Study guide
9.2 Primary Clarification Design & Settling Mechanics
Arizona Water/Wastewater Operator Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Arizona Regulatory Framework & ADEQ Certification
1.1 ADEQ Operator Certification Rules & Grade Structure 1.2 Facility Classification & Operator in Direct Responsible Charge (ODRC) 1.3 Arizona Aquifer Protection Permit (APP) Program & BADCT 1.4 AZPDES Surface Water Discharges & Arizona Reclaimed Water Standards 1.5 The WPI Need-to-Know Criteria: What Is Actually on Your Exam
2 Chapter 2: Federal Drinking Water & Clean Water Act Compliance
2.1 Safe Drinking Water Act (SDWA) Primary & Secondary MCLs 2.2 Surface Water Treatment Rules & Revised Total Coliform Rule (RTCR) 2.3 Stage 1 & Stage 2 Disinfectants/Disinfection Byproducts Rules (D/DBPR)
3 Chapter 3: Source Water Assessment, Wells & Watershed Protection
3.1 Groundwater Sources, Well Components & Water Level Measurement 3.2 Surface Water Sources, Intakes & Reservoir Management 3.3 Watershed Management, Contamination Sources & Public Education 3.4 Pretreatment: Aeration, Presedimentation & Algae Control
4 Chapter 4: Source Water Quality, Coagulation & Flocculation
4.1 Arizona Source Water Quality & Arid Climate Challenges 4.2 Coagulation Chemistry, Coagulants & Jar Testing 4.3 Flocculation Basin Design & Process Control 4.4 Sedimentation Basins, Clarifiers & Solids Contact Units
5 Chapter 5: Filtration Systems & Advanced Separation
5.1 Granular Media Filtration Principles & Media Types 5.2 Filter Backwash Operations, Ripening & Filter-to-Waste 5.3 Membrane Filtration & Reverse Osmosis Desalination 5.4 Ion Exchange Softening, Arsenic Removal & GAC Adsorption
6 Chapter 6: Drinking Water Disinfection & Chemical Oxidation
6.1 Chlorine Chemistry & Break-Point Chlorination 6.2 The CT Disinfection Concept & Basin Hydraulics 6.3 Alternative Disinfectants: Chloramines, Ozone, UV & Chlorine Dioxide
7 Chapter 7: Specialized Drinking Water Treatment & Chemical Conditioning
7.1 Iron & Manganese Removal 7.2 Fluoridation: Chemicals, Dosage & Safety 7.3 Corrosion Control, Saturation Indices & the Lead and Copper Rule 7.4 Water Treatment Plant Residuals Handling & Disposal
8 Chapter 8: Water Treatment Plant Equipment Operation & Maintenance
8.1 Raw Water Intake, Screening & Pumping Equipment 8.2 Chemical Feed Equipment, Storage & Metering 8.3 Instrumentation, Online Analyzers, SCADA & Calibration 8.4 Valves, Motors, Auxiliary Systems & Maintenance Programs
9 Chapter 9: Wastewater Preliminary, Primary & Biological Treatment Principles
9.1 Wastewater Characteristics & Preliminary Treatment 9.2 Primary Clarification Design & Settling Mechanics 9.3 Biological Treatment Kinetics & Microbiology
10 Chapter 10: Activated Sludge Processes & Nutrient Removal
10.1 Activated Sludge Configurations & Operational Mass Balance 10.2 Process Control Parameters, Settleability & Troubleshooting 10.3 Biological Nutrient Removal: Nitrification, Denitrification & Phosphorus Removal
11 Chapter 11: Fixed-Film, Lagoon & Advanced Secondary Processes
11.1 Trickling Filters & Attached Growth Fundamentals 11.2 Rotating Biological Contactors & Hybrid Processes 11.3 Stabilization Ponds & Lagoon Systems 11.4 Membrane Bioreactors
12 Chapter 12: Tertiary Treatment, Wastewater Disinfection & Effluent Management
12.1 Tertiary Filtration & Advanced Effluent Polishing 12.2 Wastewater Chlorination & Dechlorination 12.3 Ultraviolet & Ozone Disinfection of Wastewater 12.4 Effluent Disposal, Reclaimed Water Reuse & Permit Compliance
13 Chapter 13: Residuals Management & Sludge Processing
13.1 Sludge Thickening & Digestion Processes 13.2 Sludge Dewatering Technologies & Drying Beds 13.3 EPA Part 503 Biosolids Rules & Arizona Beneficial Use
14 Chapter 14: Wastewater Plant Equipment Operation & Maintenance
14.1 Preliminary & Primary Treatment Equipment 14.2 Aeration Systems, Blowers, Diffusers & Dissolved Oxygen Control 14.3 Wastewater Pumps, Mixers & Chemical Dosing Equipment 14.4 Electrical Systems, Online Analyzers & Auxiliary Power
15 Chapter 15: Water Distribution Infrastructure & Hydraulic Management
15.1 Water Main Materials, Fittings & Appurtenances 15.2 Water Storage, Pressure Management & Water Age 15.3 Cross-Connection Control & Backflow Prevention 15.4 Main Maintenance, Unidirectional Flushing & Leak Detection 15.5 Distribution Hydraulics, Head Loss & C-Factor 15.6 System Mapping, GIS, Plans & Distribution SCADA
16 Chapter 16: Water Main Installation, Repair & Disinfection
16.1 Main & Service Line Installation, Tapping & Thrust Restraint 16.2 New Construction Inspection, Pressure Testing & Utility Locating 16.3 Disinfection of Mains, Storage Facilities & Repaired Components 16.4 Booster Stations, Meters & Storage Facility Inspection
17 Chapter 17: Distribution Water Quality Management & Field Testing
17.1 Distribution Chemical Feed, Dosage Adjustment & Booster Chlorination 17.2 Distribution Sampling Programs & Field Analyses 17.3 Chemical Transport, Storage & Handling in Distribution Operations 17.4 Interpreting Water Quality Data, Complaints & Nitrification Control
18 Chapter 18: Wastewater Collection Systems & Lift Stations
18.1 Gravity Sewer Design, Piping Materials & Manholes 18.2 Inflow & Infiltration (I&I) Assessment & Pipeline Rehabilitation 18.3 Wastewater Lift Stations, Pump Types & Force Mains 18.4 Hydrogen Sulfide Corrosion, Odor Control & Line Cleaning 18.5 Excavation, Heavy Equipment & Surface Restoration
19 Chapter 19: Collection System Cleaning, Inspection & Rehabilitation
19.1 Hydraulic Cleaning, Rodding & Blockage Removal 19.2 CCTV Inspection, Condition Assessment & FOG Control 19.3 Trenchless Rehabilitation: CIPP, Pipe Bursting & Lining 19.4 SSO Response, Flow Monitoring & Capacity Assurance
20 Chapter 20: Laboratory Testing, Quality Control & Monitoring
20.1 Drinking Water Analytical Methods & Compliance Testing 20.2 Wastewater Laboratory Analytics & Process Control Tests 20.3 Sampling Protocols, Chain of Custody & Laboratory QA/QC 20.4 Emerging Contaminants, PFAS & Advanced Analytical Methods
21 Chapter 21: Utility Safety Programs & Emergency Preparedness
21.1 Lockout/Tagout, Electrical Safety & Arc Flash 21.2 Personal Protective Equipment, Fall Protection & Bloodborne Pathogens 21.3 Traffic Control & Work Zone Safety 21.4 Emergency Response Planning & Disaster Recovery 21.5 Heat Illness Prevention, Respiratory Protection & Hearing Conservation
22 Chapter 22: Security, Administration & Utility Management
22.1 Facility Security, Vulnerability Assessment & Cybersecurity 22.2 Recordkeeping, Standard Operating Procedures & Regulatory Reporting 22.3 Budgets, Procurement, Cost Analysis & Capital Improvement Planning 22.4 Asset Management, Energy Optimization & Water Loss Control 22.5 Supervision, Training, Customer Service & Public Communication
23 Chapter 23: Applied Operator Mathematics, Pumping Hydraulics & Utility Safety
23.1 Chemical Feed Calculations & Dosage Problem Solving 23.2 Geometric Volumes, Hydraulic Loading & Detention Time Math 23.3 Pumping Mechanics, System Head & Horsepower Calculations 23.4 Plant Safety: Confined Spaces, Chemical Hazards & OSHA Standards 23.5 Unit Conversions & Using the Supplied Formula/Conversion Table 23.6 Percent Removal, Process Efficiency & Solution Blending
9.2 Primary Clarification Design & Settling Mechanics
Key Takeaways Explain This Topic AI
Primary clarification achieves the physical gravity separation of settleable organic solids, removing 50% to 70% of Total Suspended Solids (TSS) and 25% to 40% of Biochemical Oxygen Demand (BOD5) from raw wastewater.
Primary sedimentation operates within the Type 2 Flocculent Settling regime, where dilute organic particles collide, coalesce, and increase in mass and effective diameter, causing settling velocity to accelerate with depth.
Surface scum—consisting of fats, oils, grease (FOG), wax, and floatables—is captured by surface skimmer wiper arms, pushed over scum beach plates into rotating slotted troughs, and baffled from discharging into downstream secondary treatment.
Under warm Arizona conditions, primary sludge must be pumped frequently to prevent anaerobic septicity, gasification (where methane and CO2 buoy sludge clumps to the surface as rising sludge), and intense hydrogen sulfide odor releases.
Core primary clarifier control metrics include Hydraulic Detention Time (1.5 to 2.5 hours), Surface Overflow Rate (800 to 1,200 gpd/sq ft), Weir Overflow Rate (10,000 to 15,000 gpd/linear ft), and Solids Loading Rate.
Last updated: September 2026
9.2 Primary Clarification Design & Settling Mechanics
Important
Process Performance Benchmarks : Primary sedimentation basins serve as the primary workhorse for physical solids separation. When properly designed and operated, primary clarifiers consistently remove 50% to 70% of influent Total Suspended Solids (TSS) and 25% to 40% of influent 5-day Biochemical Oxygen Demand ( B O D 5 BOD_5 BO D 5 ) . Removing this heavy organic load physically via gravity settling drastically reduces the electrical power required by secondary biological aeration blowers, saving utilities substantial energy costs.
Following preliminary screening and grit extraction, wastewater enters the primary clarification stage. Here, fluid velocity is drastically reduced, allowing quiescent conditions under which settleable organic solids sink to the tank bottom as raw primary sludge , while buoyant grease, oils, and floatables rise to the surface as scum .
Sedimentation Theory: The Four Settling Regimes
Sedimentation in environmental engineering is governed by particle concentration and particle-to-particle physical interactions, categorized into four distinct settling types: +-----------------------------------------------------------------------------------+
- | Four Sedimentation Regimes |
- +-----------------------------------------------------------------------------------+
- | Type 1: Discrete Settling | Particles settle individually at constant |
- | (Stokes' Law) | velocity; no particle interaction (Grit). |
- |----------------------------------+------------------------------------------------|
- | Type 2: Flocculent Settling | Particles coalesce and gain mass as they sink; |
- | (Primary Clarifiers) | settling velocity accelerates with depth. |
- |----------------------------------+------------------------------------------------|
- | Type 3: Zone / Hindered Settling | Concentrated flocs settle as a unified mass or |
- | (Secondary Clarifiers) | blanket; creates distinct clear-water interface|
- |----------------------------------+------------------------------------------------|
- | Type 4: Compression Settling | Dense solids matrix physically compresses |
- | (Gravity Sludge Thickeners) | under the weight of overlying solids. |
- +-----------------------------------------------------------------------------------+
- Type 1: Discrete Particle Settling
Particles settle independently without altering size, shape, or density. Terminal settling velocity ( v s v_s v s ) is defined by Stokes' Law : v s = g ( ρ p − ρ ) d 2 18 μ v_s = \frac{g (\rho_p - \rho) d^2}{18 \mu} v s = 18 μ g ( ρ p − ρ ) d 2
(where g g g is gravitational acceleration, ρ p \rho_p ρ p is particle density, ρ \rho ρ is fluid density, d d d is particle diameter, and μ \mu μ is dynamic viscosity) . Stokes' Law applies to heavy, non-cohesive inorganic sand in grit chambers and plain sand sedimentation.
Type 2: Flocculent Settling
Applies to dilute suspensions of organic particles (such as raw sewage solids entering a primary clarifier). As particles settle at different velocities, they collide and aggregate into larger flocs. Because settling velocity is proportional to the square of particle diameter ( v s ∝ d 2 v_s \propto d^2 v s ∝ d 2 ), coalescence increases particle mass and settling velocity as the floc descends through the water column. Consequently, Type 2 removal efficiency depends on both surface overflow rate and tank depth / detention time .
Type 3: Zone (Hindered) Settling
Occurs in higher solids concentrations (such as activated sludge in secondary clarifiers, typically 1,500 to 4,000 mg/L). Inter-particle forces hinder adjacent particle movement. The solids settle en masse as a unified blanket, producing a distinct liquid-solids interface separating clarified water above from the settling blanket below.
Type 4: Compression Settling
Occurs at the bottom of deep sludge blankets and gravity thickeners where solids concentration is so high that particles physically rest upon one another. Further settling occurs only as water is mechanically squeezed out from the matrix under the compressive weight of the overlying solids layer.
Clarifier Configurations & Mechanical Components
Primary sedimentation tanks are constructed in two predominant geometric configurations: circular center-feed tanks and rectangular horizontal-flow basins. Circular Center-Feed Clarifier
- Drive Motor & Gearbox
- ┌───┴───┐
- Walkway ═════╡ ╞═════════════════════════════════ Walkway
- │ │ │
- Influent Pipe ────►│ │ │ Clarified Effluent Overflow (V-Notch Weirs)
- │ ▼ │ ▲ ▲
- ┌─────┴───────┴─────┐ │ Scum Baffle │ Scum Baffle
- │ Center Feedwell │ ┌┴┐ ┌┴┐
- │ (Energy Dissip.) │ │ │ │ │
- └─────┬───────┬─────┘ └┬┘ └┬┘
- │ │ │ │
- Radial Flow ◄─┘ └─► Radial Flow │
- ════════════════════════════════════════════════════════╪════════════
- ╲ │ ╱
- ╲ Rotating Scraper Arm & Neoprene Blades ▼ ╱
- ╲───────────────────────► Sludge Hopper ╱
- ╲ ┌───┐ ╱
- ╲ │ │ ╱
- ╲════════════════════════════════════════════╡ ╞═══════╱
- │ │
- ▼ ▼
- Primary Sludge to Pump
- 1. Circular Center-Feed Clarifiers
Influent Distribution : Raw wastewater enters through a central vertical column pipe and discharges into an influent center feedwell (flocculation / energy-dissipation well). The feedwell slows high-velocity influent, dissipates kinetic energy, and directs flow downward and radially outward toward the perimeter.
Sludge Collection Mechanism : A heavy-duty bridge-mounted motor and reduction gearbox drives a central vertical shaft equipped with two or four rotating rake arms . Sweeping the floor at a gentle speed (typically 0.02 to 0.05 RPM , with rake tip speeds <10 ft/min to prevent scouring), angled steel scrapers with neoprene squeegees push settled sludge along the sloped floor (typically sloped 1 inch per foot) inward toward a central sludge hopper.
Effluent Discharge : Clarified effluent flows over peripheral V-notch (90°) weir plates mounted on effluent collection troughs (launders). Adjustable weir bolts allow leveling to ensure uniform flow distribution around the entire perimeter.
2. Rectangular Horizontal-Flow Clarifiers
Hydraulic Flow : Wastewater enters through distribution target baffles across the tank width, traveling horizontally down the length of a long rectangular channel (length-to-width ratios typically 3:1 to 5:1 , with depths of 10 to 14 feet).
Chain-and-Flight Scrapers : Continuous non-metallic polymeric chains equipped with fiberglass scraper flights travel along the tank floor toward the influent end, sweeping settled sludge into a transverse hopper. As the chains loop up toward the surface, the return flights travel along the liquid surface toward the effluent end, pushing floating scum toward a scum beach and collection trough.
Scum Collection & Removal Mechanisms
Scum comprises floatable material with a specific gravity less than 1.0, including fats, oils, and grease (FOG), cooking lard, petroleum hydrocarbons, plastic bottle caps, matchsticks, and colloidal foam.
Mechanical Components
Surface Skimmer Arm : In circular clarifiers, a surface skimmer blade is attached to the rotating scraper bridge. As the bridge rotates, the arm sweeps surface floatables radially outward toward the perimeter.
Scum Baffle : A continuous metal or fiberglass plate mounted 6 to 12 inches inboard of the effluent weir , extending 2 to 4 inches above the water line and submerged 6 to 12 inches below the surface . The baffle physically blocks floating grease from spilling over the effluent weir into secondary biological aeration basins.
Scum Beach Plate & Slotted Pipe : As the skimmer arm rotates, it sweeps accumulated scum up an inclined ramp ( scum beach plate ) into a rotating slotted scum trough (or spring-loaded wiper box). The slotted pipe can be rotated manually or actuated automatically by mechanical linkages as the skimmer arm passes.
Scum Pumping : Scum drains into an adjacent scum collection sump equipped with specialized positive displacement pumps (progressive cavity or recessed-impeller torque-flow vortex pumps) that convey the high-viscosity, grease-laden material directly to anaerobic digesters or dedicated grease handling containers.
Primary Sludge Withdrawal & Operational Hazards
Raw primary sludge is a heavy, gray-brown, fibrous slurry with an offensive fecal odor, containing 2.0% to 6.0% total dry solids (TS) (20,000 to 60,000 mg/L) and a specific gravity of 1.02 to 1.05 .
Sludge Pumping Equipment
Progressive Cavity (PC) Pumps : Positive displacement pumps comprising a helical chrome-plated steel rotor rotating inside a synthetic elastomer stator. PC pumps deliver smooth, pulse-free flow against high heads, ideal for viscous sludges. Critical constraint : Must never run dry; run-dry conditions cause friction that melts the elastomer stator within minutes.
Positive Displacement Diaphragm / Plunger Pumps : Heavy-duty mechanical plunger pumps handle heavy, chunky solids and rags, providing positive suction lift.
Torque-Flow Vortex Pumps : Incorporate a recessed impeller completely retracted from the pump volute casing. Rotation creates a vortex current that sweeps sludge and fibrous rags through the casing without contacting the impeller, eliminating rag fouling.
Pumping Control Automation
Programmed Timers : Intermittent pumping cycles (e.g., running 5 to 15 minutes every 1 to 2 hours) balance sludge removal against incoming solids.
In-line Sludge Density Meters : High-frequency ultrasonic or microwave density meters mounted in the sludge suction line continuously monitor solids concentration. When the solids content drops below a pre-set threshold (e.g., <2.5% or 3.0% solids), the pump automatically shuts off to prevent pumping excess water.
Optical / Ultrasonic Blanket Detectors : Submerged sensors monitor sludge blanket depth in the hopper, triggering pumping when the blanket exceeds design limits.
- Operational Hazards: Under-Pumping vs. Over-Pumping Primary Sludge Pumping Hazards
- │
- ┌────────────────────────────────┴────────────────────────────────┐
- ▼ ▼
- UNDER-PUMPING (Infrequent) OVER-PUMPING (Excessive)
- ───────────────────────── ────────────────────────
- Blanket depth rises excessively (>2-3 ft) • Pumping thin sludge (<2% solids)
- Anaerobic septicity in hot Arizona water • 'Rat-holing' / 'Coning' water
- Gasification: Methane / CO2 bubbles buoy • Diluting anaerobic digesters
- sludge clumps to surface ('Rising Sludge') • Wasting digester heat and volume
- Massive H2S odor releases & crown corrosion • High volumetric hydraulic overload
Pumping Thin Sludge (Over-Pumping) : If pumps run too long or too frequently, fluid velocity pulls clarified water down through the center of the sludge blanket—a hydraulic phenomenon known as "rat-holing" or "coning" . The pump pulls thin sludge (<1.5% solids) or pure water. Sending excess water to anaerobic digesters cools the digester, wastes heating gas, reduces hydraulic retention time, and destabilizes methanogenesis.
Pumping Too Infrequently (Under-Pumping) : If sludge remains in the hopper too long—particularly under Arizona summer water temperatures (>28°C / 82°F)—sludge rapidly exhausts any residual dissolved oxygen and undergoes anaerobic acidogenesis and fermentation :
Gasification & Rising Sludge : Anaerobic microorganisms generate nitrogen, methane ( C H 4 CH_4 C H 4 ), and carbon dioxide ( C O 2 CO_2 C O 2 ) gases. Microscopic gas bubbles become entrapped within the sludge matrix, lowering its bulk density. Large, foul-smelling black clumps of septic sludge break free from the floor and float to the surface ( "rising sludge" ).
Severe Odors & Corrosion : Sulfate-reducing bacteria produce hydrogen sulfide ( H 2 S H_2S H 2 S ), releasing rotten-egg odors and attacking concrete launder walls.
Effluent Quality Deterioration : Rising sludge mats disintegrate and wash over the effluent weirs, causing catastrophic spikes in effluent TSS and B O D 5 BOD_5 BO D 5 that hydraulically and organically choke downstream secondary biological aeration basins.
Primary Clarifier Control Calculations
Certified operators evaluate primary clarifier performance through four fundamental hydraulic and mass loading equations:
1. Hydraulic Detention Time (DT)
The average theoretical residence time wastewater resides inside the clarification basin: D T ( hours ) = Tank Volume (gallons) × 24 hours/day Daily Flow Rate (gpd) = Tank Volume (gallons) Flow Rate (gph) DT (\text{hours}) = \frac{\text{Tank Volume (gallons)} \times 24\text{ hours/day}}{\text{Daily Flow Rate (gpd)}} = \frac{\text{Tank Volume (gallons)}}{\text{Flow Rate (gph)}} D T ( hours ) = Daily Flow Rate (gpd) Tank Volume (gallons) × 24 hours/day = Flow Rate (gph) Tank Volume (gallons)
Design Criteria : Typical primary clarifier detention time ranges from 1.5 to 2.5 hours (optimal ~2.0 hours). If DT < 1.5 hours, particles do not have adequate time to settle. If DT > 3.0 hours under warm weather conditions, sludge blankets turn septic.
2. Surface Overflow Rate (SOR / Hydraulic Loading Rate)
The volumetric flow applied per unit of clarifier surface area per day: S O R ( gpd/sq ft ) = Daily Flow Rate (gpd) Clarifier Surface Area (sq ft) SOR (\text{gpd/sq ft}) = \frac{\text{Daily Flow Rate (gpd)}}{\text{Clarifier Surface Area (sq ft)}} SOR ( gpd/sq ft ) = Clarifier Surface Area (sq ft) Daily Flow Rate (gpd)
Design Criteria : Normal domestic dry-weather SOR ranges from 800 to 1,200 gpd/sq ft . During peak wet-weather storm events, SOR should not exceed 1,500 to 2,000 gpd/sq ft to prevent hydraulic scouring of settling flocs.
3. Weir Overflow Rate (WOR)
The volume of clarified effluent passing over each linear foot of effluent weir plate per day: W O R ( gpd/linear ft ) = Daily Flow Rate (gpd) Total Active Weir Length (feet) WOR (\text{gpd/linear ft}) = \frac{\text{Daily Flow Rate (gpd)}}{\text{Total Active Weir Length (feet)}} W OR ( gpd/linear ft ) = Total Active Weir Length (feet) Daily Flow Rate (gpd)
Design Criteria : Typical design standard is 10,000 to 15,000 gpd/linear ft . Excessive WOR creates high local exit velocities near the weirs that draw up settling solids from the sludge blanket into the effluent trough.
4. Solids Loading Rate (SLR)
The total dry mass of suspended solids applied per square foot of clarifier floor area per day: S L R ( lbs TSS/day/sq ft ) = TSS Loading (lbs/day) Clarifier Surface Area (sq ft) SLR (\text{lbs TSS/day/sq ft}) = \frac{\text{TSS Loading (lbs/day)}}{\text{Clarifier Surface Area (sq ft)}} S L R ( lbs TSS/day/sq ft ) = Clarifier Surface Area (sq ft) TSS Loading (lbs/day) TSS Loading (lbs/day) = Q ( MGD ) × TSS (mg/L) × 8.34 \text{TSS Loading (lbs/day)} = Q (\text{MGD}) \times \text{TSS (mg/L)} \times 8.34 TSS Loading (lbs/day) = Q ( MGD ) × TSS (mg/L) × 8.34
- Step-by-Step Practical Problem: Primary Clarification Performance
- Operational Scenario
A municipal wastewater reclamation facility in Maricopa County operates two identical circular center-feed primary clarifiers operating in parallel. The facility records the following operational parameters:
- Total Plant Influent Flow ( Q Q Q ): 6.0 MGD (split equally: 3.0 MGD per clarifier )
- Clarifier Dimensions: Diameter = 80.0 feet ; Side Water Depth (SWD) = 12.0 feet
- Peripheral Effluent Weir: Single continuous circumferential weir located along the outer wall
- Influent Raw TSS: 250 mg/L
- Primary Effluent TSS: 85 mg/L
- Primary Sludge Pumping Concentration: 4.0% dry solids (Specific Gravity = 1.02)
Step 1: Calculate Surface Area & Volume per Clarifier Radius ( r ) = 80.0 ft 2 = 40.0 ft \text{Radius } (r) = \frac{80.0\text{ ft}}{2} = 40.0\text{ ft} Radius ( r ) = 2 80.0 ft = 40.0 ft Surface Area ( A ) = π × r 2 = 3.14159 × ( 40.0 ft ) 2 = 5 , 026.55 sq ft \text{Surface Area } (A) = \pi \times r^2 = 3.14159 \times (40.0\text{ ft})^2 = 5,026.55\text{ sq ft} Surface Area ( A ) = π × r 2 = 3.14159 × ( 40.0 ft ) 2 = 5 , 026.55 sq ft Volume ( V ) = A × SWD × 7.48 gal/cu ft = 5 , 026.55 × 12.0 ft × 7.48 = 451 , 183 gallons \text{Volume } (V) = A \times \text{SWD} \times 7.48\text{ gal/cu ft} = 5,026.55 \times 12.0\text{ ft} \times 7.48 = 451,183\text{ gallons} Volume ( V ) = A × SWD × 7.48 gal/cu ft = 5 , 026.55 × 12.0 ft × 7.48 = 451 , 183 gallons
Step 2: Calculate Hydraulic Detention Time (DT) Flow per clarifier = 3.0 MGD = 3 , 000 , 000 gpd \text{Flow per clarifier} = 3.0\text{ MGD} = 3,000,000\text{ gpd} Flow per clarifier = 3.0 MGD = 3 , 000 , 000 gpd D T = 451 , 183 gallons × 24 hr/day 3 , 000 , 000 gpd = 10 , 828 , 392 3 , 000 , 000 = 3.61 hours DT = \frac{451,183\text{ gallons} \times 24\text{ hr/day}}{3,000,000\text{ gpd}} = \frac{10,828,392}{3,000,000} = 3.61\text{ hours} D T = 3 , 000 , 000 gpd 451 , 183 gallons × 24 hr/day = 3 , 000 , 000 10 , 828 , 392 = 3.61 hours
Step 3: Calculate Surface Overflow Rate (SOR) S O R = 3 , 000 , 000 gpd 5 , 026.55 sq ft = 596.8 gpd/sq ft ≈ 597 gpd/sq ft SOR = \frac{3,000,000\text{ gpd}}{5,026.55\text{ sq ft}} = 596.8\text{ gpd/sq ft} \approx 597\text{ gpd/sq ft} SOR = 5 , 026.55 sq ft 3 , 000 , 000 gpd = 596.8 gpd/sq ft ≈ 597 gpd/sq ft
(Note: 597 gpd/sq ft is comfortably below the 800–1,200 gpd/sq ft threshold, ensuring conservative hydraulic loading) .
Step 4: Calculate Weir Overflow Rate (WOR) Weir Length = Circumference = π × Diameter = 3.14159 × 80.0 ft = 251.33 linear feet \text{Weir Length} = \text{Circumference} = \pi \times \text{Diameter} = 3.14159 \times 80.0\text{ ft} = 251.33\text{ linear feet} Weir Length = Circumference = π × Diameter = 3.14159 × 80.0 ft = 251.33 linear feet W O R = 3 , 000 , 000 gpd 251.33 linear feet = 11 , 936.5 gpd/linear ft ≈ 11 , 937 gpd/linear ft WOR = \frac{3,000,000\text{ gpd}}{251.33\text{ linear feet}} = 11,936.5\text{ gpd/linear ft} \approx 11,937\text{ gpd/linear ft} W OR = 251.33 linear feet 3 , 000 , 000 gpd = 11 , 936.5 gpd/linear ft ≈ 11 , 937 gpd/linear ft
(Note: 11,937 gpd/linear ft complies perfectly with the 10,000–15,000 gpd/linear ft design range) .
Step 5: Calculate TSS Removal Efficiency & Sludge Production TSS Removal Efficiency (%) = Influent TSS − Effluent TSS Influent TSS × 100 = 250 − 85 250 × 100 = 66.0 % \text{TSS Removal Efficiency (\%)} = \frac{\text{Influent TSS} - \text{Effluent TSS}}{\text{Influent TSS}} \times 100 = \frac{250 - 85}{250} \times 100 = 66.0\% TSS Removal Efficiency (%) = Influent TSS Influent TSS − Effluent TSS × 100 = 250 250 − 85 × 100 = 66.0%
(Achieves the 50% to 70% primary performance benchmark) . Total TSS Mass Removed (lbs/day) = Q ( MGD ) × ( Raw TSS − Effluent TSS ) × 8.34 \text{Total TSS Mass Removed (lbs/day)} = Q (\text{MGD}) \times (\text{Raw TSS} - \text{Effluent TSS}) \times 8.34 Total TSS Mass Removed (lbs/day) = Q ( MGD ) × ( Raw TSS − Effluent TSS ) × 8.34 TSS Removed = 3.0 × ( 250 − 85 ) × 8.34 = 3.0 × 165 × 8.34 = 4 , 128.3 lbs dry solids/day \text{TSS Removed} = 3.0 \times (250 - 85) \times 8.34 = 3.0 \times 165 \times 8.34 = 4,128.3\text{ lbs dry solids/day} TSS Removed = 3.0 × ( 250 − 85 ) × 8.34 = 3.0 × 165 × 8.34 = 4 , 128.3 lbs dry solids/day Primary Sludge Pumping Volume (gpd) = Dry Solids (lbs/day) Fraction Solids × 8.34 × Specific Gravity \text{Primary Sludge Pumping Volume (gpd)} = \frac{\text{Dry Solids (lbs/day)}}{\text{Fraction Solids} \times 8.34 \times \text{Specific Gravity}} Primary Sludge Pumping Volume (gpd) = Fraction Solids × 8.34 × Specific Gravity Dry Solids (lbs/day) Sludge Volume = 4 , 128.3 lbs/day 0.04 × 8.34 × 1.02 = 4 , 128.3 0.34027 = 12 , 132 gallons of sludge pumped per day \text{Sludge Volume} = \frac{4,128.3\text{ lbs/day}}{0.04 \times 8.34 \times 1.02} = \frac{4,128.3}{0.34027} = 12,132\text{ gallons of sludge pumped per day} Sludge Volume = 0.04 × 8.34 × 1.02 4 , 128.3 lbs/day = 0.34027 4 , 128.3 = 12 , 132 gallons of sludge pumped per day