1 Chapter 1: CHST Exam Orientation and Official Source Control

Official Sources and Credential Purpose Eligibility, Application, Fees, and Character Review Exam Format, Scoring, Beta Questions, and Blueprint Pearson VUE Scheduling, Test Day, Results, and Retakes Blueprint-Based Study Plan and Readiness

2 Chapter 2: Hazard and Risk Identification Methods, JHA, and Controls

Hierarchy of Controls and Construction Risk Logic Job Hazard Analysis and Pre-Task Planning Risk Ranking, Severity, Frequency, and Corrective Action Safety Through Design and Construction Means and Methods PPE Selection, Limitations, and Basic Monitoring Instruments Multi-Trade Coordination, Simultaneous Operations, and Interface Risk Field Observation, Documentation, and Control Verification

3 Chapter 3: High-Hazard Construction Operations I - Fall, Electrical, Excavation, Confined Space, Hot Work, Tools, and Concrete

Working at Heights: Ladders, Scaffolds, and Leading Edge Exposures Fall Protection: Arrest, Restraint, and Rescue Planning Excavation and Trenching: Soil, Protection, and Access/Egress Electrical Hazards: Temporary Power, GFCI, and LOTO Awareness Confined Space Recognition, Atmospheric Testing, and Entry Controls Hot Work: Fire Watch, Combustibles, and Permit Controls Hand and Power Tools, Powder-Actuated Tools, and Concrete Work

4 Chapter 4: High-Hazard Construction Operations II - Struck-By, Equipment, Hoisting, Rigging, Cranes, Material Handling, and Storage

Struck-By, Caught-Between, and Line-of-Fire Controls Mechanized Equipment, Mobile Equipment, and Traffic Control Hoisting, Rigging, Sling Inspection, and Load Control Crane Operations, Critical Lifts, Signaling, and Exclusion Zones Material Handling, Storage, Stacking, and Housekeeping Concrete Placement, Formwork, Rebar, and Impalement Controls Simultaneous Operations, Sequencing, and Stop-Work Decisions

5 Chapter 5: Construction Health, Environmental, Chemical, and Ergonomic Exposure Controls

Silica, Asbestos, Lead, Heavy Metals, and Dust Controls Noise, Vibration, Radiation, and Impact Exposure Control Chemical Exposure, GHS, SDS, and HazCom Field Use Heat, Cold, Extreme Climate, and Biological Hazard Controls Ergonomics, Manual Material Handling, and Work Practice Design Exposure Monitoring, PPE Limitations, and Medical Referral Triggers

6 Chapter 6: Emergency Preparedness, Incident Investigation, and Response

Emergency Action Plans, Site Mitigation, and Evacuation Fire Protection, Prevention, Hot Work, and Alarm Response Environmental Contamination, Spill Response, and Notifications Incident Command, Crisis Management, and Emergency Equipment First Aid, Medical Needs, Bloodborne Pathogens, and Universal Precautions Incident Investigation, Near Misses, Root Cause, and Corrective Action Drills, After-Action Reviews, and Return to Operations

7 Chapter 7: Safety Program Development, Implementation, and Sustainment

Site-Specific Safety Plans and Relevant Program Selection Applying Standards, Regulatory Authority, and Role Boundaries Inspections, Audits, Observations, and Corrective Action Tracking Equipment Manuals, Manufacturer Directives, and Field Compliance Risk Management, Data Gathering, Recordkeeping, and Document Control Incident Causation, Post-Incident Reporting, and Follow-Up Trends, Leading Indicators, and Program Sustainment

8 Chapter 8: Leadership, Communication, Training, and Total Worker Health

Safety Leadership, Credibility, and Field Influence Communication Strategy, Crew Briefings, and Conflict Management Training Needs, Task Analysis, and Adult Learning Delivery Toolbox Talks, Competency Verification, and Documentation Consulting Manufacturers, Suppliers, and Subject Matter Experts Confidentiality, Ethics, Document Control, and Current Information Total Worker Health, At-Risk Behavior, and Risk Reduction Activities

9 Chapter 9: Mixed CHST Construction Case Labs

Fall Protection, Scaffold, and Rescue Case Lab Excavation, Confined Space, and Atmospheric Hazard Case Lab Crane, Rigging, Equipment, and Struck-By Case Lab Hot Work, Fire, and HazCom Case Lab Silica, Noise, Heat, and Health Exposure Case Lab Incident Investigation, Program Failure, and Corrective Action Case Lab Superintendent Meeting, Training, and Stop-Work Case Lab

10 Chapter 10: Standards, References, Ethics, and Field Application

OSHA 1926 Navigation and Construction Standard Application Competent Person, Qualified Person, and Authority Boundaries Consensus Standards, Manufacturer Instructions, and Equipment Manuals BCSP Code of Ethics, Confidentiality, and Professional Conduct Exam-Style Reference Use and Best Answer Strategy

11 Chapter 11: Final Review, High-Yield Tables, and CHST Exam-Day Readiness

Blueprint Quick Reference and Domain Triage High-Yield Construction Hazard Control Tables Emergency Program Leadership and Documentation Review Final Week Practice Plan, Error Log, and Pacing Final 48 Hours, Pearson VUE Test Day, and Retake Planning

Excavation and Trenching: Soil, Protection, and Access/Egress

Key Takeaways Explain This Topic AI

Trenches 5 feet or deeper require a protective system; at 20 feet or deeper the system must be engineered by a registered professional engineer.

A competent person classifies soil (Type A, B, C, or stable rock) and inspects daily, before each shift, and after every hazard-increasing event such as rain.

Egress (ladder, ramp, or stairway) must be within 25 feet of lateral travel in trenches 4 feet or deeper.

Spoil and equipment must be kept at least 2 feet back from the edge to limit surcharge load.

Atmospheric testing is required before entry into excavations greater than 4 feet deep where a hazardous atmosphere could reasonably be expected, and water accumulation must be controlled.

Last updated: October 2026

Excavation and Trenching Field Control

Trenching is unforgiving: a cubic yard of soil weighs roughly 3,000 pounds (about the weight of a small car), and a collapse can bury and crush a worker before they can move. OSHA 29 CFR 1926 Subpart P governs this work, and the CHST exam expects exact triggers. Treat every entry as a decision point: has the competent person evaluated the current condition, and does the protective system still match the excavation?

Depth Triggers and the Competent Person

The key numbers: a protective system is required at 5 feet of depth or greater unless the excavation is in stable rock; below 5 feet a competent person may waive it after examining the soil. At 20 feet or greater the protective system must be designed by a registered professional engineer or based on RPE-approved tabulated data. A competent person is one who can identify existing and predictable hazards and has authority to take prompt corrective action.

That role inspects before work, as needed during the shift, and after any hazard-increasing event: rain, vibration, exposed utilities, a wider bell hole, or a relocated excavator.

Field Condition Why It Matters CHST Prompt

Water in trench Reduces stability, drowning risk Is water controlled before entry?

Spoil at edge Adds surcharge load Is spoil set back at least 2 ft?

Nearby traffic / equipment Adds vibration and impact Are barricades and a spotter in place?

Exposed utilities Energy and engulfment hazards Has the utility owner / locate been followed?

Soil Classification and Protective Systems

OSHA classifies soil as stable rock, Type A (most cohesive, unconfined compressive strength of 1.5 tons per square foot or more, such as clay), Type B (medium, 0.5 to 1.5 tsf), and Type C (least stable, 0.5 tsf or less, including submerged or flowing soil). Maximum allowable slopes vary accordingly: Type A is 3/4:1 (53 degrees), Type B is 1:1 (45 degrees), and Type C is 1.5:1 (34 degrees). Previously disturbed soil cannot be classified higher than Type B, and most construction excavations involve disturbed or variable soil, so assumptions should be conservative.

Protective options are sloping, benching (not allowed in Type C), shoring, shielding (trench boxes), or engineered systems. A trench box protects workers inside the shield but does not prevent a cave-in around it, and workers must never be between the box and the trench wall during movement. A shield used deeper than rated, in the wrong soil, or with missing spreaders is not protective.

Access, Egress, and Edge Loading

In trenches 4 feet deep or greater , a stairway, ladder, ramp, or other safe means of egress must be located so workers are never more than 25 feet of lateral travel from it. A single ladder at one end of a long trench fails this test. The area around the trench is part of the hazard: spoil, pipe, plates, excavators, and ready-mix trucks overload the edge. Keep spoil and materials at least 2 feet from the edge , barricade against mobile equipment, and assign a spotter. Workers in the trench can also be struck by rocks, tools, plates, or buckets dropped from above.

Utilities, Atmospheres, and Water

Utility locating (call 811) must occur before digging, but marks are approximate; hand digging, vacuum excavation, or potholing may be needed near expected lines, and exposed utilities must be supported. Some excavations create atmospheric hazards near landfills, sewers, tanks, or contaminated soil; where oxygen deficiency (below 19.5% oxygen) or a hazardous atmosphere exists or could reasonably be expected, the atmosphere must be tested before workers enter excavations greater than 4 feet deep, and precautions such as ventilation must keep flammable gas below 20% of its lower flammable limit (29 CFR 1926.651(g)).

Water accumulation undermines walls, hides bottom conditions, and creates engulfment or drowning risk, so entry stops until water or atmosphere is controlled.

Sloping, Benching, and the Simple Slope Option

When space allows, sloping or benching can replace shoring or shielding. The CHST should know the maximum allowable slope by soil type : Type A laid back at 3/4 horizontal to 1 vertical (53 degrees), Type B at 1:1 (45 degrees), and Type C at 1.5:1 (34 degrees). Benching is permitted in Type A and Type B but never in Type C , because cohesionless soil will slough off vertical bench faces.

A frequently tested simplification is the simple slope option for excavations 20 feet deep or less : a 1.5:1 slope (34 degrees) is conservative enough to be used across A, B, and C without separate analysis, which is why crews default to it when soil is uncertain. Layered soils are classified by the least stable layer present.

Daily Inspections and Emergency Response

The competent person's inspections are not a one-time morning event. OSHA requires inspection prior to the start of work, as needed throughout the shift, and after every rainstorm or other hazard-increasing occurrence ; if the competent person finds evidence of a possible cave-in, failure of protective systems, hazardous atmosphere, or other hazard, exposed workers are removed until the hazard is corrected.

The CHST should also confirm emergency rescue equipment (such as breathing apparatus, a basket stretcher, or a lifeline) is available where a hazardous atmosphere exists or could develop, and that a trained attendant or standby is present. Trench collapse rescue is extremely dangerous because secondary collapses bury would-be rescuers, so untrained workers must never jump in to dig out a buried colleague by hand.

The CHST's practical test: if a worker enters, what prevents collapse, what prevents struck-by exposure, what provides escape within 25 feet, and what change triggers immediate removal? When those answers are vague, the trench is not ready.