Study guide

8.3 Psychrometrics & Air Properties for HVAC Design

California C-20 HVAC Contractor License CSLB

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Introduction & CA C-20 License Overview

1.1 About the California C-20 HVAC Contractor License & CSLB Exam Path 1.2 License Eligibility, Experience Requirements & Application Process 1.3 Exam Format, Scoring, Retakes & Bond/Insurance Activation

2 Chapter 2: CSLB Licensing Law & Business Organization

2.1 CSLB Structure, License Classifications & the C-20 Scope of Work 2.2 Business Entity Types, Qualifying Individuals & RME/RMO Rules 2.3 Advertising Rules, License Number Disclosure & Subcontracting 2.4 License Renewal, Inactive Status, Violations & Disciplinary Actions

3 Chapter 3: Business Finances & Taxes

3.1 Business Accounting Principles & Financial Statements 3.2 Cash Flow Management & Business Planning 3.3 Federal & California Tax Obligations for Contractors 3.4 Financial Reporting & Recordkeeping Requirements

4 Chapter 4: Contracts, Bidding & Estimating

4.1 Home Improvement Contract (HIC) Requirements & Mandatory Disclosures 4.2 Service & Repair Contracts, Cancellation Rights & Notice Requirements 4.3 Commercial Contracts, Bidding Procedures & Cost Estimating 4.4 Change Orders, Progress Payments & Contract Administration 4.5 Contract Breach, Warranties & Dispute Resolution

5 Chapter 5: Insurance, Bonds & Mechanics Liens

5.1 Contractor's License Bond & Qualifying Individual Bond Requirements 5.2 Workers' Compensation Insurance & Exemption Rules 5.3 Commercial General Liability & Property Insurance 5.4 Mechanics Liens, Preliminary Notices & Stop Payment Notices

6 Chapter 6: Employment Law, Payroll & Public Works

6.1 Hiring, Employee vs. Independent Contractor Classification 6.2 Wage & Hour Law, Overtime & Payroll Requirements 6.3 Employee Supervision, Training & Certified Payroll Recordkeeping 6.4 Termination, Final Pay & Employment Recordkeeping 6.5 Public Works: Prevailing Wage, Apprenticeship & DIR Compliance

7 Chapter 7: Cal/OSHA & Legal Safety Compliance

7.1 Cal/OSHA Injury & Illness Prevention Program (IIPP) & Recordkeeping 7.2 Jobsite Hazard Communication, PPE & Training Requirements 7.3 Asbestos, Lead & Hazardous Materials Handling Rules 7.4 Accident Reporting, Emergency Action Plans & Cal/OSHA Enforcement

8 Chapter 8: HVAC Planning, Load Calculations & Estimating

8.1 Jobsite Evaluation, Blueprint Reading & System Selection 8.2 Manual J Heat Load & Heat Gain Calculations 8.3 Psychrometrics & Air Properties for HVAC Design 8.4 Duct Design & Sizing (Manual D) & Airflow Balancing 8.5 Material & Labor Estimating for HVAC Projects

9 Chapter 9: California Title 24 Energy Code & Mechanical Code Compliance

9.1 Title 24 Part 6 Energy Code Requirements for HVAC Systems 9.2 HERS Verification & Duct Testing Requirements 9.3 California Mechanical Code (CMC) Key Provisions for C-20 Work 9.4 Permits, Inspections & Code Compliance Documentation

10 Chapter 10: Equipment Installation, Ductwork & System Startup

10.1 Equipment Setting, Mounting & Clearances 10.2 Ductwork Fabrication, Sealing & Insulation 10.3 Refrigerant Piping, Brazing & Soldering Techniques 10.4 Electrical & Control Wiring for HVAC Systems 10.5 System Charging, Combustion Venting & Startup/Commissioning

11 Chapter 11: Refrigeration Cycle, Heat Pumps & Solar-Thermal

11.1 Refrigeration Cycle Fundamentals & Components 11.2 Heat Pump Systems & Water Heating Heat Pumps 11.3 Solar-Thermal HVAC Integration

12 Chapter 12: Troubleshooting, Repair & Maintenance

12.1 Electrical Component Diagnostics & Thermostat/Control Troubleshooting 12.2 Mechanical Failure Analysis & Compressor/Motor Diagnostics 12.3 Refrigeration Cycle Diagnostics & Combustion/CO Troubleshooting 12.4 Preventive Maintenance Programs & Service Procedures

13 Chapter 13: Trade Safety & EPA Refrigerant Regulations

13.1 Cal/OSHA Jobsite Safety, PPE & Ladder/Fall Protection 13.2 EPA Section 608 Refrigerant Recovery, Recycling & Handling 13.3 Combustion Venting, Carbon Monoxide & Confined Space Safety 13.4 Hazardous Materials on HVAC Jobsites (Asbestos, Lead, Refrigerant Oil)

8.3 Psychrometrics & Air Properties for HVAC Design

Key Takeaways Explain This Topic AI

Dry-bulb, wet-bulb, dew point, relative humidity, humidity ratio, and enthalpy are the core properties plotted on a psychrometric chart; knowing any two lets you read the rest.

Relative humidity is a ratio of actual to maximum possible moisture at a given temperature — it changes with temperature even when the actual moisture content (humidity ratio) stays fixed.

Equipment must be selected (via ACCA Manual S) with a Sensible Heat Ratio that matches the load's SHR; mismatched equipment causes the 'cold and clammy' complaint from inadequate dehumidification.

Evaporative ('swamp') coolers work well in California's dry inland climates because a large wet-bulb depression allows evaporative cooling to meaningfully lower dry-bulb temperature.

On the chart, cooling with dehumidification moves down-and-left (temperature and humidity ratio both drop); evaporative cooling moves up-and-left along a near-constant wet-bulb line.

Last updated: July 2026

The Psychrometric Chart: Reading Moist Air Properties

Psychrometrics is the study of the physical and thermodynamic properties of moist air — the mixture of dry air and water vapor that every HVAC system is designed to condition. The psychrometric chart plots several of these properties against each other so that, given any two known values, a technician or designer can read off all the others for a given air sample. Manual J and Manual D both rely on psychrometric relationships, and equipment selection (ACCA Manual S, briefly referenced here) depends on matching equipment performance to the psychrometric conditions calculated in Manual J.

The Core Properties

Dry-bulb temperature (DB) is the temperature read on an ordinary thermometer, shielded from moisture and radiation — what people mean by "the temperature" in everyday conversation. It is plotted along the chart's horizontal axis.

Wet-bulb temperature (WB) is the lowest temperature air can reach through evaporative cooling alone — measured with a thermometer whose bulb is wrapped in a wetted wick and exposed to airflow. Wet-bulb is always at or below dry-bulb, and the two are equal only at 100% relative humidity (saturation).

Dew point temperature is the temperature at which air becomes fully saturated and water vapor begins to condense out as liquid — it's why a cold glass of water "sweats" on a humid day the moment the glass surface drops below the surrounding air's dew point.

Relative humidity (RH) is the ratio of the moisture actually in the air to the maximum moisture that air could hold at that same temperature, expressed as a percentage. The same absolute amount of moisture produces a higher RH reading at a cooler temperature and a lower RH reading at a warmer temperature, because warm air can hold more moisture before saturating.

Humidity ratio (sometimes called specific humidity) is the actual mass of water vapor carried per unit mass of dry air, commonly expressed in grains of moisture per pound of dry air (7,000 grains = 1 lb) or in pounds of moisture per pound of dry air. Unlike RH, the humidity ratio doesn't change just because the dry-bulb temperature changes.

Enthalpy is the total heat content of the air — sensible plus latent — expressed in Btu per pound of dry air. On the chart, enthalpy is shown as diagonal lines running from lower-left to upper-right, and it is the single value that captures the total cooling or heating job the equipment has to do.

Why It Matters for Equipment Sizing and Comfort

Because Manual J calculates a load with a specific split between sensible and latent (expressed as the SHR discussed in the prior section), replacement or new equipment must be selected with a matching Sensible Heat Ratio at the design entering-air conditions — this is the job of ACCA Manual S (Equipment Selection), which is not covered in detail in this study guide but which every contractor should know sits directly downstream of Manual J and Manual D. Equipment with too high a rated SHR relative to the load will struggle to remove humidity even if it satisfies the sensible (temperature) portion of the load quickly — the classic "cold and clammy" complaint from an oversized or mismatched system.

Two worked comparisons illustrate how psychrometrics drives real design decisions:

Dry climate example (much of inland California): Outdoor air at 100°F dry-bulb with a wet-bulb temperature around 65-70°F has a large "wet-bulb depression" — the gap between dry-bulb and wet-bulb is wide, meaning the air is holding relatively little moisture for its temperature. This is exactly why evaporative coolers ("swamp coolers") work well and remain common in California's Central Valley and desert regions: evaporating water into a dry airstream drives the dry-bulb temperature down toward the wet-bulb temperature, providing real cooling with far less energy than a compressor-based system.

Humid climate contrast: The same 100°F outdoor air with a wet-bulb temperature of 80°F or higher has almost no wet-bulb depression — evaporative cooling would do almost nothing, and mechanical (compressor-based) cooling with strong latent (dehumidification) capacity is required instead. This is why national HVAC sizing rules of thumb fail: the correct equipment SHR for a coastal Gulf Coast home and a Mojave Desert home at the same dry-bulb design temperature can be very different.

Chart Processes Worth Recognizing

On the chart itself, a few standard "process lines" come up repeatedly on trade exams:

Sensible-only heating or cooling moves horizontally (constant humidity ratio) — dry-bulb temperature changes, moisture content doesn't.

Cooling with dehumidification (what a properly sized air conditioner does) moves down and to the left — both dry-bulb temperature and humidity ratio decrease as the coil cools air below its dew point and condenses moisture out.

Evaporative cooling moves up and to the left along a line of roughly constant wet-bulb temperature (and nearly constant enthalpy) — dry-bulb drops while humidity ratio rises, which is exactly why the process only works well when the starting air is dry.

Recognizing which direction a process moves on the chart — and why — is a faster and more reliable exam strategy than memorizing isolated numeric humidity or temperature values, because the chart's geometry itself encodes the underlying physics.