same aircraft can be serviceable for one job and not for another on the same day.
Inspections
Schedule 4 topic 3(c)(i) makes conducting inspections of the RPA an explicit RePL holder responsibility. Three levels apply:
Pre-flight inspection , before every flight:
- Area Check
- Airframe Cracks at arm joints, mounting points, shell; fasteners present and tight; arm locks engaged
- Propellers Correct handedness; no nicks, cracks or delamination; fully seated and locked
- Motors Free, smooth rotation; no grinding, catching or lateral play; mounting bolts tight
Wiring and connectors No chafing, no discolouration (a sign of a hot, high-resistance joint), connectors fully seated
- Battery Correct type; cell voltages within 0.05 V of each other; no swelling; latched securely
- Antennas and GNSS mast Undamaged, upright, connectors seated, not shadowed by payload
- Payload and gimbal Secure at the designed station; cables routed clear of rotors and gear
- Landing gear Secure, uncracked; retractable gear cycles and locks
- Firmware Aircraft, controller and battery versions current and matched
Post-flight inspection , after every flight: damage acquired in flight, propeller condition, motor and battery temperature, and anything the flight revealed. Then log it.
Scheduled maintenance , against the manufacturer's programme: hour- or cycle-based motor, bearing and propeller replacement, structural inspection, and battery retirement criteria.
Reporting Defects and Unserviceability
Schedule 4 topic 3(c)(ii) requires the RePL holder to report defects or unserviceability . That reporting runs in two directions.
Internally , to the operator:
Enter every defect in the technical log at the time it is observed, with enough detail for someone else to act on it: what, when, in what phase of flight, with what symptoms.
Notify the maintenance controller where the operator's DPP requires it, and always for anything that grounds the aircraft.
Placard or physically segregate an unserviceable aircraft so the next pilot cannot inadvertently fly it. A note on a screen is easier to miss than a tag on the case.
Externally , where the occurrence is reportable:
Reportable safety occurrences go to the ATSB under the Transport Safety Investigation Regulations (covered in the next section).
Where a defect points to a design or manufacturing problem — a pattern of arm failures, a firmware behaviour that produces an uncommanded input — the manufacturer should be informed, and CASA may need to be where the safety implications are broad.
The judgement that matters most
The hardest airworthiness decision is not the obvious one. Nobody flies an aircraft with a cracked arm. The difficult call is the small, ambiguous item: a motor that has been slightly warm for a few flights, a propeller with a nick you could argue is cosmetic, a telemetry dropout that only happens at range, a battery whose cells take a little longer to balance than they used to.
Those are exactly the items that section 20AA(4) is aimed at, because "a defect that may endanger" is a low threshold deliberately. The professional answer is to write it in the technical log, ground the item if there is genuine doubt, and let the maintenance controller decide — rather than making a private judgement under time pressure with a client waiting. An aircraft that does not fly today costs a job. An aircraft that fails over a person costs considerably more.