Study guide

3.6 Resources, Timelines, Work Plans, and Feasibility

CHES Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Orientation: Current Exam Format, Eligibility, Scoring, and Study Model

1.1 Current CHES Purpose and Blueprint 1.2 Format, Delivery, and Time Rules 1.3 Blocks, Breaks, and Navigation 1.4 Scoring, Pass Point, and Results 1.5 Eligibility, Fees, and Scheduling 1.6 Confidentiality, Ethics, and Study Model

2 Area I: Assessment of Needs and Capacity

2.1 Area I Role and Assessment Logic 2.2 Priority Populations, Stakeholders, and Participation 2.3 Primary, Secondary, Qualitative, and Quantitative Data 2.4 Epidemiology, Determinants, and Data Interpretation 2.5 Assets, Capacity, and Community Readiness 2.6 Prioritization, Gaps, and Moving from Assessment to Planning

3 Area II: Planning: Goals, Objectives, Theory, and Program Design

3.1 Planning in the CHES Program Cycle 3.2 Goals and SMART Objectives 3.3 Logic Models and Program Theory 3.4 Selecting Theory and Matching Constructs 3.5 Evidence-Informed Strategies and Intervention Mix 3.6 Resources, Timelines, Work Plans, and Feasibility

4 Area III: Implementation: Strategies, Learning Methods, and Fidelity

4.1 Implementation in the CHES Program Cycle 4.2 Educational Strategies and Learning Methods 4.3 Health Literacy, Cultural Fit, and Accessibility During Delivery 4.4 Recruitment, Retention, and Participant Support 4.5 Fidelity, Adaptation, and Quality Monitoring 4.6 Delivery Barriers, Safety, Referrals, and Documentation

5 Area IV: Evaluation and Research: Designs, Measures, and Data Use

5.1 Evaluation Purpose and Types 5.2 Research Designs and Causal Logic 5.3 Indicators, Measures, Reliability, and Validity 5.4 Data Collection and Management 5.5 Analysis, Interpretation, and Data Use 5.6 Ethics, Reporting, and Continuous Improvement

6 Area V: Advocacy: Policy, Coalitions, and Systems Change

6.1 Advocacy Role and Planning 6.2 Stakeholders, Power, and Decision Makers 6.3 Policy Process and Systems Thinking 6.4 Coalition Building and Partnerships 6.5 Media Advocacy and Message Strategy 6.6 Advocacy Evaluation and Professional Boundaries

7 Area VI: Communication: Health Literacy, Media, Risk, and Audience Fit

7.1 Audience Analysis and Segmentation 7.2 Plain Language and Health Literacy 7.3 Teach-Back, Accessibility, and Inclusive Materials 7.4 Social Marketing and Message Strategy 7.5 Risk Communication and Crisis Messages 7.6 Digital Media, Message Testing, and Evaluation

8 Area VII: Leadership and Management: Resources, Partnerships, and Quality

8.1 Leadership Roles and Styles 8.2 Project Management, Work Plans, and Timelines 8.3 Budgeting, Resource Management, and Grant Basics 8.4 Staffing, Supervision, and Professional Development 8.5 Partnerships, Coalitions, and Collaboration 8.6 Continuous Quality Improvement and Program Sustainability

9 Area VIII: Ethics and Professionalism: Credential Use and Confidentiality

9.1 Health Education Code of Ethics and Entry-Level Judgment 9.2 Confidentiality, Privacy, and Data Protection 9.3 Exam Security, Nondisclosure, and Proprietary Content 9.4 Credential Use, Competence, and Professional Development 9.5 Equity, Fairness, Boundaries, and Power 9.6 Conflicts of Interest, Reporting Concerns, and Accountability

10 Cross-Area Scenarios: Program Cycle Integration and Decision-Making

10.1 Assessment-to-Planning Chain 10.2 Planning-to-Implementation Chain 10.3 Implementation-to-Evaluation Chain 10.4 Advocacy, Communication, and Leadership Integration 10.5 Ethics and Confidentiality Across Scenarios 10.6 Next-Best-Step Scenario Method

11 Timed Exam Strategy: Two-Block Workflow, Diagnostics, and Remediation

11.1 Build a 180-Minute Map for 165 Items 11.2 Work the Two-Block Navigation Rule 11.3 Guessing, Elimination, and Answer Changes 11.4 Convert Diagnostics Into a Study Plan 11.5 Use Practice Sets Without Chasing Memorized Questions 11.6 Run Focused Remediation Sprints by Area

12 Final Review: Recertification, Career Paths, and Next Steps

12.1 Two-Week Final Review Plan 12.2 Official Checklist and PSI Logistics 12.3 Test-Day Execution From Check-In to Exit 12.4 After-Score Steps and Retest Planning 12.5 Recertification, Annual Renewal, and CECH Planning 12.6 Career Paths, MCHES Direction, and Next Steps

3.6 Resources, Timelines, Work Plans, and Feasibility

Key Takeaways Explain This Topic AI

A work plan converts objectives and strategies into tasks, owners, deadlines, and deliverables.

Feasibility spans staffing, budget, time, partner capacity, participant burden, and data demands.

Plans should anticipate barriers and name contingencies before implementation begins.

Ethical planning avoids overpromising outcomes and protects access, privacy, and dignity.

Last updated: June 2026

Making the plan operational before implementation

Once goals, objectives, theory, and strategies are set, the design must become operational. A work plan translates the program design into concrete tasks, naming responsible persons, deadlines, materials, partner contributions, approvals, training needs, communication steps, and evaluation checkpoints. Without this detail, implementation runs on memory and goodwill instead of a shared plan, and Area III delivery falters.

Resources are more than money

Resources include staff time, volunteer capacity, expertise, partner trust, meeting space, technology, transportation, incentives, translation, printing, data systems, and leadership support . The CHES compares the proposed strategy against actual capacity. A six-session skill-building program may be appropriate — but only if there are trained facilitators, accessible locations, recruitment channels, and enough time for genuine practice.

Budget planning ties costs to activities and objectives. Direct costs include supplies, staff hours, participant incentives, room rental, interpretation, childcare, software, and evaluation tools. Indirect (shared) costs include administration, supervision, utilities, and overhead. When an item asks what to do with limited resources, the best answer usually prioritizes essential activities, narrows scope, recruits partners, or revises objectives — not pretending the original plan can proceed unchanged.

Timelines must respect sequence

Timelines should follow logical order, and the exam rewards correct sequencing:

Adapt the curriculum before training facilitators.

Review recruitment materials before outreach begins.

Collect baseline data before the intervention when change will be measured.

Sign partner agreements before accepting participant referrals.

A timeline that violates this order builds avoidable problems into implementation. A tool such as a Gantt chart can map overlapping tasks against deadlines so dependencies stay visible.

Feasibility, participant burden, and ethics

Feasibility includes participant burden . A plan requiring working parents to attend four weekday-afternoon sessions may not fit even if the content is excellent. A plan requiring high-speed internet may exclude rural households or people with limited data. A plan requiring personal health disclosure in a public setting raises privacy concerns. Ethical planning weighs access, dignity, confidentiality, informed consent, and fairness — consistent with Area VIII ethics responsibilities.

Risk planning anticipates recruitment shortfalls, staff turnover, weather disruptions, partner delays, technology failures, and low attendance. Contingencies might include backup facilitators, alternate sites, reminder systems, flexible scheduling, or a phased rollout. The work plan should make these visible enough to act on quickly.

Monitoring and communication built in

Process monitoring must be designed before Area III. Process indicators include enrollment, attendance, session completion, materials distributed, referral follow-up, and fidelity checklist results. They show whether the program is being delivered as planned and later explain whether weak outcomes reflect poor program theory or incomplete implementation — a distinction the exam tests.

The plan should assign communication responsibilities : how decisions are made, how changes are approved, and how concerns are reported. Clear stakeholder communication prevents duplication, clarifies expectations, and builds trust. Programs involving schools, clinics, employers, or community-based organizations must respect each setting's procedures.

  • Work plan element Planning question Example detail
  • Task What must be done? Train peer educators
  • Owner Who is accountable? Program coordinator
  • Deadline When is it due? Two weeks before launch
  • Resource What is needed? Training room and checklist
  • Indicator How will progress show? Attendance and skill sign-off
  • Contingency What if it fails? Backup training date

For work-plan items, several tasks look reasonable. Choose the answer that creates clarity before action — assign roles, set timelines, confirm resources, train staff, develop materials, or align evaluation indicators. Avoid answers that leap to broad promotion while the stem still shows unresolved feasibility or access issues.

A six-question feasibility screen

Before a plan is approved, run it through a quick feasibility screen. The exam often hides the answer inside one of these dimensions:

Staffing: are there enough trained people, and is turnover covered?

Budget: are direct and indirect costs funded, with a plan if money is cut?

Time: does the schedule fit the semester, grant period, or clinic workflow?

Partner capacity: have partners agreed and can they actually deliver?

Participant burden: is the time, travel, technology, and disclosure asked of participants reasonable and equitable?

Data demands: can monitoring and evaluation data be collected without overburdening staff or participants?

If any dimension fails, the best planning response is to adjust the plan — narrow scope, change delivery channel, add a partner, or revise the objective — rather than push forward unchanged.

Sequencing and dependencies

Many work-plan items test whether you can order dependent tasks. Materials must exist before staff are trained on them; staff must be trained before delivery; baseline data must be collected before an intervention whose effect will be measured; partner agreements must be signed before referrals flow. A task with a dependency cannot start until its predecessor finishes, and the keyed answer respects that order. Mapping tasks on a timeline (for example, a Gantt-style chart) makes overlapping work and critical dependencies visible so the team can spot a sequence error before launch.

Connecting planning to evaluation and ethics

Good planning designs evaluation in from the start , not as an afterthought. Process indicators (enrollment, attendance, completion, fidelity checks) are chosen during Area II so that Area IV can later separate a theory failure from an implementation failure. Ethical planning, aligned with Area VIII responsibilities, protects informed consent, confidentiality, equitable access, and honest reporting, and it refuses to overpromise outcomes the program cannot produce.

On the exam, the most defensible work-plan answer is the one that is clear, sequenced, feasible, monitored, and honest — clarity and feasibility almost always beat speed or ambition.