Study guide

11.2 The Lead and Copper Rule and Service Line Replacement

California Water/Wastewater Operator Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: California Water Regulatory Framework & Certification Ladders

1.1 State Water Board & Regional Boards Structure 1.2 Drinking Water Certification: T1-T5 & D1-D5 Requirements 1.3 Wastewater Certification: Grades I-V & OIT Requirements 1.4 Safe Drinking Water Standards, MCLs & Emerging Contaminants 1.5 California Waterworks Standards (Title 22, Chapter 16) 1.6 Public Water System Types, Permits & the Sanitary Survey

2 Chapter 2: California Water Rights, Title 22 & Environmental Policy

2.1 California Title 22 Recycled Water Standards 2.2 California Environmental Quality Act (CEQA) & Proposition 218 2.3 Water Rights & California Water Resources

3 Chapter 3: Drinking Water Source Quality & Coagulation/Flocculation

3.1 Source Water Quality & Watershed Management 3.2 Coagulation Chemistry & Flash Mixing 3.3 Flocculation & Jar Testing 3.4 Wells, Aquifers & Groundwater Hydraulics 3.5 Raw Water Storage, Clearwells & Reservoir Management

4 Chapter 4: Clarification & Granular Media Filtration

4.1 Sedimentation & Advanced Clarification 4.2 Granular Media Filtration Mechanics & Media Types 4.3 Filter Operation, Backwash Cycles & SWTR Compliance

5 Chapter 5: Disinfection, Oxidation & Advanced Water Treatment

5.1 Chlorination Chemistry & Breakpoint Curves 5.2 Disinfection Kinetics & CT Calculations 5.3 Alternative Disinfection: Ozone, UV & Chlorine Dioxide 5.4 Advanced Treatment: Membranes, AOP & PFAS Adsorption 5.5 Chloramination & Nitrification Control 5.6 Iron & Manganese Removal 5.7 Fluoridation Practice & Compliance 5.8 Corrosion Control Treatment & Water Stability 5.9 Taste & Odor Control and Algal Toxin Management

6 Chapter 6: Wastewater Preliminary & Primary Treatment

6.1 Preliminary Treatment: Screening & Grit Removal 6.2 Primary Clarification Operations 6.3 Primary Sludge Characteristics & Pumping 6.4 Stabilization Ponds, Lagoons & Small-Plant Processes

7 Chapter 7: Secondary Biological Treatment & Activated Sludge

7.1 Activated Sludge Process Fundamentals 7.2 Process Control Parameters: F/M, MCRT & SVI 7.3 Activated Sludge Microbiology & Troubleshooting 7.4 Fixed-Film & Hybrid Biological Processes

8 Chapter 8: Biological Nutrient Removal, Water Reuse & Solids Handling

8.1 Biological Nitrogen Removal: Nitrification & Denitrification 8.2 Biological Phosphorus Removal (EBPR) & Chemical Precipitation 8.3 Anaerobic & Aerobic Digestion 8.4 Sludge Thickening, Dewatering & Biosolids Disposal 8.5 Wastewater Disinfection: Chlorination, Dechlorination & UV

9 Chapter 9: Distribution Systems, Collection Networks & Hydraulics

9.1 Hydraulics, Pressure & Flow Dynamics 9.2 Centrifugal Pumps, Motors & VFDs 9.3 Distribution Network Infrastructure & Cross-Connection Control 9.4 Wastewater Collection Systems, SSMP & FOG Management

10 Chapter 10: Laboratory Analytics, Safety & Water Math

10.1 Water & Wastewater Laboratory Methods 10.2 Laboratory Quality Assurance & Regulatory Reporting 10.3 Chemical Safety, Hazardous Gases & Confined Space 10.4 Essential Water & Wastewater Math for Operators

11 Chapter 11: Federal & California Drinking Water Rules

11.1 The Revised Total Coliform Rule & Assessments 11.2 The Lead and Copper Rule and Service Line Replacement 11.3 Surface Water Treatment Rules & Log Removal Credit 11.4 Stage 1 & Stage 2 Disinfection Byproduct Rules 11.5 Secondary MCLs, Notification Levels & Response Levels 11.6 Public Notification, Consumer Confidence Reports & Recordkeeping

12 Chapter 12: Distribution System Design, Demand & Hydraulics

12.1 System Layout, Pressure Zones & Distribution Maps 12.2 Water Demand, Peaking Factors & Fire Flow 12.3 Distribution Storage: Types, Sizing & Turnover 12.4 Head Loss, C-Factor & Distribution Hydraulic Calculations 12.5 Water Hammer, Surge Control & Air Management

13 Chapter 13: Distribution Equipment Operation, Maintenance & Inspection

13.1 Valves: Types, Operation & Exercising Programs 13.2 Fire Hydrants: Types, Testing & Maintenance 13.3 Water Meters: Types, Accuracy & Meter Management 13.4 Instrumentation, In-Line Sensors, Telemetry & SCADA 13.5 Electrical Systems, Motors & Standby Generators 13.6 External Corrosion, Cathodic Protection & Asset Inspection

14 Chapter 14: Water Mains, Piping & Field Construction

14.1 Pipe Materials & Pipe Selection 14.2 Joints, Fittings, Thrust Restraint & Bedding 14.3 Main Installation, Tapping & Service Line Installation 14.4 Leak Detection, Water Loss Auditing & Main Repair 14.5 Main Cleaning & Maintenance: Flushing, Pigging & Lining 14.6 Excavation, Trench Safety & Utility Locating

15 Chapter 15: Disinfecting Distribution Facilities & Maintaining Water Quality

15.1 Water Main Disinfection (AWWA C651) 15.2 Disinfecting Storage Reservoirs (C652) & Wells (C654) 15.3 Maintaining Distribution Water Quality: Residual, Biofilm & Discolored Water 15.4 Cross-Connection Control Program Administration & Device Testing

16 Chapter 16: Plant Equipment, Chemical Feed & Maintenance

16.1 Chemical Feed Systems: Metering Pumps, Dry Feeders & Calibration 16.2 Gas Chlorination Equipment & Hypochlorite Systems 16.3 Blowers, Compressors & Aeration Equipment 16.4 Flow Measurement Devices: Meters, Weirs & Flumes 16.5 Preventive Maintenance, CMMS & Asset Management

17 Chapter 17: Utility Management, Administration & Emergency Response

17.1 Planning, Organizing, Directing & Controlling a Utility Work Group 17.2 Budgets, Water Rates & Financial Management 17.3 Operator Training, Staffing & Safety Program Development 17.4 Energy Management & Optimization 17.5 Emergency Response Planning, Risk & Resilience & Security 17.6 Water Conservation Planning & Drought Response

18 Chapter 18: Applied Operator Mathematics Workshop

18.1 The Exam Conversion Sheet, Units & Dimensional Analysis 18.2 Distribution & Hydraulic Math Workshop 18.3 Treatment & Wastewater Process Math Workshop

11.2 The Lead and Copper Rule and Service Line Replacement

Key Takeaways Explain This Topic AI

The Lead and Copper Rule is a named sub-topic in both the treatment and distribution Expected Range of Knowledge documents.

Lead and copper are regulated by action levels evaluated at the 90th percentile of first-draw tap samples, not by maximum contaminant levels.

The current lead action level is 0.015 mg/L and the copper action level is 1.3 mg/L; the Lead and Copper Rule Improvements lower the lead action level to 0.010 mg/L with a compliance date of November 1, 2027.

Tap samples must be first-draw samples after at least six hours of stagnation, collected by the customer or the utility from a cold-water kitchen or bathroom tap without removing or cleaning the aerator.

Every water system must maintain a service line material inventory, and the LCRI requires replacement of lead and galvanized-requiring-replacement service lines within ten years.

Last updated: September 2026

Action Levels, Not MCLs

Lead and copper are unusual: they are regulated by action levels measured at the customer's tap rather than by maximum contaminant levels measured at the plant. The reason is that neither metal typically originates in the source. Lead comes from lead service lines, lead solder, and brass fixtures; copper comes from copper premise plumbing. How much dissolves is a function of finished water chemistry - which is why the rule's central requirement is optimal corrosion control treatment , and why the rule is fundamentally about the operator's pH, alkalinity, and inhibitor control.

  • Metal Current action level Evaluated at
  • Lead 0.015 mg/L (15 µg/L, 15 ppb) 90th percentile of first-draw tap samples
  • Copper 1.3 mg/L 90th percentile of first-draw tap samples
  • Lead MCLG Zero (there is no safe level of lead)
  • The 90th Percentile Calculation

Sort all valid tap results from lowest to highest .

Multiply the number of samples by 0.9 .

The result identifies the sample position whose value is the 90th percentile. For sample counts that are multiples of 10 the position is exact; otherwise round to the nearest whole sample position (for very small sets of five samples, average the fourth and fifth highest).

Worked example. A system collects 20 samples. 20 x 0.9 = 18 , so the 18th value in ascending order is the 90th percentile. If that value is 0.019 mg/L, the system has exceeded the lead action level.

Important

Exceeding an action level is not an MCL violation. It is a trigger. The system must then take a defined series of actions - and it can be in violation for failing to take those actions, not for the number itself. That distinction is tested constantly.

Sample Site Selection and Collection Protocol

Sites are selected by tier , highest risk first:

Tier Community water system criteria

Tier 1 Single-family structures with a lead service line , or with copper pipe and lead solder installed after 1982 , or containing lead pipe

  • Tier 2 Buildings including multi-family residences meeting the Tier 1 material criteria
  • Tier 3 Single-family structures with copper pipe and lead solder installed before 1983

If not enough Tier 1 sites exist, the system moves down the tiers, documenting why.

  • First-Draw Protocol
  • Cold water tap used for drinking, in a kitchen or bathroom
  • At least six hours of stagnation (and typically not more than 12) before collection
  • One liter collected at the normal flow rate

Do not remove, clean, or replace the aerator before sampling - removing the aerator discards the particulate lead the sample is meant to capture

Do not pre-flush the line the night before

Samples are usually collected by the customer following written instructions, which makes clear instructions and follow-up an operator responsibility

Monitoring is typically at standard six-month periods during June through September for a new or exceeding system, reducing to annual and then triennial for systems with a sustained record below the action levels, plus required water quality parameter (WQP) monitoring for pH, alkalinity, calcium, conductivity, temperature, and orthophosphate or silica in the distribution system and at entry points.

What Happens on an Action Level Exceedance

  • Action Lead exceedance Copper exceedance
  • Public education delivered on a defined schedule Yes No
  • Water quality parameter monitoring Yes Yes
  • Corrosion control treatment study and installation of optimal corrosion control treatment (OCCT) Yes Yes
  • Source water monitoring and treatment if the source contributes Yes Yes
  • Lead service line replacement program Yes No
  • Consumer notification of individual tap results Required for all samples regardless of exceedance Same

Once OCCT is designated by the State, the system must operate within its designated water quality parameter ranges continuously . Falling outside those ranges - for example letting the orthophosphate residual or the pH drift below the designated minimum - is a treatment technique violation independent of any tap result.

Service Line Inventory and Replacement

Under the Lead and Copper Rule Revisions (LCRR) , every community and non-transient non-community water system had to develop an initial service line inventory identifying the material of every service line - both the utility-owned and the customer-owned portion - classified as lead, galvanized requiring replacement, non-lead, or lead status unknown . The inventory must be publicly accessible , and systems with lead, galvanized-requiring-replacement, or unknown lines must notify those customers .

Galvanized requiring replacement means galvanized pipe that is or was ever downstream of a lead service line; galvanized pipe adsorbs and later releases lead, so it is treated as a lead line for replacement purposes.

The Lead and Copper Rule Improvements (LCRI)

EPA finalized the LCRI on October 30, 2024 , effective December 30, 2024, with a compliance date of November 1, 2027 . The three changes operators must know:

The lead action level drops from 0.015 mg/L to 0.010 mg/L.

Mandatory replacement of lead and galvanized-requiring-replacement service lines within 10 years , on a replacement plan that prioritizes replacement using community-specific factors, including populations disproportionately affected by lead.

Strengthened tap sampling, inventory validation, and public communication requirements.

The three years between the effective date and the November 2027 compliance date are a deliberate transition period for systems to build inventories, plan replacements, and re-optimize corrosion control against the lower action level.

Warning

Partial replacement is disfavored for a physical reason. Replacing only the utility-side portion leaves lead in contact with new copper, creating a galvanic couple in which the lead corrodes faster, and the physical disturbance releases accumulated particulate lead. Any service line disturbance requires flushing instructions and a certified point-of-use filter for the customer, plus follow-up sampling.