Study guide

9.4 Wastewater Collection Systems, SSMP & FOG Management

California Water/Wastewater Operator Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: California Water Regulatory Framework & Certification Ladders

1.1 State Water Board & Regional Boards Structure 1.2 Drinking Water Certification: T1-T5 & D1-D5 Requirements 1.3 Wastewater Certification: Grades I-V & OIT Requirements 1.4 Safe Drinking Water Standards, MCLs & Emerging Contaminants 1.5 California Waterworks Standards (Title 22, Chapter 16) 1.6 Public Water System Types, Permits & the Sanitary Survey

2 Chapter 2: California Water Rights, Title 22 & Environmental Policy

2.1 California Title 22 Recycled Water Standards 2.2 California Environmental Quality Act (CEQA) & Proposition 218 2.3 Water Rights & California Water Resources

3 Chapter 3: Drinking Water Source Quality & Coagulation/Flocculation

3.1 Source Water Quality & Watershed Management 3.2 Coagulation Chemistry & Flash Mixing 3.3 Flocculation & Jar Testing 3.4 Wells, Aquifers & Groundwater Hydraulics 3.5 Raw Water Storage, Clearwells & Reservoir Management

4 Chapter 4: Clarification & Granular Media Filtration

4.1 Sedimentation & Advanced Clarification 4.2 Granular Media Filtration Mechanics & Media Types 4.3 Filter Operation, Backwash Cycles & SWTR Compliance

5 Chapter 5: Disinfection, Oxidation & Advanced Water Treatment

5.1 Chlorination Chemistry & Breakpoint Curves 5.2 Disinfection Kinetics & CT Calculations 5.3 Alternative Disinfection: Ozone, UV & Chlorine Dioxide 5.4 Advanced Treatment: Membranes, AOP & PFAS Adsorption 5.5 Chloramination & Nitrification Control 5.6 Iron & Manganese Removal 5.7 Fluoridation Practice & Compliance 5.8 Corrosion Control Treatment & Water Stability 5.9 Taste & Odor Control and Algal Toxin Management

6 Chapter 6: Wastewater Preliminary & Primary Treatment

6.1 Preliminary Treatment: Screening & Grit Removal 6.2 Primary Clarification Operations 6.3 Primary Sludge Characteristics & Pumping 6.4 Stabilization Ponds, Lagoons & Small-Plant Processes

7 Chapter 7: Secondary Biological Treatment & Activated Sludge

7.1 Activated Sludge Process Fundamentals 7.2 Process Control Parameters: F/M, MCRT & SVI 7.3 Activated Sludge Microbiology & Troubleshooting 7.4 Fixed-Film & Hybrid Biological Processes

8 Chapter 8: Biological Nutrient Removal, Water Reuse & Solids Handling

8.1 Biological Nitrogen Removal: Nitrification & Denitrification 8.2 Biological Phosphorus Removal (EBPR) & Chemical Precipitation 8.3 Anaerobic & Aerobic Digestion 8.4 Sludge Thickening, Dewatering & Biosolids Disposal 8.5 Wastewater Disinfection: Chlorination, Dechlorination & UV

9 Chapter 9: Distribution Systems, Collection Networks & Hydraulics

9.1 Hydraulics, Pressure & Flow Dynamics 9.2 Centrifugal Pumps, Motors & VFDs 9.3 Distribution Network Infrastructure & Cross-Connection Control 9.4 Wastewater Collection Systems, SSMP & FOG Management

10 Chapter 10: Laboratory Analytics, Safety & Water Math

10.1 Water & Wastewater Laboratory Methods 10.2 Laboratory Quality Assurance & Regulatory Reporting 10.3 Chemical Safety, Hazardous Gases & Confined Space 10.4 Essential Water & Wastewater Math for Operators

11 Chapter 11: Federal & California Drinking Water Rules

11.1 The Revised Total Coliform Rule & Assessments 11.2 The Lead and Copper Rule and Service Line Replacement 11.3 Surface Water Treatment Rules & Log Removal Credit 11.4 Stage 1 & Stage 2 Disinfection Byproduct Rules 11.5 Secondary MCLs, Notification Levels & Response Levels 11.6 Public Notification, Consumer Confidence Reports & Recordkeeping

12 Chapter 12: Distribution System Design, Demand & Hydraulics

12.1 System Layout, Pressure Zones & Distribution Maps 12.2 Water Demand, Peaking Factors & Fire Flow 12.3 Distribution Storage: Types, Sizing & Turnover 12.4 Head Loss, C-Factor & Distribution Hydraulic Calculations 12.5 Water Hammer, Surge Control & Air Management

13 Chapter 13: Distribution Equipment Operation, Maintenance & Inspection

13.1 Valves: Types, Operation & Exercising Programs 13.2 Fire Hydrants: Types, Testing & Maintenance 13.3 Water Meters: Types, Accuracy & Meter Management 13.4 Instrumentation, In-Line Sensors, Telemetry & SCADA 13.5 Electrical Systems, Motors & Standby Generators 13.6 External Corrosion, Cathodic Protection & Asset Inspection

14 Chapter 14: Water Mains, Piping & Field Construction

14.1 Pipe Materials & Pipe Selection 14.2 Joints, Fittings, Thrust Restraint & Bedding 14.3 Main Installation, Tapping & Service Line Installation 14.4 Leak Detection, Water Loss Auditing & Main Repair 14.5 Main Cleaning & Maintenance: Flushing, Pigging & Lining 14.6 Excavation, Trench Safety & Utility Locating

15 Chapter 15: Disinfecting Distribution Facilities & Maintaining Water Quality

15.1 Water Main Disinfection (AWWA C651) 15.2 Disinfecting Storage Reservoirs (C652) & Wells (C654) 15.3 Maintaining Distribution Water Quality: Residual, Biofilm & Discolored Water 15.4 Cross-Connection Control Program Administration & Device Testing

16 Chapter 16: Plant Equipment, Chemical Feed & Maintenance

16.1 Chemical Feed Systems: Metering Pumps, Dry Feeders & Calibration 16.2 Gas Chlorination Equipment & Hypochlorite Systems 16.3 Blowers, Compressors & Aeration Equipment 16.4 Flow Measurement Devices: Meters, Weirs & Flumes 16.5 Preventive Maintenance, CMMS & Asset Management

17 Chapter 17: Utility Management, Administration & Emergency Response

17.1 Planning, Organizing, Directing & Controlling a Utility Work Group 17.2 Budgets, Water Rates & Financial Management 17.3 Operator Training, Staffing & Safety Program Development 17.4 Energy Management & Optimization 17.5 Emergency Response Planning, Risk & Resilience & Security 17.6 Water Conservation Planning & Drought Response

18 Chapter 18: Applied Operator Mathematics Workshop

18.1 The Exam Conversion Sheet, Units & Dimensional Analysis 18.2 Distribution & Hydraulic Math Workshop 18.3 Treatment & Wastewater Process Math Workshop

9.4 Wastewater Collection Systems, SSMP & FOG Management

Key Takeaways Explain This Topic AI

Gravity sewer collection networks are hydraulically engineered using Manning's equation, requiring a minimum full-pipe cleansing velocity of 2.0 ft/s (0.6 m/s) to prevent solids deposition, septic fermentation, and toxic hydrogen sulfide (H2S) generation.

Wastewater lift stations utilize duplex submersible or dry-well centrifugal pumps controlled by wet well level transducers; wet wells must be sized to limit pump cycle frequency to 6–10 starts per hour, preventing electric motor winding burnout.

Inflow and Infiltration (I&I) severely depletes collection and treatment capacity: Inflow is rapid surface stormwater entering via manhole pickholes and illegal storm connections, while Infiltration is slower groundwater seepage through cracked mains, offset joints, and damaged private laterals.

Commercial Fats, Oils, and Grease (FOG) control requires gravity grease interceptors and hydro-mechanical grease traps; interceptors must be pumped and serviced whenever combined floating grease and bottom sludge exceed 25% of total liquid depth (the 25% Rule).

The California SWRCB Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (Order WQ 2022-0103-DWQ) mandates an 11-element Sewer System Management Plan (SSMP), biennial audits, and strict electronic CIWQS Sanitary Sewer Overflow (SSO) reporting (Category 1 SSOs ≥1,000 gal or reaching surface waters require 2-hour notification to Cal OES).

Last updated: August 2026

Gravity Sewer Hydraulics & Manning's Open-Channel Flow

Municipal sanitary collection networks are designed to operate primarily as gravity open-channel conduits , where raw wastewater flows downhill along sloped pipe inverts with a free water surface exposed to atmospheric air. FREE WATER SURFACE

  • ~~~~~~~~~~~~~
  • / \
  • / \
  • / WET CROSS- \
  • │ SECTION (A) │
  • │ │
  • ╲ ╱
  • ╲ ╱
  • ▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀
  • WETTED PERIMETER (P)
  • Manning's Equation for Gravity Sewers

Flow velocity and volumetric discharge in partially full circular gravity pipes are calculated using Manning's Equation : V = 1.486 n × R 2 / 3 × S 1 / 2 V = \frac{1.486}{n} \times R^{2/3} \times S^{1/2} V = n 1.486 ​ × R 2/3 × S 1/2 Q = A × V = A × 1.486 n × R 2 / 3 × S 1 / 2 Q = A \times V = A \times \frac{1.486}{n} \times R^{2/3} \times S^{1/2} Q = A × V = A × n 1.486 ​ × R 2/3 × S 1/2

Where:

  • V V V = Mean flow velocity (feet per second, ft/s \text{ft/s} ft/s )
  • Q Q Q = Volumetric flow rate (cubic feet per second, cfs \text{cfs} cfs )

n n n = Manning's Roughness Coefficient (dimensionless):

PVC / Vitrified Clay Pipe (VCP) / HDPE: n = 0.009 to 0.011 n = 0.009\text{ to }0.011 n = 0.009 to 0.011 (standard design baseline n = 0.010 n = 0.010 n = 0.010 )

Smooth Precast Concrete: n = 0.012 to 0.013 n = 0.012\text{ to }0.013 n = 0.012 to 0.013

Aged, Corroded Concrete / Tuberculated Ductile Iron: n = 0.015 to 0.018 n = 0.015\text{ to }0.018 n = 0.015 to 0.018

R R R = Hydraulic Radius (feet) = Cross-Sectional Flow Area ( A ) Wetted Perimeter ( P ) = \frac{\text{Cross-Sectional Flow Area } (A)}{\text{Wetted Perimeter } (P)} = Wetted Perimeter ( P ) Cross-Sectional Flow Area ( A ) ​ . For a circular pipe flowing full: R = π D 2 / 4 π D = D 4 R = \frac{\pi D^2 / 4}{\pi D} = \frac{D}{4} R = π D π D 2 /4 ​ = 4 D ​ .

S S S = Slope of the hydraulic grade line / pipe invert slope (feet vertical fall per foot horizontal length, ft/ft \text{ft/ft} ft/ft ).

The 2.0 ft/s Cleansing Velocity Rule

California collection system design standards require all gravity sewer mains to be laid at sufficient slope to achieve a minimum self-cleansing velocity of 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s ( 0.6 m/s 0.6\text{ m/s} 0.6 m/s ) when flowing full or half-full. ┌────────────────────────────────────────────────────────────────────────┐

  • │ Sewer Velocity Dynamics & Impact │
  • ├──────────────────────────┬─────────────────────────────────────────────┤
  • │ Low Velocity (< 2.0 ft/s)│ Heavy fecal solids, grit, and grease settle │
  • │ │ on pipe invert. Anaerobic fermentation forms│
  • │ │ deadly H2S gas and Sulfuric Acid (MIC). │
  • ├──────────────────────────┼─────────────────────────────────────────────┤
  • │ Scouring Velocity │ Keeps organic solids and grit suspended in │
  • │ (2.0 to 3.0 ft/s) │ stream; scours invert sediment clean. │
  • ├──────────────────────────┼─────────────────────────────────────────────┤
  • │ High Velocity (> 10 ft/s)│ Suspended abrasive grit scours and erodes │
  • │ │ pipe invert; high turbulence releases H2S. │
  • └──────────────────────────┴─────────────────────────────────────────────┘
  • Hydrogen Sulfide ( H 2 S H_2S H 2 ​ S ) & Microbiologically Induced Corrosion (MIC)

When sewage velocity drops below 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s , settleable organic solids accumulate on the pipe bottom, creating a thick anaerobic slime layer. Sulfate-reducing bacteria ( Desulfovibrio ) in the slime reduce dissolved sulfate ( SO 4 2 − \text{SO}_4^{2-} SO 4 2 − ​ ) into hydrogen sulfide gas ( H 2 S H_2S H 2 ​ S ) .

Gas Partitioning: H 2 S H_2S H 2 ​ S gas releases out of the sewage into the warm, humid sewer crown atmosphere (lethal toxic gas, IDLH = 100 ppm, paralyzes olfactory nerve at 100+ ppm).

Acid Oxidation: On the damp concrete pipe crown above the waterline, aerobic sulfur-oxidizing bacteria ( Thiobacillus ) oxidize the H 2 S H_2S H 2 ​ S gas into concentrated Sulfuric Acid ( H 2 SO 4 \text{H}_2\text{SO}_4 H 2 ​ SO 4 ​ ) .

Crown Rot: The sulfuric acid dissolves the alkaline calcium carbonate matrix of concrete pipes and unlined ductile iron crowns, causing Microbiologically Induced Corrosion (MIC) , structural thinning, and eventual catastrophic roadway sinkholes/sewer collapses.

Wastewater Lift Stations & Wet Well Engineering

Where topography prevents continuous gravity drainage, wastewater lift stations collect sewage and pump it under pressure through force mains to higher elevation gravity sewers or directly to the treatment plant headworks. SUBMERSIBLE DUPLEX LIFT STATION

  • ┌────────────────────────────────────────────────────────────────────────┐
  • │ Influent Gravity Sewer ──► [ WET WELL SUMP ] │
  • │ │ │
  • │ ── High Level Alarm Elevation (Level Transducer) │
  • │ ── Lag Pump On Elevation │
  • │ ── Lead Pump On Elevation ▲ │
  • │ │ Operating Working Volume (V_eff) │
  • │ ── All Pumps Off Elevation ▼ │
  • │ │ │
  • │ [ Pump 1 (Submersible) ] [ Pump 2 (Submersible) ] │
  • │ │ │ │
  • │ └────────────┬────────────┘ │
  • │ │ (Force Main) │
  • │ ▼ │
  • │ [ Air Release / Vacuum Valve at Summit ] │
  • └────────────────────────────────────────────────────────────────────────┘
  • Wet Well Sizing & Pump Cycle Time Calculations

Electric motors driving submersible non-clog centrifugal pumps generate tremendous internal heat during startup (inrush current). To prevent motor winding insulation breakdown, wet wells must be sized to limit pump starts to a maximum of 6 to 10 starts per hour ( T min ≥ 6 to 10 minutes T_{\text{min}} \ge 6\text{ to }10\text{ minutes} T min ​ ≥ 6 to 10 minutes ).

The theoretical cycle time ( T T T , in minutes) for a single operating pump is governed by: T = V eff Q p − Q in + V eff Q in T = \frac{V_{\text{eff}}}{Q_p - Q_{\text{in}}} + \frac{V_{\text{eff}}}{Q_{\text{in}}} T = Q p ​ − Q in ​ V eff ​ ​ + Q in ​ V eff ​ ​

Where:

  • V eff V_{\text{eff}} V eff ​ = Usable operating liquid volume between "Lead On" and "All Off" floats (gallons)
  • Q p Q_p Q p ​ = Pump discharge capacity (gpm)
  • Q in Q_{\text{in}} Q in ​ = Inflow rate to the wet well (gpm)

Minimum cycle time occurs when influent flow rate exactly equals half the pump capacity ( Q in = 0.5 × Q p Q_{\text{in}} = 0.5 \times Q_p Q in ​ = 0.5 × Q p ​ ), yielding the classic sizing equation: V eff = T min × Q p 4 \mathbf{V_{\text{eff}} = \frac{T_{\text{min}} \times Q_p}{4}} V eff ​ = 4 T min ​ × Q p ​ ​

Example Sizing Calculation

Problem: A lift station pump discharges 500 gpm 500\text{ gpm} 500 gpm . Motor manufacturer specifications restrict the motor to a maximum of 6 starts per hour ( T min = 60 / 6 = 10 minutes T_{\text{min}} = 60 / 6 = 10\text{ minutes} T min ​ = 60/6 = 10 minutes ). Calculate the minimum required effective wet well volume ( V eff V_{\text{eff}} V eff ​ ). V eff = 10 min × 500 gpm 4 = 1 , 250 gallons V_{\text{eff}} = \frac{10\text{ min} \times 500\text{ gpm}}{4} = \mathbf{1,250\text{ gallons}} V eff ​ = 4 10 min × 500 gpm ​ = 1 , 250 gallons

Wet Well Maintenance & Force Main Management

Bottom Slope: Wet well floors must be steep-sloped (minimum 1:1 or 45 ∘ 45^\circ 4 5 ∘ ) toward pump suction intakes to prevent grit and fecal solids from accumulating in dead corners and turning septic.

Sewage Air Release Valves: Sewage force mains must be equipped with specialized sewage air release valves (featuring elongated conical bodies, 316 stainless steel trim, and isolation flush valves) installed at all high points along the force main profile to continuously vent entrapped sewer gas pockets without fouling.

Inflow & Infiltration (I&I) Assessment & CCTV Inspection

Inflow and Infiltration (I&I) is extraneous clear stormwater and groundwater that enters separate municipal collection systems, consuming valuable hydraulic capacity and triggering sanitary sewer overflows (SSOs). ┌────────────────────────────────────────────────────────────────────────┐

  • │ Inflow vs. Infiltration Comparison │
  • ├──────────────────────────┬─────────────────────────────────────────────┤
  • │ Inflow (Direct Stormwater│ Rapid, immediate wet-weather surge into │
  • │ Surface Entry) │ sewer mains. Directly correlates with rain. │
  • │ │ Sources: Manhole pickholes, vented covers, │
  • │ │ illegal roof downspouts, yard drains. │
  • ├──────────────────────────┼─────────────────────────────────────────────┤
  • │ Infiltration (Groundwater│ Slower, sustained groundwater seepage into │
  • │ Subsurface Seepage) │ pipes. Correlates with elevated water table.│
  • │ │ Sources: Cracked/crushed pipe barrels, │
  • │ │ offset joints, root intrusions, laterals. │
  • └──────────────────────────┴─────────────────────────────────────────────┘
  • I&I Diagnostic Tools & CCTV Inspection

Smoke Testing: Non-toxic white smoke is blown under low pressure into sewer segments using a gasoline-powered blower. Smoke surfacing from roof gutters, yard drains, or street storm grates quickly pinpoints illegal direct inflow connections.

Dye Water Flooding: Environmentally safe fluorescent dye (uranine or Rhodamine) is introduced into suspected storm ditches or catch basins while monitoring downstream manholes.

Closed-Circuit Television (CCTV) & NASSCO PACP: Robotic motorized crawler cameras equipped with pan-and-tilt zoom heads travel through sewer mains, recording structural and operational defects. Defects are standardized and scored per the NASSCO PACP (Pipeline Assessment Certification Program) on a 1 to 5 scale (Grade 1 = minor cosmetic defect; Grade 5 = imminent structural collapse requiring emergency trenchless lining or dig-and-replace).

Fats, Oils & Grease (FOG) Management & The 25% Rule

Commercial Fats, Oils, and Grease (FOG) discharged by Food Service Establishments (FSEs—restaurants, bakeries, fast food kitchens) represents the single largest operational cause of collection system blockages and SSOs across California. Hot Kitchen Wastewater ──► [ Commercial Gravity Grease Interceptor (GGI) ]

  • │ (750 to 2,000+ Gallon Underground Vault)
  • ▼
  • ┌─────────────────────────────────────────────────────────────────┐
  • │ Floating Grease Layer (F) ──► Cooled FOG floats to surface │
  • ├─────────────────────────────────────────────────────────────────┤
  • │ Clear Water Zone ──► Clarified water flows through │
  • ├─────────────────────────────────────────────────────────────────┤
  • │ Settled Food Solids (S) ──► Heavy food scraps sink to floor │
  • └─────────────────────────────────────────────────────────────────┘
  • The 25% Rule for Grease Interceptors

Under standard California municipal Sewer Use Ordinances (SUO), all commercial grease interceptors must be pumped out, cleaned, and fully evacuated whenever the combined thickness of the floating grease layer ( F F F ) plus the bottom settled solids layer ( S S S ) exceeds 25% of the total operating liquid depth ( D D D ) : Floating Grease Thickness ( F ) + Bottom Solids Thickness ( S ) Total Operating Liquid Depth ( D ) ≥ 0.25 ( 25 % Rule ) \frac{\text{Floating Grease Thickness } (F) + \text{Bottom Solids Thickness } (S)}{\text{Total Operating Liquid Depth } (D)} \ge 0.25 \quad (25\%\text{ Rule}) Total Operating Liquid Depth ( D ) Floating Grease Thickness ( F ) + Bottom Solids Thickness ( S ) ​ ≥ 0.25 ( 25% Rule )

Operational Failure: When total accumulated grease and solids exceed 25 % 25\% 25% , the effective hydraulic retention time drops below the minimum 30 minutes required for gravity separation. High-velocity kitchen flows sweep molten grease directly into public sewer mains, where it cools, saponifies with calcium into hard "fatbergs," and causes major main blockages.

California Statewide General WDR (Order WQ 2022-0103-DWQ) & SSMP

In California, collection system management is strictly regulated by the State Water Resources Control Board under the Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (SWRCB Order WQ 2022-0103-DWQ) , which superseded the historic Order 2006-0003-DWQ.

The 11 Core Sewer System Management Plan (SSMP) Elements

Every public collection agency operating more than 1.0 mile of sewer main must develop, formally certify, and implement an 11-Element Sewer System Management Plan (SSMP) :

Goals: Measurable targets to prevent SSOs and maintain system reliability.

Organization: Designates the Legally Responsible Official (LRO), operational chain of command, and SSO emergency notification coordinators.

Legal Authority: Enforceable Sewer Use Ordinance authorizing FOG inspections, mandatory grease interceptor pump-outs, lateral repair mandates, and civil penalty enforcement.

Operations and Maintenance (O&M): Preventative hydro-jet cleaning schedules, mechanical rodding, CCTV inspection schedules, and lift station maintenance.

Design and Performance Provisions: Engineering standards for pipe slopes, materials, joint watertightness, trench compaction, and lateral connections.

Overflow Emergency Response Plan (OERP): Standard operating procedures for immediate spill containment, vacuum recovery, traffic control, public warning signage, and water sampling.

FOG Control Program: Source control permitting for all commercial FSEs, grease trap sizing, disposal tracking, and 25% rule compliance audits.

System Evaluation & Capacity Assurance Plan (SECAP): Hydraulic modeling to identify wet-weather hydraulic bottlenecks and prioritize Capital Improvement Projects (CIP).

Monitoring, Measurement & Program Modifications: Annual performance tracking (e.g., total SSOs, miles of pipe cleaned, I&I reduction).

SSMP Program Audits: Mandatory comprehensive audits conducted every two years (biennially) to evaluate SSMP effectiveness and implement regulatory updates.

Communication Program: Public outreach and educational campaigns regarding FOG disposal, flushable wipes hazards, and lateral maintenance.

Sanitary Sewer Overflow (SSO) Reporting Mandates & CIWQS

Under California Order WQ 2022-0103-DWQ, any spill of raw sewage from a collection system or lateral is strictly prohibited . When an SSO occurs, the agency must immediately contain and recover the sewage and comply with strict electronic reporting timelines via the California Integrated Water Quality System (CIWQS) . ┌────────────────────────────────────────────────────────────────────────┐

  • │ California SSO Categorization & Reporting │
  • ├────────────┬─────────────────────────────────┬─────────────────────────┤
  • │ Category │ Overflow Criteria │ Mandatory Reporting Time│
  • ├────────────┼─────────────────────────────────┼─────────────────────────┤
  • │ Category 1 │ ANY volume reaching surface │ - 2 Hours: Notify Cal │
  • │ │ water, storm drain, or drainage │ OES (if ≥1,000 gal or │
  • │ │ channel without 100% recovery; │ surface water contact)│
  • │ │ OR any spill ≥ 1,000 gallons. │ - 3 Business Days: CIWQS│
  • │ │ │ Draft Spill Report │
  • │ │ │ - 15 Days: Certified Rpt│
  • ├────────────┼─────────────────────────────────┼─────────────────────────┤
  • │ Category 2 │ Spill ≥ 1,000 gallons that is │ - 15 Calendar Days: │
  • │ │ 100% contained and recovered │ Certified CIWQS Report│
  • │ │ before reaching surface waters. │ │
  • ├────────────┼─────────────────────────────────┼─────────────────────────┤
  • │ Category 3 │ Spill < 1,000 gallons that is │ - 30 Calendar Days after│
  • │ │ 100% contained and recovered │ end of calendar month:│
  • │ │ without reaching surface waters.│ Certified CIWQS Report│
  • ├────────────┼─────────────────────────────────┼─────────────────────────┤
  • │ No-Spill │ Calendar month with zero SSOs │ - 30 Calendar Days after│
  • │ Cert. │ across entire service network. │ end of calendar month │
  • └────────────┴─────────────────────────────────┴─────────────────────────┘

Warning

Immediate 2-Hour Cal OES Notification: For any Category 1 SSO that equals or exceeds 1,000 gallons , or any spill that enters a surface water body (lake, river, ocean, bay, or flowing storm channel), the utility must notify the California Governor's Office of Emergency Services (Cal OES) by telephone within 2 hours of becoming aware of the discharge!

Loading diagram... California Sanitary Sewer Overflow (SSO) Response & CIWQS Reporting Flowchart