Study guide

12.2 Sequential and Simultaneous Conveyances

California Professional Land Surveyor PLS

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts 1.2 California PLS Licensure Pathways 1.3 Test Day, References, and Study Strategy

2 Business Practices: Public Practice, Contracts, and Procurement

2.1 Explaining Land Surveying Practice to the Public 2.2 Proposals, Written Contracts, and Scope 2.3 Offering and Procuring Surveying and Incidental Services

3 Business Practices: Personnel, Standards, and Firm Management

3.1 Directing Personnel and Coordinating Third Parties 3.2 Project Standards and Execution Plans 3.3 Managing a California Surveying Business

4 Business Practices: PLS Act, Map Act, Monuments, and Conflicts

4.1 Applying the Professional Land Surveyors' Act 4.2 Applying the Subdivision Map Act: Triggers, Waivers, and Exceptions 4.3 Monument Preservation and Conflicts of Interest

5 Research: Records, Title, and Document Conflicts

5.1 Project Research Sources 5.2 Title Documents and Encumbrances 5.3 Conflicts in Documents, Maps, and Drawings

6 Research: Datums, California Coordinate System, and Control Networks

6.1 Control Datums, Realizations, and Epochs 6.2 California Coordinate System (PRC 8801–8819) 6.3 Planning Control Networks to Accuracy Standards

7 Research: Calculations, Mapping Preparation, and Safety Planning

7.1 Surveying and Construction Calculations 7.2 Aerial and Terrestrial Mapping Preparation 7.3 Planning Field Safety Operations

8 Field Operations: Topographic, Control, and Construction Staking

8.1 Topographic and As-Built Surveys 8.2 Control Surveys in the Field 8.3 Construction Staking Field Practice

9 Field Operations: Boundary, PLSS Retracement, and Monument Search

9.1 Boundary Survey Field Operations 9.2 PLSS Retracement in California 9.3 Diligent Monument Search and Re-establishment

10 Field Operations: Hydrographic Surveys, Monitoring, and Water Evidence

10.1 Hydrographic and Tidal Datum Surveys 10.2 Monitoring Surveys 10.3 Physical Evidence of Water Boundaries

11 Field Operations: Right of Entry, Safety, and Technology Limits

11.1 Right of Entry and Field Communication 11.2 Executing Field Safety Protocols 11.3 Field Technology Limitations

12 Analysis: Hierarchy of Evidence and Conveyances

12.1 Hierarchy of Evidence (CCP 2077) 12.2 Sequential and Simultaneous Conveyances 12.3 Reconciling Deeds with Field Evidence

13 Analysis: Title Conflicts, Encumbrances, and Parol Evidence

13.1 Title Conflicts and Clouds on Title 13.2 Easements, Rights-of-Way, Leases, and Other Encumbrances 13.3 Parol Evidence and Relevant Case Law

14 Analysis: Water Boundaries, Unwritten Rights, and Earth Movement

14.1 Tidal and Non-Tidal Water Boundaries 14.2 Unwritten Rights: Adverse Possession and Prescription 14.3 Earth Movement and Boundaries

15 Analysis: Adjustments, Grid and Ground, and Quality Assurance

15.1 Survey Adjustments and Error Quantification 15.2 Grid versus Ground, Datums, and Heights 15.3 Historic Precision, QA, and Technology Limits

16 Mapping: Legal Descriptions

16.1 Legal Description Components and Types 16.2 Exceptions, Reservations, and Description Strengths 16.3 Preparing Descriptions for Easements and Other Interests

17 Mapping: Records of Survey, Corner Records, and Subdivision Maps

17.1 Records of Survey 17.2 Corner Records 17.3 Subdivision Map Act Maps and Certificates

18 Mapping Products and Professional Consulting

18.1 ALTA/NSPS, Topographic Maps, 3D Models, and Construction Reports 18.2 Professional Conduct, Accuracy Communication, Peer Review, and Liability 18.3 Expert Testimony, Land Planning, and Conflict Resolution

12.2 Sequential and Simultaneous Conveyances

Key Takeaways Explain This Topic AI

Sequential conveyances create senior and junior rights: the earlier grantee takes the described land; later grantees take only what the grantor still owned.

Simultaneous conveyances—lots on one recorded map, equal devises under one will-plan, or parcels in one partition—have equal standing among themselves.

Excess or deficiency between recovered original block or tract monuments is apportioned proportionally among simultaneous lots; it is not dumped on the end lot.

An original interior monument stops proration: place the excess or deficiency in the gap where it occurred; do not carry it through an undisturbed original corner.

On a recorded 300.00-foot four-lot block measured 302.00 feet between original block corners with no original interiors, each 75.00-foot lot becomes 75.50 feet (302.00/300.00 × 75.00).

Last updated: September 2026

Sequential and simultaneous conveyances are not two ways to draw the same line. They are two different title machines. Independent ExamFinch teaching in this section is built for Domain IV knowledge areas F (simultaneous), G (sequential), and H (junior/senior rights), and for activity IV.4 (assess boundary location conflicts). The California PLS item will often hide the machine in a chain of title: two deeds a decade apart versus four lots on one recorded block. If you pick the wrong machine, you will prorate a senior parcel or freeze a simultaneous lot at record width while original block corners sit two feet apart.

Sequential conveyances create senior and junior rights

A sequential conveyance is a grant out of a parent tract after an earlier grant has already left the grantor. Order of title, not the date you survey, controls. The first grantee is senior . That senior takes the land the senior deed describes, located by the same evidence hierarchy as section 12.1: intent, then monuments, then measurements. The later grantee is junior and takes only what the grantor still owned. Excess in the parent tract stays with the grantor or the junior remainder. Deficiency comes out of the junior remainder. You do not "be fair" by splitting the shortage between senior and junior. Fairness is not a title doctrine.

Worked sequential example. The Jones Tract had a record east-west width of 200.00 feet. In 1988 Grantor conveyed "the easterly 80.00 feet of the Jones Tract" to A. In 1992 Grantor conveyed "the westerly 60.00 feet of the Jones Tract" to B. In 1996 Grantor quitclaimed "all remaining interest in the Jones Tract" to C. You recover original monuments on the east and west lines of the Jones Tract 198.00 feet apart (2.00-foot deficiency).

A is senior as to the east 80.00 feet. Hold 80.00 feet from the east original, using the called direction of that east line. B's 1992 deed was next: 60.00 feet from the west original. C, last in time, takes the remainder: 198.00 − 80.00 − 60.00 = 58.00 feet , not the record remainder of 60.00 feet. C's junior remainder absorbed the 2.00-foot hit. If you prorated 198/200 across all three, you would take land from A and B to subsidize C. That is the sequential trap.

If the 1992 deed had instead said "the westerly 60.00 feet of the remainder of the Jones Tract after the 1988 conveyance," you still locate A's senior 80 first, then B, then C. Junior words that ignore the senior gap still cannot enlarge the grantor's remaining estate.

Simultaneous conveyances stand equal

A simultaneous conveyance is not "two deeds signed on Tuesday." It is a division under one plan so that the lots, parcels, or devises were created to stand together: a recorded lot-and-block subdivision, a will that devises equal shares by a plat, a partition that carves a tract into numbered parcels in one judgment. Among those lots, there is no senior lot and no junior lot. They have equal standing . The original exterior monuments of the block or parent plan control the whole. Interior record distances are a plan, not a set of sequential remainders.

That is why excess and deficiency are apportioned among simultaneous lots between the recovered original monuments that control that frontage. Each lot takes its record width times (measured original-to-original distance divided by record original-to-original distance). The end lot does not eat the entire overage just because it is Lot 24.

Worked numeric excess on a four-lot block

Maple Tract, Block 4, recorded 1924. The north line of the block is shown as 300.00 feet. Lots 1, 2, 3, and 4 run west to east, each 75.00 feet. You recover original stone block corners at the northwest and northeast corners. Your measure between those stones along the block's north line is 302.00 feet . You find no original interior lot corners. Occupation fences sit near the record 75-foot marks but were never called as monuments.

This is simultaneous. Do not give Lot 4 the extra 2.00 feet. Do not hold every lot at 75.00 and create a 2.00-foot gore. Apportion:

Proration factor = 302.00 / 300.00 = 1.006666...

  • Each lot width = 75.00 × 302.00 / 300.00 = 75.50 feet
  • Check: 4 × 75.50 = 302.00 feet

Lot 1 begins at the original northwest stone. Lot 4 ends at the original northeast stone. The two-foot excess is in every lot as 0.50 foot.

If the same 302.00-foot block had been created by four sequential metes-and-bounds deeds ("easterly 75 feet," then "easterly 75 feet of the remainder," and so on), the first 75-foot grantee would be senior at 75.00 feet from the called end, and the last remainder would take the leftover 77.00 feet or 73.00 feet depending on which end was senior. Same dirt, opposite math. The exam expects you to read the creation, not only the tape.

Do not prorate through an original interior monument

Apportionment lives only in the gap between controlling original monuments. If you then find an original interior pipe at the record Lot 2/Lot 3 corner, you stop the proration there.

Same Block 4. West original to that interior original measures 151.50 feet (record 150.00). East original is still 302.00 from the west original, so the east gap is 302.00 − 151.50 = 150.50 feet (record 150.00).

Lots 1 and 2 share the west gap: 151.50 / 150.00 = 1.01. Each is 75.00 × 1.01 = 75.75 feet .

Lots 3 and 4 share the east gap: 150.50 / 150.00. Each is 75.00 × 150.50 / 150.00 = 75.25 feet .

Check: 75.75 + 75.75 + 75.25 + 75.25 = 302.00.

The 1.50-foot excess west of the interior original stays west. The 0.50-foot excess east of it stays east. You do not smear 2.00 feet across all four lots after you have found where the original survey actually put the interior corner.

Conflicts that look like proration problems

Activity IV.4 often mixes occupation with simultaneous math. A fence 1.2 feet into Lot 2 does not move a simultaneous lot line if original block corners fix the math. The fence may be an encroachment, evidence of a use, or a lead to an agreed-boundary claim that needs proof of uncertainty plus agreement. It is not a substitute original monument. Conversely, a found original lot-corner pipe that does not match your whole-block proration is not automatically "wrong"—it is a reason to stop prorating through it.

  • Question Sequential Simultaneous
  • How created? Separate grants over time from a remainder One plan: map, will, or partition
  • Standing Senior first; junior takes leftover Equal standing among the lots
  • Excess in the parent Stays with grantor or junior remainder Apportioned among lots between original monuments
  • Deficiency Comes out of junior remainder Apportioned the same way

Original interior monument Locates the senior/junior line if it is the called corner Stops proration; do not carry excess through it

  • Typical California product Metes-and-bounds remainder deeds Lot-and-block tract map
  • Exam traps

Treating simultaneous as a requirement that the deeds closed on the same hour rather than that one plan created the lots.

Reading sequential remainder language ("all remaining") as a prompt to prorate with the senior.

Holding every simultaneous lot at record width after original block corners measure long or short.

Dumping the entire excess on the end lot of a recorded block.

Treating uncalled occupation as an original interior monument that stops or starts proration.

Loading diagram... Sequential senior rights versus simultaneous apportionment

Simultaneous Block 4: 75.00 ft record lots become 75.50 ft when original corners measure 302.00 ft