Study guide
3.3 Strategy, Risk Management, and Performance of the Activity Under Review
CIA Part 2 Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: CIA Part 2 Exam Orientation
1.1 Current CIA Part 2 Exam Facts 1.2 Eligibility, Fees, and Pearson VUE Scheduling 1.3 Scoring, Results Timing, and the 2025 Syllabus Map
2 Chapter 2: Engagement Objectives and Scope
2.1 Topical Requirements in Objectives and Scope 2.2 Elements Used to Build Engagement Objectives 2.3 Scope Limitations, Stakeholder Requests, and Scope Changes
3 Chapter 3: Evaluation Criteria and Planning Context
3.1 Selecting and Testing Evaluation Criteria 3.2 Applying Topical Requirements When Planning 3.3 Strategy, Risk Management, and Performance of the Activity Under Review
4 Chapter 4: Technology, Continuity, and Finance in Planning
4.1 Cybersecurity, IT General Controls, Privacy, and Data Security 4.2 Business Continuity, Disaster Recovery, and Resilience 4.3 Finance and Accounting Concepts for the Activity Under Review
5 Chapter 5: Business Process and System Risks in Planning
5.1 Asset, Supply Chain, Inventory, Payables, Procurement, and Compliance Processes 5.2 Third-Party Process Risks 5.3 CRM, ERP, and GRC System Risks
6 Chapter 6: Engagement Approach and Project Management
6.1 Agile, Traditional, Integrated, and Remote Approaches 6.2 Project Management While Planning and Conducting Engagements
7 Chapter 7: Engagement Risk Assessment
7.1 Topical Requirements and Pervasive Financial, Operational, IT, Cyber, and Regulatory Risks 7.2 Emerging Risks and the Impact of Change 7.3 Methods to Evaluate and Prioritize Risks and Controls
8 Chapter 8: Structure, Environment, and Culture
8.1 Centralized vs Decentralized, Flat vs Traditional, In-Person vs Remote 8.2 Culture, Group Behavior, and Tone at the Top
9 Chapter 9: Control Design, Effectiveness, and Efficiency Procedures
9.1 Procedures to Evaluate Control Design 9.2 Procedures to Test Operating Effectiveness 9.3 Procedures to Test Control Efficiency
10 Chapter 10: Work Programs, Testing Methodologies, and Resources
10.1 Evaluating Adequacy of the Engagement Work Program 10.2 Testing Methodologies for Accounting, Finance, IT, Operations, and Cybersecurity 10.3 Financial, Human, and Technological Resources and Limitation Implications
11 Chapter 11: Information Sources and Preliminary Survey
11.1 Interviews, Observations, and Walk-Throughs 11.2 Data Analysis as an Information Source 11.3 Policies, Checklists, Risk-and-Control Questionnaires, and Self-Assessments
12 Chapter 12: Evidence Relevance, Sufficiency, and Reliability
12.1 Criteria for Evidence Quality 12.2 Independence, Corroboration, and the Control Environment 12.3 Evidence an Informed, Competent Person Could Rely On
13 Chapter 13: Technology Options for Findings and Conclusions
13.1 Artificial Intelligence, Machine Learning, and Robotic Process Automation 13.2 Continuous Monitoring, Dashboards, and Embedded Audit Modules
14 Chapter 14: Process Mapping and Data Analytics
14.1 Workflow Segments, Process Maps, Walk-Throughs, and RACI 14.2 Structured vs Unstructured Data and the Analytics Process 14.3 Diagnostic, Prescriptive, Predictive, Anomaly, and Text Analysis
15 Chapter 15: Analytical Review and Finding Evaluation
15.1 Ratios, Variances, Trends, and Benchmarking 15.2 Selecting Analytical Techniques for Engagement Objectives 15.3 Comparing Existing Conditions to Evaluation Criteria 15.4 Root Causes, Effects, and Significance of Findings
16 Chapter 16: Workpapers and Engagement Conclusions
16.1 Organizing Complete Workpapers with Sufficient Evidence 16.2 Linking Workpapers to Results; Retention, Regulation, and Policy 16.3 Aggregating Findings and Concluding on Governance, Risk, and Control
17 Chapter 17: Engagement Supervision
17.1 Supervision Throughout Planning and Fieldwork 17.2 Coordinating Assignments and Reviewing Workpapers and Conclusions 17.3 Evaluating Auditors' Performance
18 Chapter 18: Communication During the Engagement
18.1 Formal and Informal Communication Across Planning, Fieldwork, and Reporting 18.2 Situations That Require Escalation 18.3 Selecting Appropriate Stakeholders for Engagement Communication
19 Chapter 19: Final Review and Test Day
19.1 2025 vs 2019 Traps and Part 2 vs Part 3 Boundaries 19.2 Pacing, Test-Center Rules, and Official Results
3.3 Strategy, Risk Management, and Performance of the Activity Under Review
Key Takeaways Explain This Topic AI
CIA Part 2 A3b is about the strategic objectives of the activity under review — not the chief audit executive's annual internal audit plan
You cannot plan key-risk coverage if you do not understand what the activity is trying to achieve, which KPIs it uses, and how it manages risk to those objectives
Strategy, risk management, business performance measures, and performance management techniques must be read together; incentive scorecards show where people will trade control for a target
Efficiency KPIs such as invoice cycle time can conflict with control objectives such as three-way match completeness, duplicate-payment prevention, and vendor-master segregation of duties
Plan procedures against the controls the activity's strategy is likely to stress, and use the activity's own KRIs and residual-risk limits as candidate evaluation criteria after they pass the Section 3.1 tests
Last updated: August 2026
3.3 Strategy, Risk Management, and Performance of the Activity Under Review
Quick Answer: You cannot plan key-risk coverage if you do not understand what the activity under review is trying to achieve, which KPIs it uses, and how it manages risk to those objectives. CIA Part 2 A3b is an engagement-planning skill. It is not the annual internal audit plan, not the CAE's board dashboard, and not a license to redesign corporate strategy.
Section A3 of the 2025 syllabus tells you to plan the engagement so you can assess key risks and controls. Bullet A3b is specific: when planning, recognize the strategic objectives of the activity under review and their integration with risk management, business performance measures, and performance management techniques. “Integration” is the exam word. Strategy without KPIs is a poster. KPIs without risk limits are a speedometer with no brakes. Risk registers that never mention the activity's actual targets are theatre.
Three questions that unlock the work program
Before you choose samples, answer three questions in the planning file:
What is this activity trying to achieve this year? Not the enterprise mission statement. The activity's own objectives — cycle-time reduction, cost-per-unit, fill rate, licensing turnaround, claims accuracy, uptime, enrollment yield.
How is success measured and steered? Business performance measures (KPIs, SLAs, balanced-scorecard cells) plus performance management techniques (OKRs, Lean/Six Sigma throughput goals, operating reviews, incentive compensation ).
How does the activity manage risk to those objectives? Risk appetite and tolerance, key risk indicators, compensating controls, accepted residual risk, and escalation when a KRI is breached.
If you cannot answer those three, you do not yet know where the activity will cut corners. You therefore cannot claim you planned coverage of key risks. You can only claim you planned coverage of last year's work program.
Stay inside the engagement. How the CAE selected this activity for the annual plan, how many hours finance receives this year, and how the CAE reports internal audit's own KPIs to the board are CIA Part 3 topics (GIAS Domain IV). Using them as distractors is a common 2019-syllabus leftover.
How the four pieces integrate
Piece What you collect in planning Why it changes procedures
Strategic objectives of the activity Approved local strategy, shared-service mandate, transformation business case Tells you which outcomes management will defend even if controls slow them down
Risk management Activity-level risks on the ERM register, residual-risk ratings, appetite/tolerance, incident history Tells you which failures management already accepted — and which it claims it did not
Business performance measures KPI dictionary, SLA clauses, dashboard definitions, clock-start rules Candidate evaluation criteria (after the Section 3.1 tests) and a map of measurement bias
Performance management techniques Scorecards, OKRs, stretch targets, bonus weightings, quality gates, daily huddles Tells you where people are paid or praised to hit a number
The integration test on the exam looks like this: given an activity objective, a KPI, and a risk limit, which engagement procedures address the tension among them? The wrong answers isolate one piece (“cycle time is improving, so risk is low”) or jump to the CAE's annual plan.
Performance management techniques deserve a hard look because they are how strategy becomes daily behavior:
Balanced scorecard / weighted bonus scorecard — If 80% of the bonus is cycle time and 20% is accuracy, planning should expect accuracy controls to be under pressure.
OKRs — A stretch “key result” of three-day invoice cycle time is a design choice, not a law of nature. Ask what was de-scoped to make the stretch possible.
SLAs and operating-level agreements — These are often the most relevant criteria for the activity (Section 3.1). Confirm the definition matches the dashboard, or your comparisons will not be reliable.
Lean / Six Sigma cycle-time projects — Throughput projects often remove “non-value-added” checks. Your job is to see whether a control was reclassified as waste.
Quality gates versus skip rules — Match waivers, auto-approval thresholds, and “touchless” invoice processing are performance techniques with control consequences.
Scenario: shared-service accounts payable chasing cycle time
A global manufacturer moved AP into a shared-service center. The center's strategy for this fiscal year is to cut average invoice cycle time from 8 days to 3 days . The business case promised working-capital improvement and a lower cost per invoice. The center's performance measures are average days to pay, invoices per FTE, and cost per invoice. Its monthly scorecard weights cycle time at 70%, cost at 20%, and “quality” at 10%. Quality is defined as the percentage of invoices paid without a vendor query — not as match completeness.
Risk management tells a different story. Duplicate payments are rated residual “low” if they stay under 0.15% of spend . Three-way match may be waived under $5,000 with a single approver “to protect cycle time.” Vendor-master changes are processed by the same team that can add invoices to the payment run on overtime weekends. Incentive pay for team leads is tied to the cycle-time cell of the scorecard.
If you plan only to test whether cycle time is 3 days, you will likely conclude the function is succeeding. That is the trap. Efficiency KPIs can conflict with control . The strategy predicts where control will break:
Control likely stressed by the 3-day strategy Why cycle time puts it under pressure Planning implication
Three-way match Waivers and skip rules shorten the path from invoice to payment Sample waiver volume, threshold breaches, and approver SOD
Duplicate-payment prevention Faster processing reduces time to notice a second invoice Plan analytics on invoice number, amount, and vendor variants
Vendor-master integrity New vendors and bank-detail changes can be rushed to “unblock” invoices Test change logs versus payment-run access
Segregation of duties Overtime and cross-training to hit the KPI can combine incompatible duties Re-perform SOD in the live system, not the policy narrative
Hold-and-query discipline “Paid without query” as a quality metric punishes legitimate holds Recast quality using criteria that include valid holds
Those procedures are still engagement planning for this activity. They are not a supply-chain process chapter (Chapter 5) and not a finance-concepts chapter (Chapter 4). You are learning to read strategy as a risk signal.
Turning the scenario into criteria and coverage
Apply Section 3.1 to this activity:
Cycle-time SLA (if signed and measurable) is a relevant, specific criterion for the efficiency objective — use it, do not replace it with an unagreed four-hour target.
Duplicate-payment residual-risk limit of 0.15% of spend is a management-established performance measure that can serve as a criterion for the accuracy objective if it is specific, practical, and aligned with risk appetite. If it is a slogan with no data definition, it fails the tests and you discuss a replacement.
Match-waiver policy is an internal-policy criterion. Planning should include the population of waivers, not only happy-path matched invoices — otherwise your comparisons are not reliable.
Do not let the activity's favorite KPI monopolize the engagement. A3b requires you to see the system : objective, measures, techniques, and risk management. Key-risk coverage means the work program spends time on the controls the strategy is currently asking people to weaken.
Exam traps for A3b
Treating improving KPIs as low inherent risk. Cycle time falling from 8 days to 2.1 days is a performance result. It can increase control risk.
Using only enterprise strategy. “The company wants to be a low-cost producer” is not a substitute for the AP center's three-day objective and waiver rule.
Drifting into the annual audit plan. Hours allocated to finance, rotational coverage of AP versus payroll, and CAE utilization are the wrong layer.
Ignoring incentive design. If you never ask how people are paid, you will miss why match waivers spiked in the last quarter of the bonus year.
Planning is complete for A3b when the work program can point to each key risk and say: this risk exists because of what the activity is trying to achieve, how it measures itself, and how it has chosen to manage (or accept) the related risk.