Study guide
12.6 Structural Steel Erection & Connections
Arizona General Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Introduction & Exam Overview
1.1 Current Exam Facts 1.2 The Arizona Contractor Licensing Path 1.3 How to Use This Guide & Study Plan
2 Chapter 2: Arizona ROC & Licensing Law
2.1 The Arizona Registrar of Contractors 2.2 License Classifications 2.3 Qualifying Party & Experience Requirements 2.4 Application, Fees, Bond & Background Check 2.5 License Bonds, Cash Deposits & Bond Claims 2.6 Unlicensed Contracting: Penalties & Lost Remedies 2.7 Advertising Rules, Contract Disclosures & Workmanship Standards
3 Chapter 3: The Exams — SRE, Trade & NASCLA
3.1 The Statutes & Rules Exam (SRE) 3.2 The PSI Trade Exam 3.3 The NASCLA Commercial General Building Exam Option
4 Chapter 4: License Maintenance, Recovery Fund & Discipline
4.1 License Renewal & Continuing Education 4.2 The Residential Contractors' Recovery Fund 4.3 ROC Disciplinary Actions & Penalties
5 Chapter 5: Contract Law & Disputes
5.1 Arizona Contract Fundamentals 5.2 Construction Contract Terms & Provisions 5.3 Change Orders & Modifications 5.4 Dispute Resolution & ROC Complaints 5.5 The Arizona Prompt Payment Act
6 Chapter 6: Liens, Bonds & Insurance
6.1 Arizona Mechanics' Lien Law Overview 6.2 Lien Notices, Recording & Deadlines 6.3 Contract Bonds: Bid, Performance & Payment 6.4 Insurance Requirements
7 Chapter 7: Financial Management & Taxes
7.1 Accounting & Financial Statements 7.2 Estimating, Bidding & Markup 7.3 Taxes & Payroll
8 Chapter 8: Project Management
8.1 Scheduling & the Critical Path Method 8.2 Supervision, Subcontractors & Quality Control 8.3 Project Documentation & Closeout
9 Chapter 9: Safety & OSHA
9.1 OSHA Construction Standards Overview 9.2 Fall Protection, Scaffolds & Ladders 9.3 Excavation, Trenching & Electrical Safety 9.4 Heat Illness Prevention & Arizona Job-Site Hazards
10 Chapter 10: Building Codes, Permits & Plan Reading
10.1 IRC 2018 & IBC 2018 Fundamentals 10.2 Permits, Plan Review & Inspections 10.3 Energy Code & Accessibility 10.4 Reading Construction Drawings & Specifications 10.5 Means of Egress & Fire-Resistance-Rated Construction
11 Chapter 11: Sitework, Concrete & Masonry
11.1 Sitework: Surveying, Excavation & Grading 11.2 Concrete: Formwork, Reinforcement & Placing 11.3 Masonry: Brick, Block & Mortar 11.4 Soils, Compaction & Earthwork Testing 11.5 Concrete Materials & Mix Design 11.6 Concrete Curing, Joints, Testing & Defects 11.7 Masonry Reinforcement, Grouting & Wall Systems
12 Chapter 12: Carpentry, Metals & Building Envelope
12.1 Carpentry & Framing 12.2 Metals & Metal Framing 12.3 Thermal & Moisture Protection 12.4 Doors, Windows & Finishes 12.5 Engineered Wood, Trusses & Connectors 12.6 Structural Steel Erection & Connections 12.7 Steel Joists, Girders & Metal Deck
13 Chapter 13: Roofing, Waterproofing & Interior Finishes
13.1 Roofing Systems 13.2 Waterproofing, Flashing & Sealants 13.3 Interior Finishes: Gypsum, Stucco, Flooring & Paint
14 Chapter 14: Building Systems for the General Contractor
14.1 Mechanical & Plumbing Systems 14.2 Electrical Systems & Temporary Power
12.6 Structural Steel Erection & Connections
Key Takeaways Explain This Topic AI
Wide-flange shapes are designated by nominal depth and weight per foot, as in W12x26, and ASTM A992 is the standard grade for structural wide-flange members
Bolted connections are either snug-tightened bearing joints or pretensioned/slip-critical joints, and only the latter require a verified installation method
Turn-of-nut, calibrated wrench, twist-off tension-control bolts, and direct-tension-indicator washers are the four accepted pretensioning methods
A welding symbol places field-side information below the reference line and other-side information above it, with a flag denoting a field weld
OSHA 29 CFR 1926 subpart R requires the controlling contractor to certify the concrete's adequacy before steel erection begins, and columns to be anchored with at least four anchor rods
Last updated: August 2026
Why Metals Is the Second-Heaviest Area
Quick Answer: Metals is 13 of 100 items on the AZ ROC B-1/B-2/KB-1/KB-2 outline — more than Carpentry, more than Safety, second only to Concrete. Questions cluster around shapes and grades , bolted connection types , welding fundamentals , and erection safety .
A general building contractor rarely swings the iron, but the general contractor is the controlling contractor under OSHA's steel erection rules, which places specific, non-delegable duties on them before the first column goes up. That combination — technical knowledge plus a regulatory role — is why the area carries so much weight.
Shapes, Grades, and Designations
- Designation Shape Reading it
- W12x26 Wide flange Nominal 12 in. deep, 26 lb per linear foot
- HSS6x6x1/4 Hollow structural section 6 x 6 in. square tube, ¼ in. wall
- C10x15.3 American standard channel 10 in. deep, 15.3 lb/ft
- L4x4x1/2 Angle 4 x 4 in. legs, ½ in. thick
- WT Structural tee Cut from a W shape
- PL Plate Thickness x width x length
The number after the "x" in a W shape is weight per foot , not a dimension — a W12x26 and a W12x40 are the same nominal depth with very different flange thickness and capacity. Substituting one for the other because "they're both W12s" is a real field error.
- Grade Where used
- ASTM A992 Standard for structural wide-flange shapes, 50 ksi yield
- ASTM A36 Plates, angles, and miscellaneous steel, 36 ksi yield
- ASTM A500 HSS tube and pipe
- ASTM A325 / F3125 Gr. A325 Structural bolts, medium strength
- ASTM A490 / F3125 Gr. A490 Structural bolts, high strength
Mill certifications tie each delivered piece back to its grade. On a commercial job the general contractor collects them as part of the submittal and closeout record.
Bolted Connections
Nearly all field connections are bolted; welding is mostly shop work. The exam distinction that matters is the joint type , because it determines the installation method and the inspection.
Joint type How it carries load Installation
Snug-tightened bearing joint Bolt bears against the hole; plies may slip into bearing Bolts brought to snug tight — the full effort of an ironworker with a spud wrench, or a few impacts of an impact wrench
Pretensioned joint Bolt is tensioned to a specified minimum Requires a verified pretensioning method
Slip-critical joint Friction between faying surfaces prevents any slip Pretensioned and faying surfaces prepared to a specified class
Most connections in a typical building are snug-tightened , and over-tightening them is not "extra safety" — it is a deviation from the specification. Pretensioned and slip-critical joints appear where slip cannot be tolerated: connections subject to load reversal, fatigue, or oversized and slotted holes.
The Four Pretensioning Methods
- Method How it works
- Turn-of-nut From snug tight, rotate the nut a specified additional amount based on bolt length and diameter
- Calibrated wrench Torque wrench calibrated daily against a tension-measuring device
- Twist-off tension-control bolts The splined end shears off at the required tension
- Direct-tension-indicator washers Protrusions flatten to a measurable gap at the required tension
Hole types matter too: standard round, oversize, short-slotted, and long-slotted holes each carry rules about washers and about which joint types may use them. Never enlarge a hole with a torch — flame cutting a bolt hole is prohibited unless specifically permitted and is a classic field violation.
Welding Fundamentals
- Process Common name Typical use
- SMAW Stick Field welding, wind-tolerant
- GMAW MIG Shop, high deposition
- FCAW Flux-cored Field structural welding
- SAW Submerged arc Shop, long automated welds
Weld types. A fillet weld joins members at an angle and is described by its leg size ; a groove weld fills a prepared joint between members and may be complete- or partial-penetration.
Reading a welding symbol. The rules are positional and are worth memorizing because they turn up as an exam item:
Information below the reference line applies to the arrow side of the joint.
Information above the reference line applies to the other side .
A flag at the kink means a field weld .
A circle at the kink means weld all around .
The number to the left of the symbol is the weld size ; numbers to the right are length and pitch .
Quality. Structural welding follows AWS D1.1, and welders qualify to specific procedures. Inspection ranges from visual inspection to ultrasonic testing on complete-penetration welds. Common defects — undercut, porosity, incomplete fusion, slag inclusions, and cracks — are all rejectable and traceable to the procedure or the welder rather than the design.
Erection Safety: OSHA Subpart R
29 CFR 1926 Subpart R governs steel erection and places specific duties on the controlling contractor — normally the general contractor:
Requirement Detail
Concrete strength certification The controlling contractor must provide written notification that concrete in footings, piers, and walls has attained either 75% of specified compressive strength or sufficient strength to support loads, before steel erection begins
Adequate access Firm, properly graded, drained access roads and a work area for hoisting equipment
Column anchorage Columns anchored with a minimum of four anchor rods , designed to resist a specified eccentric load
Repair or modification of anchor rods Not permitted without the approval of the project structural engineer of record
Double connections At columns and beam webs over a column, a means must be provided so the first member remains supported when the second is being connected
Fall protection Generally required for connectors and in controlled decking zones per the subpart's specific triggers
Perimeter safety cables Required at the perimeter of multi-story structures
That first row is the one general contractors most often miss. Steel erection may not begin on a written promise or a phone call — the subpart requires written notification that the supporting concrete has reached the required strength, and it is the controlling contractor who issues it.
Warning: anchor rods set out of tolerance are a routine problem, and the fix is not a field decision. Repairing, replacing, or field-modifying anchor rods requires the approval of the structural engineer of record.