Study guide

14.1 Stationing and Stake Marking

California Civil Engineering Surveying CES

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts 1.2 California Civil PE Path and Scheduling 1.3 Test Day, References, and Calculators

2 Chapter 2: Civil Engineer Surveying Authority

2.1 Professional Engineers Act: Engineering Surveying 2.2 Civil Engineer vs Professional Land Surveyor Limits 2.3 Board Rules, Accuracy Statements, and Map Act Context

3 Chapter 3: Survey Types and Control

3.1 Control Surveys: Purpose and Procedures 3.2 Alignment and Route Surveys 3.3 Topographic Surveys: Aerial, Surface, and Utilities

4 Chapter 4: Data Collection Methods, Accuracy, and GIS

4.1 Data Collection Methods: Leveling and LiDAR 4.2 Accuracy, Precision, and Error Types 4.3 GIS Applications for Civil Engineering Surveys

5 Chapter 5: Horizontal and Vertical Datums

5.1 Horizontal Datums and Assumed Systems 5.2 Vertical Datums and Benchmarks 5.3 Control Networks and Datum Selection

6 Chapter 6: Field Distances, Angles, and Conflicts

6.1 Measuring Horizontal Distances 6.2 Measuring Angles and Establishing Points 6.3 Construction Conflicts: Utilities, Structures, and Substructures

7 Chapter 7: Field Leveling and Equipment

7.1 Differential Leveling and Level Notes 7.2 Trigonometric Leveling 7.3 Surveying Equipment: Distance, Angle, Elevation

8 Chapter 8: Traverse and Rectangular Coordinates

8.1 Latitudes, Departures, and Coordinates 8.2 Error of Closure 8.3 Traverse Adjustment and Side Shots

9 Chapter 9: Angles, Distances, and Equipment Errors

9.1 Azimuths, Bearings, Backbearings, and Deflections 9.2 Horizontal, Slope, and Vertical Distances 9.3 Equipment Errors and Corrections

10 Chapter 10: Horizontal Curves

10.1 Circular Curve Elements 10.2 Horizontal Curve Stationing and Layout 10.3 Compound and Reverse Curves

11 Chapter 11: Vertical Curves and Line and Grade

11.1 Vertical Curve Geometry and Grades 11.2 High and Low Points and Intermediate Elevations 11.3 Line and Grade from Plans and Profiles

12 Chapter 12: Contours, Offsets, Areas, and Earthwork

12.1 Contours and Cross-Sections 12.2 Offsets and Vertical Interference 12.3 Areas, DMD, and Earthwork Volumes

13 Chapter 13: Mapping

13.1 Interpreting Maps and Plans 13.2 Interpolating Elevations and Plotting Features 13.3 Map Scales and Accuracy Standards

14 Chapter 14: Construction Staking and Cross-Sections

14.1 Stationing and Stake Marking 14.2 Hinge Points, Catch Points, and Grade Breaks 14.3 Slope Staking from Typical Sections

15 Chapter 15: Construction Alignment Layout

15.1 Staking Horizontal Alignment and Curves 15.2 Staking Vertical Alignment and Grades 15.3 Mixed Layout Problems and Exam Strategy

14.1 Stationing and Stake Marking

Key Takeaways Explain This Topic AI

A full station is 100 ft. A point 1,327.50 ft ahead of Sta 10+00 is Sta 23+27.50. The same distance from 0+00 is Sta 13+27.50.

Cut from a hub to grade is hub elevation minus grade elevation. Hub 428.62 ft and grade 426.15 ft is a 2.47 ft cut. Reverse the subtraction for a fill.

Station equation 12+50 BK = 15+00 AHD skips 250 ft of station numbers. Ground distance from 10+00 to 16+00 through that equation is 350 ft, not 600 ft.

On California highway work the hub (ginnie) is the measured reference; the lath is the marker. Caltrans Department grading stakes are yellow. Contractor working hubs driven to a plane are the bluetops.

Write station, offset (LT/RT), cut or fill, and the feature name (GRADE, OFFSET, FL, HP, CP). Slope, abutment-fill, and rough-grade marks are to 0.1 ft; most other references are to 0.01 ft.

Last updated: September 2026

14.1 Stationing and Stake Marking

Quick Answer: 1 station = 100 ft . 1,327.50 ft ahead of Sta 10+00 is Sta 23+27.50 . Cut = hub elevation − grade elevation : hub 428.62 ft , grade 426.15 ft → C 2.47 . A station equation gives the same ground point two names ( BK behind you, AHD ahead of you). The hub is the measured point; the lath carries the writing.

Domain V (Construction Surveying) is 20% of the 2022 CES test plan. This chapter is items A and B — staking procedures and critical cross-section points — which is half of that domain. Item C (setting points on horizontal and vertical curves) is Chapter 15. Under BPC 6731.1(a) , a California civil engineer may locate and establish alignment and elevation for the fixed works in BPC 6731 . That is this work. Right-of-way monuments that mark property lines remain land-surveying practice.

Station Language

A full station is 100 ft of horizontal distance along the stationing line (usually the construction centerline or a named alignment such as the “A” line). The plus is the leftover feet inside that 100-ft interval.

  • Written station Distance from 0+00
  • 0+00 0 ft
  • 0+50 (half station) 50 ft
  • 10+00 1,000 ft
  • 13+27.50 1,327.50 ft
  • 23+27.50 2,327.50 ft

Half stations on a construction job are the 50-ft marks ( 10+50 , 11+00 , 11+50 ). Many roadway crews also set 25-ft marks on sharp curves, flat grades, and curb returns. The plus is still feet, not a decimal station: 10+13.275 would mean 13.275 ft past 10+00, which is not how you encode 1,327.50 ft.

Highway stationing commonly starts at 10+00 (or higher) so a short revision off the beginning of the job does not produce a negative station. Always read the plans for the actual beginning station before you convert a distance.

Worked: 1,327.50 ft along the alignment

Given: a point is 1,327.50 ft ahead of the beginning of stationing, and the beginning station is 10+00 .

Distance from 0+00 = 1,000 + 1,327.50 = 2,327.50 ft .

Full stations = 23; plus = 27.50 ft .

Station = 23+27.50 .

If that same 1,327.50 ft is measured from 0+00 , the station is 13+27.50 . The exam trap is mixing those two beginnings. Convert feet to a plus with ÷ 100 ; do not treat stations as 10-ft or 1,000-ft ticks.

Offsets are measured left (LT) or right (RT) of the stationing line, normal on a tangent and radial on a circular curve, looking upstation (in the direction of increasing station). 15 ft LT at 25+50 is not 15 ft along the centerline.

Station Equations (Ahead / Back)

A station equation is one physical point with two station names. You arrive on the back (BK) station and leave on the ahead (AHD) station.

12+50 BK = 15+00 AHD

Ahead 15+00 is larger than back 12+50 , so 250 ft of station numbers do not exist (a gap ). Ground distance is shorter than the raw station subtraction.

Worked gap. Walk from 10+00 to 16+00 through 12+50 BK = 15+00 AHD :

  • 10+00 → 12+50 = 250 ft
  • Jump to 15+00 (no ground)
  • 15+00 → 16+00 = 100 ft
  • Ground distance = 350 ft

Naïve 16+00 − 10+00 = 600 ft is wrong by the 250 ft gap.

15+00 BK = 12+50 AHD is the opposite: ahead is smaller, so 250 ft of station numbers exist twice (an overlap ). From 10+00 to 16+00 the ground distance is 500 + 350 = 850 ft .

On a lath at the equation, Caltrans-style abbreviations are BK and AHD . Compute every construction distance by breaking at the equation . Do not feed a spreadsheet a single start station and a single end station across the break.

Hub, Lath, Blue Top, Red Top, Finish Grade

Hardware What it is What you measure from

Hub (ginnie) Short 1 in × 1 in wood (tack or punch if the hub is large) driven nearly flush Top of hub is the reference for distance and elevation

Lath (marker stake) Taller witness, keel or a marking card The readable label; not the measured point unless the notes say the lath is the RP

48-in guard lath Flagged lath beside a hub Visibility in grass; protection of control

Blue top Contractor working hub driven so the top is on a specified plane Grade checkers blade to the top. Caltrans: the Contractor sets working stakes (“bluetops”) from Department-furnished control stakes

Red top Another contractor working hub for a different lift Often subgrade when blue is top of base, or the reverse — read the job . It is not a Caltrans Department color name

Finish-grade / FGS Control for the final surface (and, on Caltrans work, the whole structural section) FG on a lath means the cut/fill is to finished grade

Caltrans Surveys Manual Chapter 12 (November 2012) is the Department’s construction-staking playbook on State highway work. Department-furnished control stakes (also called grade stakes ) establish basic line and grade. The Contractor’s working stakes come from those. Final grade stakes (FGS) are set once per grading plane and control the grading plane, subbase, base, and pavement together. Do not expect a new Department color for each lift.

Color (flagging / cards, Caltrans): grading — slope, rough grade, final grade — is yellow ; drainage, curb, and gutter are blue ; horizontal and vertical control is white/red ; clearing is yellow/black ; structures are white ; right-of-way is white/yellow ; signs and similar miscellaneous work are orange .

What a CE Writes on the Stake

The face of the marker shows the references to the feature . Distances are measured from the hub away from that face , along the cross-section (normal or radial). Typical civil markings:

  • Mark Meaning
  • 25+50 Station
  • 15' LT or 15' RT Offset from the stationing line
  • C 2.47 / F 2.75 Cut or fill, hub to feature
  • GRADE The vertical target is design grade at that feature
  • OFFSET / O/S This stake is not on the feature

CL , FL , TC , TBC , FG , SG , HP , CP , DAY , ETW , ES Centerline, flow line, top of curb, top back of curb, finish grade, subgrade, hinge point, catch point, daylight, edge of traveled way, edge of shoulder

  • RPSS , FGS , RGS , CS Reference point for a slope stake; final grade stake; rough grade stake; curb stake
  • BK / AHD Back / ahead at an equation

GRADE answers “cut or fill to what?” OFFSET answers “is this hub the point, or only a witness?” Mixing them is how a crew grades the hub instead of the pavement.

Caltrans card order (top of stake = this reference, then the feature): alignment and station, offset to the stationing line (or CL if on line), elevation of the hub , then cut/fill and distance to the point being staked. If the plans publish an elevation for the feature, the stake shows hub elevation, not a cut/fill , unless the Resident Engineer directed a field adjustment.

Mark slope stakes, abutment-fill stakes, and rough-grade stakes to 0.1 ft . Mark other references to 0.01 ft . Slope ratios on California foot-unit jobs are horizontal:vertical ( 2:1 ), with no plus/minus on the ratio. Pavement cross-slopes are percent , signed from the stationing line out .

Worked: cut from hub to grade

Given: hub elevation 428.62 ft , design grade at the referenced feature 426.15 ft .

Cut = 428.62 − 426.15 = 2.47 ft. Mark C 2.47 and the feature ( GRADE , FL , SG , …). The contractor cuts 2.47 ft from the top of the hub to the design surface.

If the hub is 219.10 ft and grade is 221.85 ft , fill = 221.85 − 219.10 = 2.75 ft . Mark F 2.75 . Sign errors (calling 2.47 a fill because the number is “to grade”) invert the earthwork.

Density and Traps

Typical Caltrans longitudinal spacing (decrease when the Resident Engineer needs intervisibility): slope stakes 100 ft ( 50 ft on curves with radius < 1,000 ft , or when cut/fill > 10 ft ); FGS 50 ft ( 25 ft when radius < 1,000 ft ); curb 50 ft ( 25 ft when grade < 0.3% or radius < 1,000 ft ).

Exam traps: (1) encoding 1,327.50 ft as 10+13.275 or as 13+27.50 when the alignment begins at 10+00 ; (2) subtracting stations across an equation; (3) measuring cut from the lath instead of the hub ; (4) treating a blue top as a Caltrans Department-furnished color — Department grading is yellow , and bluetops are contractor working stakes ; (5) writing 2:1 as vertical:horizontal.

Loading diagram... Stationing, equations, and what the lath is saying