Study guide
10.2 Permits, Plan Review & Inspections
Arizona General Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Introduction & Exam Overview
1.1 Current Exam Facts 1.2 The Arizona Contractor Licensing Path 1.3 How to Use This Guide & Study Plan
2 Chapter 2: Arizona ROC & Licensing Law
2.1 The Arizona Registrar of Contractors 2.2 License Classifications 2.3 Qualifying Party & Experience Requirements 2.4 Application, Fees, Bond & Background Check 2.5 License Bonds, Cash Deposits & Bond Claims 2.6 Unlicensed Contracting: Penalties & Lost Remedies 2.7 Advertising Rules, Contract Disclosures & Workmanship Standards
3 Chapter 3: The Exams — SRE, Trade & NASCLA
3.1 The Statutes & Rules Exam (SRE) 3.2 The PSI Trade Exam 3.3 The NASCLA Commercial General Building Exam Option
4 Chapter 4: License Maintenance, Recovery Fund & Discipline
4.1 License Renewal & Continuing Education 4.2 The Residential Contractors' Recovery Fund 4.3 ROC Disciplinary Actions & Penalties
5 Chapter 5: Contract Law & Disputes
5.1 Arizona Contract Fundamentals 5.2 Construction Contract Terms & Provisions 5.3 Change Orders & Modifications 5.4 Dispute Resolution & ROC Complaints 5.5 The Arizona Prompt Payment Act
6 Chapter 6: Liens, Bonds & Insurance
6.1 Arizona Mechanics' Lien Law Overview 6.2 Lien Notices, Recording & Deadlines 6.3 Contract Bonds: Bid, Performance & Payment 6.4 Insurance Requirements
7 Chapter 7: Financial Management & Taxes
7.1 Accounting & Financial Statements 7.2 Estimating, Bidding & Markup 7.3 Taxes & Payroll
8 Chapter 8: Project Management
8.1 Scheduling & the Critical Path Method 8.2 Supervision, Subcontractors & Quality Control 8.3 Project Documentation & Closeout
9 Chapter 9: Safety & OSHA
9.1 OSHA Construction Standards Overview 9.2 Fall Protection, Scaffolds & Ladders 9.3 Excavation, Trenching & Electrical Safety 9.4 Heat Illness Prevention & Arizona Job-Site Hazards
10 Chapter 10: Building Codes, Permits & Plan Reading
10.1 IRC 2018 & IBC 2018 Fundamentals 10.2 Permits, Plan Review & Inspections 10.3 Energy Code & Accessibility 10.4 Reading Construction Drawings & Specifications 10.5 Means of Egress & Fire-Resistance-Rated Construction
11 Chapter 11: Sitework, Concrete & Masonry
11.1 Sitework: Surveying, Excavation & Grading 11.2 Concrete: Formwork, Reinforcement & Placing 11.3 Masonry: Brick, Block & Mortar 11.4 Soils, Compaction & Earthwork Testing 11.5 Concrete Materials & Mix Design 11.6 Concrete Curing, Joints, Testing & Defects 11.7 Masonry Reinforcement, Grouting & Wall Systems
12 Chapter 12: Carpentry, Metals & Building Envelope
12.1 Carpentry & Framing 12.2 Metals & Metal Framing 12.3 Thermal & Moisture Protection 12.4 Doors, Windows & Finishes 12.5 Engineered Wood, Trusses & Connectors 12.6 Structural Steel Erection & Connections 12.7 Steel Joists, Girders & Metal Deck
13 Chapter 13: Roofing, Waterproofing & Interior Finishes
13.1 Roofing Systems 13.2 Waterproofing, Flashing & Sealants 13.3 Interior Finishes: Gypsum, Stucco, Flooring & Paint
14 Chapter 14: Building Systems for the General Contractor
14.1 Mechanical & Plumbing Systems 14.2 Electrical Systems & Temporary Power
10.2 Permits, Plan Review & Inspections
Key Takeaways Explain This Topic AI
An Arizona contractor license is required when total project cost exceeds $1,000; a separate local building permit is also required for most construction
The plan-review process checks drawings for code compliance before the jurisdiction issues a permit
Inspections follow a fixed sequence: footing, rough-in, framing, insulation, then final
A Certificate of Occupancy authorizes lawful occupancy and is issued after the final inspection passes
The qualifying party is responsible for ensuring permits are obtained and inspections pass; working without a permit is grounds for ROC discipline
Last updated: August 2026
When a Permit Is Required
Two thresholds operate in parallel in Arizona:
ROC $1,000 threshold — Arizona requires a contractor license for any construction, alteration, or repair where the total project cost exceeds $1,000 . Projects under $1,000 that do not require a building permit are exempt from licensure.
Local building permit — The city or county building department separately determines when a permit is required for the work itself (new construction, additions, structural alterations, electrical/plumbing/mechanical work, fences over a certain height, and so on). Requirements vary by jurisdiction.
A licensed contractor must still pull the local building permit even though they already hold an ROC license — the two are distinct authorizations. The ROC license authorizes the contractor to engage in the business; the building permit authorizes the specific project.
The Plan-Review Process
Before construction begins, the contractor or design professional submits construction drawings and specifications to the local building department for plan review . The plans examiner checks the drawings for compliance with the adopted code edition (IRC for residential, IBC for commercial), including:
- Structural design (foundations, framing, lateral load path)
- Means of egress (doors, stairs, exit widths)
- Fire-resistance ratings and separations
- Energy code compliance (IECC)
- Accessibility (commercial)
- Site grading and drainage
- Plan-Review Submittal Package
A typical plan-review submittal includes:
- Site plan showing property lines, setbacks, and grading
- Foundation and framing plans with structural details and calculations
- Floor plans, elevations, and sections demonstrating code compliance
- Mechanical, electrical, and plumbing layouts (commercial and complex residential)
- Energy code compliance documentation (IECC prescriptive worksheet or performance report)
- Specifications organized under CSI MasterFormat
- Structural calculations stamped by a licensed design professional (engineer or architect) when required
When the review is complete, the jurisdiction issues a permit (often with a set of correction comments that must be addressed before or during construction). Fees are typically based on the project's valuation , which the jurisdiction determines from the submitted scope or from a declared construction cost.
What Happens When an Inspection Fails
If an inspector finds noncompliant work, a correction notice is issued identifying the deficiency. The contractor must correct the issue and re-request the same inspection before proceeding. Reinspection fees may apply after repeated failures. Common reasons for failed inspections include:
- Foundation excavations too shallow or rebar misplaced
- Rough-in plumbing or electrical not properly secured or spaced
- Framing missing required headers, fire-blocking, or bracing
- Insulation with gaps or incorrect R-value for the climate zone
- Final inspection with missing smoke alarms, incomplete egress, or unfinished accessibility features
- Types of Inspections
Once permitted work begins, the contractor must request inspections at defined stages. Work must not proceed beyond an inspection point until the inspector approves the prior stage.
- Sequence Inspection What Is Verified
- 1 Footing/foundation Excavation depth, rebar size and placement, footing dimensions before concrete is poured
- 2 Plumbing/MEP rough-in Under-slab or wall plumbing, electrical boxes, HVAC ducts before concealment
- 3 Framing Wall, floor, and roof framing after rough-in approval but before insulation and drywall
- 4 Insulation (where required) Insulation type, R-value, vapor barriers before drywall
5 Final All finish work, smoke/CO alarms, egress, accessibility, energy measures; leads to certificate of occupancy
Quick Answer: Inspections occur in a fixed sequence — footing, rough-in, framing, insulation, final — and work cannot proceed past a stage until the inspector signs off.
Certificate of Occupancy
For commercial and new residential construction, the building department issues a Certificate of Occupancy (C of O) after the final inspection passes. The C of O is the legal authorization to occupy the building. Without it, the owner cannot lawfully use or occupy the structure, and utilities may not be released.
Working Without a Permit — Consequences
Performing work that requires a permit without one exposes the contractor and property owner to:
- Stop-work orders — the jurisdiction halts construction until a permit is obtained
- Double permit fees — many jurisdictions charge a surcharge for work started without a permit
Code compliance regardless — the work must still meet the adopted code; if it was concealed, the jurisdiction may require destructive inspection (opening walls) to verify compliance
ROC discipline — working without a required permit is a code violation that the ROC can cite, fine, or use as grounds for suspension or revocation of the contractor license
Insurance and warranty issues — work without a permit may void homeowners insurance and manufacturer warranties
Responsibility of the Qualifying Party
Under A.R.S. Title 32, Chapter 10, the qualifying party is the individual named on the license who is regularly employed and actively engaged in the licensed work. The qualifying party and the contractor entity are responsible for:
- Ensuring all required permits are obtained before work begins
- Scheduling and passing inspections at each required stage
- Correcting work that fails inspection
- Complying with the adopted code edition and local amendments
- Supervising employees and subcontractors so their work meets code
The ROC holds the qualifying party accountable for code violations and work without a permit — discipline runs against both the license and the individual.
Quick Answer: The ROC license authorizes the contractor to do business; the local building permit authorizes the specific project. The qualifying party is responsible for obtaining both and passing every inspection.