14.3 Tanks, Vessels & Containers: Installation, Inspection & Repair
Red Seal Industrial Mechanic Millwright
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Safety & Occupational Skills
1.1 WHMIS, SDS & Hazardous Materials 1.2 Lockout/Tagout (LOTO) & Energy Isolation 1.3 Confined Space Entry & Fall Protection 1.4 Blueprint Reading, Trade Math & Precision Measurement Tools 1.5 Hand Tools, Portable Power Tools & Shop Machines 1.6 Access Equipment: Ladders, Scaffolds & Elevating Work Platforms 1.7 Planning Work, Permits, Communication & Mentoring
2 Chapter 2: Fasteners & Bolted Joints
2.1 Threaded Fasteners, Bolts & Thread Standards 2.2 Torque Values, Tightening Patterns & Thread Pitch/Gaging 2.3 Non-Threaded Fasteners, Pins, Keys & Anchors
3 Chapter 3: Rigging, Hoisting & Crane Signals
3.1 Sling Angles, Sling Types & Leg Tension Calculations 3.2 Working Load Limit (WLL) & Hardware Inspection 3.3 Centre of Gravity & Load Weight Estimation 3.4 Hoists, Overhead Cranes & Standard Hand Signals 3.5 Jacking, Skidding, Rollers & Moving Equipment 3.6 Lift Planning, Area Control & Rigging Equipment Maintenance
4 Chapter 4: Prime Movers & Electric Motors
4.1 Electric Motors, Enclosures, Frame Sizes & Synchronous Speed 4.2 Motor Installation, Nameplates & Overload Protection 4.3 Engine Prime Movers & Mechanical Drives Introduction
5 Chapter 5: Belt & Chain Mechanical Drives
5.1 V-Belts, Timing Belts & Sheave Alignment 5.2 Belt Tensioning, Pitch Diameter & Speed Ratios 5.3 Roller Chains, Sprocket Alignment & Lubrication 5.4 Clutches, Brakes & Torque Limiters
6 Chapter 6: Gear Drives, Couplings & Reducers
6.1 Gear Types, Geometry & Gear Ratios 6.2 Couplings (Rigid, Flexible, Fluid) & Installation 6.3 Shaft Keys, Keyways, Taper Sleeves & Hub Fits 6.4 Gear Reducers, Backlash & Mechanical Drive Troubleshooting
7 Chapter 7: Industrial Pumps & Systems
7.1 Centrifugal Pumps, Impellers & Performance Curves 7.2 Positive Displacement Pumps (Gear, Vane, Piston, Diaphragm) 7.3 Cavitation, NPSHa vs NPSHr & Pump Priming 7.4 Pump Maintenance, Packing & Mechanical Seals
8 Chapter 8: Compressors, Fans & Pneumatics
8.1 Reciprocating & Rotary Screw Air Compressors 8.2 Compressed Air Treatment, FRL Units & Air Receivers 8.3 Centrifugal & Axial Fans, Affinity Laws & Airflow 8.4 Pneumatic Circuits, Valves, Actuators & Troubleshooting 8.5 Vacuum Systems, Pumps & Venturi Generators
9 Chapter 9: Bearings, Lubrication & Seals
9.1 Plain Bearings, Bushings & Fits 9.2 Rolling Element Bearings & Installation 9.3 Bearing Heating Limits, Fits & Removal Tools 9.4 Industrial Lubricants, Viscosity, Grease NLGI Grades & Seals
10 Chapter 10: Precision Alignment & Foundations
10.1 Precision Shaft Alignment (Rim-and-Face & Reverse-Dial Methods) 10.2 Laser Alignment, Soft Foot Correction & Thermal Growth 10.3 Machinery Foundations, Leveling, Grouting & Dowelling
11 Chapter 11: Vibration Analysis & Predictive Maintenance
11.1 Vibration Analysis, Dynamic Balancing & Thermography 11.2 Preventive/Predictive Maintenance & Decommissioning 11.3 Non-Destructive Testing (NDT) Methods 11.4 Lubricant & Fluid Analysis 11.5 Commissioning: Pre-Start Checks, Run-In & Documentation
12 Chapter 12: Hydraulic Systems
12.1 Hydraulic Fundamentals: Pascal’s Law, Pressure, Flow & Power 12.2 Hydraulic Fluids, Reservoirs, Filtration & Contamination Control 12.3 Hydraulic Pumps: Gear, Vane & Piston Designs 12.4 Hydraulic Valves: Pressure, Directional & Flow Control 12.5 Hydraulic Actuators: Cylinders, Motors & Accumulators 12.6 Hydraulic Conductors, ISO 1219 Symbols & System Troubleshooting
13 Chapter 13: Conveying Systems, Material Handling & Automation
13.1 Belt Conveyors: Components, Tracking & Training 13.2 Screw, Bucket, Roller, Chain & Pneumatic Conveyors 13.3 Robotics & Automated Equipment
14 Chapter 14: Process Piping, Tanks & Vessels
14.1 Process Piping: Materials, Sizing, Fittings & Joining 14.2 Flanges, Gaskets & Piping Bolted-Joint Assembly 14.3 Tanks, Vessels & Containers: Installation, Inspection & Repair
15 Chapter 15: Materials, Fabrication, Cutting & Welding
15.1 Material Identification: Ferrous & Non-Ferrous Metals, Plastics 15.2 Heat Treatment of Metals 15.3 Oxy-Fuel & Plasma Arc Cutting 15.4 Welding Processes: SMAW, GMAW, GTAW, OFW & Equipment Care 15.5 Layout Procedures & Maintaining Precision Measuring Tools
14.3 Tanks, Vessels & Containers: Installation, Inspection & Repair
Key Takeaways Explain This Topic AI
Pressure vessels in Canada are registered under CSA B51 with a Canadian Registration Number and are inspected and repaired only under a provincial authority such as TSSA, ABSA or Technical Safety BC.
Atmospheric welded storage tanks are built to API 650, low-pressure tanks to API 620, and pressure vessels to ASME Section VIII Division 1.
Emergency venting under API 2000 is mandatory: a sealed tank can be collapsed by vacuum during pump-out or ruptured by overpressure during fill or fire exposure.
Secondary containment for a liquid storage tank must hold at least 110% of the largest tank volume within the dike.
Entering any tank or vessel is a confined-space entry requiring atmospheric testing, positive isolation by blinding or double block and bleed, a permit, ventilation and an attendant.
Last updated: August 2026
Sub-tasks D-19.01, .03, .05 and .07 cover installing, diagnosing, maintaining and repairing process tanks and containers. The millwright's scope is mechanical: foundations, anchorage, nozzles and manways, agitators, level and vent hardware, and the rigging and confined-space work that surrounds any vessel job.
Codes and Jurisdiction
- Standard Covers
- ASME Section VIII, Division 1 Pressure vessels above 15 psig
- API 650 Welded atmospheric aboveground storage tanks
- API 620 Large low-pressure storage tanks (up to about 15 psig)
- API 653 Tank inspection, repair, alteration and reconstruction
- API 2000 Venting of atmospheric and low-pressure storage tanks
- CSA B51 Canadian code for boilers, pressure vessels and pressure piping
In Canada, any vessel over 15 psig must have a design registered with a Canadian Registration Number (CRN) and carries a nameplate stating the maximum allowable working pressure (MAWP), design temperature, manufacturer, serial number and CRN. A millwright must never weld on, alter, or drill into a registered pressure vessel. Repairs and alterations to pressure-retaining components are performed only by a shop holding the appropriate certificate of authorization, under a qualified procedure, with the provincial authority notified. Removing or defacing the nameplate is itself a violation.
Tank Construction and Appurtenances ATMOSPHERIC STORAGE TANK (API 650)
- Conservation vent / PV valve Gauge hatch Emergency vent
- | | |
- +---------------|----------------------------|---------------|-------+
- | v v v | <- fixed roof
- | |
- | <- shell courses, thinner toward the top (hydrostatic loading) |
- | |
- | [level transmitter] [ manway ] |
- | |
- +--[nozzle: fill]-------------------------------[nozzle: suction]----+
- ===== annular plate / bottom plate on a properly graded pad ========
- (chime, sand or oiled-sand foundation, cathodic protection)
- ----- DIKE / SECONDARY CONTAINMENT ------
- Item Function and service point
- Shell courses Thickest at the bottom where hydrostatic head is greatest; UT thickness is monitored per course
Fixed or floating roof Floating roofs reduce vapour loss on volatile products; seals and roof drains are the wear items
- Manway Access for inspection and cleaning; cover and davit hardware is millwright work
- Nozzles Fill, suction, drain, instrument, vent connections; nozzle loads must not be overloaded by piping
- Conservation (pressure/vacuum) vent Breathes the tank in and out during fill and pump-out
- Emergency vent Sized under API 2000 to relieve vapour generated by external fire exposure
- Level instrumentation Float and tape, radar, differential pressure, or sight gauge
- Cathodic protection Sacrificial anodes or impressed current on the tank bottom
- Agitator / mixer Millwright services the drive, seal and shaft; long shafts require a steady bearing
- Emergency Venting: A Life-Safety Item
An atmospheric tank has a very thin shell relative to its diameter and almost no vacuum capability. Two failure modes result:
Vacuum collapse. Pumping out a tank whose vent is plugged, iced, or valved shut pulls a partial vacuum and implodes the shell. Tanks have been crushed by a few kPa of vacuum.
Overpressure rupture. Filling faster than the vent can breathe, or fire exposure boiling the contents, over-pressures the tank.
A conservation vent must be inspected for screen plugging, ice, insect nests and stuck pallets. Never blank off, plug, or valve a tank vent , and never rely on a manway left cracked open as a vent.
Containment
Regulations across Canada require secondary containment — a dike, berm or double-wall — sized to hold at least 110% of the largest tank inside it , with a controlled drain valve kept normally closed and locked. This connects directly to sub-task A-1.03 (Protects the environment) : an uncontained release into soil or a watercourse is a reportable environmental incident.
Foundations, Settlement and Installation
A tank is a heavy, thin-walled structure that is only as good as what it sits on.
Foundation types: compacted granular pad with an oiled-sand cushion, ringwall (concrete ring under the shell with granular fill inside), or a full concrete slab for small tanks.
Levelness: the bottom must be graded so product drains to the outlet and so shell settlement stays uniform. Differential settlement distorts the shell, jams floating roofs, and tears bottom welds at the shell-to-bottom joint.
Settlement survey: elevations are shot at equally spaced points around the shell after hydrostatic test and periodically thereafter. Uniform settlement is tolerable; differential settlement is the problem.
Anchorage: required where wind or seismic uplift, internal pressure, or empty-tank buoyancy in a flooded dike could lift the shell. Anchor chairs are welded to the shell and must be installed to the engineered detail.
Hydrostatic testing: a new atmospheric tank is filled with water to prove the welds and to consolidate the foundation. Fill and drain rates are controlled and the vent path is verified open throughout — the most common way to destroy a brand new tank is to drain it with a closed vent.
Inspection Techniques
Technique Detects
Visual (external and internal) Corrosion, coating failure, weld cracking, settlement, distortion, leaking seams
Ultrasonic thickness (UT) Remaining wall thickness on shell courses, roof and nozzles; the standard corrosion-monitoring method
- Magnetic flux leakage (MFL) floor scanning Underside corrosion pitting of tank floors — invisible from inside
- Vacuum box testing Bottom weld leak-tightness, using soap film under a vacuum box
- Magnetic particle (MT) / dye penetrant (PT) Surface-breaking cracks in welds and nozzle necks
- Radiography (RT) Internal weld defects in pressure-retaining seams
Inspection intervals for atmospheric tanks follow API 653 and are based on measured corrosion rate and remaining life; pressure vessels follow the provincial authority's schedule.
Confined-Space Entry for Vessels
Entering a tank or vessel is a confined-space entry, without exception. The full requirements of section 1.3 apply, and the vessel-specific points are:
Positive isolation. Close and lock the valves, then blind or spade every line , or use double block and bleed where the code permits. A closed valve alone is not isolation — valves leak.
Empty, flush, purge and ventilate. Steam or water washing may be required. Continuous mechanical ventilation must run throughout.
Test the atmosphere before entry and continuously during it: oxygen between 19.5% and 23%, flammable vapour below the permitted percentage of the lower explosive limit, and toxic gases such as hydrogen sulphide and carbon monoxide below occupational exposure limits.
Watch for inerted vessels. A nitrogen-blanketed tank is oxygen-deficient and immediately fatal on entry. Purge and verify oxygen before anyone enters.
Beware residual sludge. Sludge in a hydrocarbon or sour service tank continues to release vapour after the tank looks empty and may be pyrophoric — iron sulphide scale can ignite spontaneously when it dries in air, so it is kept wet during removal.
Permit, trained attendant, retrieval system and rescue plan in place before entry, with communication maintained throughout.
Hot work inside a vessel requires a separate hot-work permit, continuous gas monitoring, and a fire watch.
Common Repairs and Millwright Tasks
Nozzle and manway replacement — cut out, fit and prepare for a certified welder; check for pipe strain on reassembly.
Roof drain and seal replacement on floating-roof tanks.
Agitator and mixer service — shaft straightness (runout typically within 0.25 mm), coupling alignment, seal or packing replacement, and steady-bearing condition. A bent agitator shaft creates a rotating unbalanced load that destroys the gearbox and the tank nozzle.
Level instrument and vent hardware replacement.
Internal coating and liner inspection support.