9.3 Financial Reporting: Statements, Accounting Methods, and Key Ratios

California C-39 Roofing Contractor Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Planning, Codes, and Roofing Estimating

1.1 California Building Codes, Title 24 Energy Standards, and Plan Reading 1.2 Roof Geometry, Area Calculations, and Pitch Multipliers 1.3 Material Takeoffs, Squares, and Waste Calculations 1.4 Roof System Selection, Specifications, Permits, and Project Scheduling 1.5 Labor Production Rates, Overhead, Profit, and Roofing Bid Pricing

2 Chapter 2: Job Site Preparation and Substrate Remediation

2.1 Jobsite Protection, Material Staging, and Temporary Weatherproofing 2.2 Tear-Off Procedures, Overlay Limitations, and Hazardous Materials 2.3 Roof Deck Inspection, Substrate Preparation, and Sheathing Repairs

3 Chapter 3: Low-Slope Roof Systems — Built-Up, Modified Bitumen, and Single-Ply

3.1 Built-Up Roofing (BUR) Systems, Felts, and Hot Bitumen Application 3.2 Modified Bitumen Membrane Systems (APP vs. SBS) and Installation 3.3 Single-Ply Roofing Membranes (TPO, PVC, EPDM) and Seaming Methods

4 Chapter 4: Low-Slope Roof Systems — SPF, Coatings, Flashings, and Maintenance

4.1 Spray Polyurethane Foam (SPF) and Liquid-Applied Protective Coatings 4.2 Low-Slope Drainage, Perimeters, Penetration Flashings, and Scuppers 4.3 Low-Slope Diagnostics, Blister Repairs, and Preventative Maintenance

5 Chapter 5: Steep-Slope Roofing — Flashing, Underlayment, and Ventilation

5.1 Steep-Slope Underlayments, Felt Grades, and Self-Adhering Ice/Water Barriers 5.2 Flashing Details: Valleys, Drip Edges, Step Flashing, Aprons, and Crickets 5.3 Attic and Roof Ventilation: NFVA Requirements, Vent Types, and Airflow Balance

6 Chapter 6: Steep-Slope Roofing — Materials, Installation, and Repair

6.1 Asphalt Shingle Installation, Fastening Patterns, and Wind/Slope Requirements 6.2 Concrete and Clay Tile Roofing (TRI Standards, Battens, and Fastening) 6.3 Standing Seam Metal Panels, Wood Shakes, Slate, and Steep-Slope Repairs 6.4 Steep-Slope Leak Diagnosis, Targeted Repairs, and the Repair-or-Replace Decision

7 Chapter 7: California Roofing Safety — Cal/OSHA, Fall Protection, and Hazards

7.1 Cal/OSHA Fall Protection: Residential Roofing (§1731), Roof Hazards (§1730), and PFAS 7.2 Cal/OSHA Ladder Safety, Scaffold Erection, and Power Line Clearance 7.3 Heat Illness Prevention (CCR §3395), Hot Asphalt Safety, and Personnel PPE 7.4 Injury and Illness Prevention Program, Safety Training, Recordkeeping, and Cal/OSHA Reporting 7.5 Hazard Communication, Asbestos, Lead, and Silica: Managing Unknown Materials

8 Chapter 8: CSLB Licensing Law and Business Organization

8.1 CSLB Licensing Classifications, Bond Requirements, and License Law 8.2 Business Entity Choice, Personnel of Record, and Qualifier Responsibilities 8.3 Advertising Rules, Home Improvement Salespersons, and Subcontracting

9 Chapter 9: Business Finances, Financial Reporting, and Taxes

9.1 Cash Management, Job Costing, and Working Capital 9.2 Budgeting, Business Planning, and Break-Even Analysis 9.3 Financial Reporting: Statements, Accounting Methods, and Key Ratios 9.4 Federal and California Taxes for Roofing Contractors

10 Chapter 10: Employment Requirements, Supervision, and Payroll

10.1 Hiring: Worker Classification, Verification, and New-Hire Reporting 10.2 Supervising and Training Employees 10.3 Performance Evaluation, Personnel Records, and Termination 10.4 California Payroll: Wages, Overtime, Meal and Rest Periods, and Deposits

11 Chapter 11: Insurance, Bonds, and Payment Remedies

11.1 Workers' Compensation Insurance for California Roofing Contractors 11.2 Business Insurance and Surety Bonds 11.3 California Mechanics Lien Law, 20-Day Preliminary Notices, and Lien Waivers

12 Chapter 12: Contract Requirements, Bidding, and Project Execution

12.1 California Roofing Contracts, Home Improvement Law (B&P §7159), and Warranties 12.2 Bidding Practices, Bid Documents, and Competitive Bidding Law 12.3 Job Cost Control and Change Order Management 12.4 Project Organization, Scheduling, and Documentation 12.5 Payments: Progress Payments, Retention, and California Prompt Payment Law

13 Chapter 13: Public Works Roofing Projects

13.1 Prevailing Wage, DIR Registration, and Certified Payroll 13.2 Public Works Bonding and Insurance Requirements

9.3 Financial Reporting: Statements, Accounting Methods, and Key Ratios

Key Takeaways Explain This Topic AI

The balance sheet is a snapshot at a point in time built on assets equals liabilities plus owner's equity; the income statement covers a period and ends in net profit; the cash flow statement reconciles the two by showing where money actually moved.

Percentage-of-completion accounting recognizes revenue as the work is performed, usually by the cost-to-cost method, and is the standard for contractors with contracts spanning reporting periods.

Underbillings, shown as costs and estimated earnings in excess of billings, mean the contractor has performed work it has not yet invoiced and is financing the customer.

Overbillings, shown as billings in excess of costs and estimated earnings, are a liability, not profit, because the contractor has been paid for work it still owes.

Depreciation spreads the cost of equipment over its useful life; straight-line divides cost less salvage by the years of life, while accelerated methods and the Section 179 election move the deduction forward.

Last updated: September 2026

Financial Reporting: Statements, Accounting Methods, and Key Ratios

Quick Answer: Three statements answer three different questions. The balance sheet is a snapshot — Assets = Liabilities + Owner’s Equity \text{Assets} = \text{Liabilities} + \text{Owner's Equity} Assets = Liabilities + Owner’s Equity . The income statement covers a period and ends in net profit. The cash flow statement reconciles them by tracking where money actually moved. For a contractor, add a fourth: the work-in-progress (WIP) schedule , which exposes underbillings (you performed work you have not billed — you are financing the customer) and overbillings (you were paid for work you still owe — a liability, not profit). Contracts spanning reporting periods are normally reported on percentage of completion , usually measured cost-to-cost.

1. The Balance Sheet Assets = Liabilities + Owner’s Equity \text{Assets} = \text{Liabilities} + \text{Owner's Equity} Assets = Liabilities + Owner’s Equity

Assets Liabilities and Equity

Current: cash, accounts receivable, retention receivable, inventory, costs in excess of billings, prepaid insurance Current: accounts payable, accrued payroll and payroll taxes, billings in excess of costs, current portion of notes

Fixed: trucks, trailers, compressors, lifts, tools, less accumulated depreciation Long-term: equipment notes, vehicle loans, long-term debt

Other: deposits, goodwill Equity: paid-in capital plus retained earnings

Retention receivable deserves its own line. It is an asset you cannot spend and often will not see for months.

2. The Income Statement

  • Line Meaning
  • Revenue (contract income) Recognized under the chosen accounting method
  • − Direct job costs Labor burdened, material, subcontracts, equipment, other direct
  • = Gross profit The number that must cover overhead

− General and administrative expense Office, admin salaries, marketing, insurance not charged to jobs, depreciation on general-use assets, licenses

  • = Operating profit
  • ± Other income and expense Interest, gain or loss on equipment sales
  • = Net profit before tax

The classification rule that gets tested: a cost traceable to a specific project is a direct job cost; a cost of being in business generally is G&A. Depreciation on a crane used on jobs is a direct or equipment cost; depreciation on a car used generally by the sales staff is general and administrative .

3. The Cash Flow Statement

Three sections, and the first one is where contractors learn something:

Operating activities — net profit adjusted for non-cash items (depreciation) and for changes in receivables, payables, and billings. A profitable company with exploding receivables shows negative operating cash flow , which is the early warning of the cash crunch described in Section 9.1.

Investing activities — equipment and vehicle purchases and sales.

Financing activities — borrowing, repayment, owner contributions, and distributions.

4. Accounting Methods

Method Revenue recognized Typical use

Cash When cash is received; expenses when paid Very small contractors; simple but distorts any period with heavy receivables

  • Accrual When earned; expenses when incurred The general business standard
  • Completed contract Entirely at completion Short-duration contracts; defers both revenue and cost

Percentage of completion Progressively as work is performed The contractor standard for contracts spanning reporting periods

Cost-to-Cost Percentage of Completion Percent Complete = Costs Incurred to Date Total Estimated Cost \text{Percent Complete} = \frac{\text{Costs Incurred to Date}}{\text{Total Estimated Cost}} Percent Complete = Total Estimated Cost Costs Incurred to Date ​ Revenue Earned to Date = Percent Complete × Total Contract Price \text{Revenue Earned to Date} = \text{Percent Complete} \times \text{Total Contract Price} Revenue Earned to Date = Percent Complete × Total Contract Price

Worked example. A $400,000 commercial reroof with a total estimated cost of $320,000 has incurred $208,000 of cost to date. Percent complete = 208,000 320,000 = 65 % \text{Percent complete} = \frac{208{,}000}{320{,}000} = 65\% Percent complete = 320 , 000 208 , 000 ​ = 65% Revenue earned = 0.65 × 400,000 = $ 260,000 \text{Revenue earned} = 0.65 \times 400{,}000 = \$260{,}000 Revenue earned = 0.65 × 400 , 000 = $260 , 000

If the contractor has billed $235,000 , it has an underbilling of $25,000: work performed but not invoiced, reported as costs and estimated earnings in excess of billings , an asset — and a sign the billing process is lagging production.

If instead it had billed $290,000 , it would have an overbilling of $30,000: billings in excess of costs and estimated earnings , a liability . Overbillings feel like cash in the bank and are not — the contractor still owes the work. Spending overbillings on overhead is a classic route to a failed job and a failed company.

5. Depreciation

Depreciation allocates the cost of a long-lived asset across the periods it serves, matching cost to the revenue it helps produce.

Straight line: Annual Depreciation = Cost − Salvage Value Useful Life in Years \text{Annual Depreciation} = \frac{\text{Cost} - \text{Salvage Value}}{\text{Useful Life in Years}} Annual Depreciation = Useful Life in Years Cost − Salvage Value ​

A $54,000 roofing truck with a $9,000 salvage value and a 5-year life depreciates ( 54,000 − 9,000 ) ÷ 5 = $ 9,000 (54{,}000 - 9{,}000) \div 5 = \text{\textdollar}9{,}000 ( 54 , 000 − 9 , 000 ) ÷ 5 = $ 9 , 000 per year.

Accelerated methods (declining balance, sum-of-the-years'-digits) take more depreciation early, matching the heavier early productivity and repair profile of construction equipment. The federal Section 179 election and bonus depreciation let a contractor expense qualifying equipment in the year placed in service rather than spreading it — a tax timing decision, not an accounting-principle decision, and one to make with a CPA.

Depreciation is a non-cash expense. It reduces reported profit without reducing cash, which is why the cash flow statement adds it back.

6. The Ratios a Lender or Surety Reads

  • Ratio Formula What it tells them
  • Current ratio Current assets ÷ current liabilities Short-term solvency; below 1.0 is a red flag
  • Quick ratio (Cash + receivables) ÷ current liabilities Solvency without relying on inventory or unbilled cost
  • Debt to equity Total liabilities ÷ owner's equity Leverage; high ratios limit bonding capacity
  • Gross margin % Gross profit ÷ revenue Pricing and production performance
  • Net margin % Net profit ÷ revenue Whether overhead is sized to the volume
  • Working capital turnover Revenue ÷ working capital Whether volume has outrun the capital supporting it
  • Return on equity Net profit ÷ owner's equity Whether the owner's capital is earning its keep

A surety underwriting a payment and performance bond for a public works roofing project will look hardest at working capital, the debt-to-equity ratio, the WIP schedule, and whether the contractor's overbillings are funding operations.

7. Keeping Books a Third Party Can Read

Use a construction chart of accounts that separates direct job cost from G&A. Reconcile bank and credit card accounts monthly. Close the month within about two weeks and produce a WIP schedule with it. Have a CPA familiar with construction prepare at least an annual compiled or reviewed statement — CSLB, sureties, and lenders all want statements someone outside the company stands behind. And retain records: injury records five years, payroll records three years, and tax records generally at least four years after the return is filed.

Loading diagram... How the Statements Connect