12.2 Relevant Costs of Materials, Labour, and Overheads
CIMA BA2: Fundamentals of Management Accounting Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Context of Management Accounting
1.1 The Need for Management Accounting, the GMAP Definition & Comparison with Financial Accounting 1.2 Qualities of Good Management Information: From Data to Decisions 1.3 Information for Operational, Managerial and Strategic Levels 1.4 The Role of the Management Accountant: CIMA's View, IFAC's Domain & Position in the Organisation 1.5 CIMA as a Professional Body: Members, Candidates, the Profession & Society
2 Chapter 2: Cost Identification, Classification and Behaviour
2.1 Cost Classification by Nature, Function, and Element 2.2 Cost Behaviour Patterns and Relevant Range 2.3 The High-Low Method and Cost Prediction 2.4 Scattergraph and Least-Squares Regression for Cost Estimation
3 Chapter 3: Overheads and Absorption Costing
3.1 Production Overheads: Allocation and Apportionment 3.2 Overhead Absorption Rates (OAR) & Under/Over-Absorption
4 Chapter 4: Marginal Costing, Profit Reconciliation and Cost-Based Pricing
4.1 Marginal Costing vs Absorption Costing Principles 4.2 Reconciling Marginal and Absorption Costing Operating Profits 4.3 Pricing with Cost Information: Full-Cost-Plus, Marginal-Cost-Plus, Mark-Ups, Margins and Return Targets
5 Chapter 5: Budget Preparation: Functional, Master and Cash Budgets
5.1 Purposes of Budgeting & The Budgeting Process 5.2 The Principal Budget Factor & Functional Budgets 5.3 The Master Budget: Budgeted Profit or Loss, Financial Position and Cash Flow 5.4 Cash Budgets & Cash Flow Forecasting
6 Chapter 6: Budgetary Control: Flexible Budgets, Behaviour and Budgeting Approaches
6.1 Fixed vs Flexible Budgeting and Budget Flexing 6.2 Budgetary Control Systems, Participation & Behavioural Aspects 6.3 Alternative Budgeting Approaches: Incremental, ZBB & Rolling Budgets
7 Chapter 7: Standard Costing and Cost Variances
7.1 Standard Costing Principles and Types of Standards 7.2 Direct Material Price and Usage Variances 7.3 Direct Labour Rate, Efficiency, and Idle Time Variances 7.4 Variable and Fixed Overhead Variances
8 Chapter 8: Sales Variances, Operating Statements and Interpreting Variances
8.1 Sales Variances and Operating Statements (Marginal and Absorption Formats) 8.2 Interpreting Variances: Causes, Interrelationships and Deciding What to Investigate
9 Chapter 9: Performance Measurement
9.1 The Need for Performance Measures: Responsibility Accounting, Controllability and Service Industries 9.2 Financial and Non-Financial Performance Measures in Manufacturing and Service Organisations
10 Chapter 10: Integrated Accounts, Job and Batch Costing and Management Reports
10.1 Integrating Cost and Financial Accounts: Control Accounts and the Manufacturing Account 10.2 Integrated Ledgers with Under- and Over-Absorption and Standard Cost Variances 10.3 Job and Batch Costing: Job Cost Cards, Job Accounts and Pricing a Job 10.4 Cost Reports for Manufacturing, Service and Not-for-Profit Organisations
11 Chapter 11: Risk, Probability and Statistics for Decision-Making
11.1 Risk, Uncertainty and Probability: Rules and Joint Probabilities for Decisions 11.2 Expected Values, Expected Value Tables and Their Limitations 11.3 Averages and Dispersion: Mean, Median, Mode, Range, Variance, Standard Deviation and Coefficient of Variation 11.4 The Normal Distribution: Z-Scores, Normal Distribution Tables and Business Probabilities
12 Chapter 12: Relevant Costing and Short-Term Decisions
12.1 Relevant Cost Concepts: Future, Incremental, and Opportunity Costs 12.2 Relevant Costs of Materials, Labour, and Overheads 12.3 Short-Term Operational Decisions: Make-or-Buy, Shutdowns, Special Orders
13 Chapter 13: Breakeven Analysis and Limiting Factor Analysis
13.1 Single-Product Break-Even Analysis & Margin of Safety 13.2 Target Profit Calculations, Operating Gearing & CVP Assumptions 13.3 Multi-Product CVP Analysis & Break-Even Charts 13.4 Limiting Factor Analysis (Key Factor Analysis)
14 Chapter 14: Long-Term Decisions: Time Value of Money, Payback, NPV and IRR
14.1 Time Value of Money: Compounding, Discounting, Annuities & Perpetuities 14.2 Payback Period Method: Constant and Uneven Cash Flows 14.3 Net Present Value (NPV): Methodology and Decision Rules 14.4 Internal Rate of Return (IRR) and Interpolation
12.2 Relevant Costs of Materials, Labour, and Overheads
Key Takeaways Explain This Topic AI
For direct materials in continuous regular use within the business, the relevant cost is the current replacement purchase price, regardless of historical acquisition cost.
For obsolete materials in stock with no alternative use, the relevant cost is the net realizable scrap value forgone by utilizing them in the project.
Direct labour with existing spare capacity incurs a relevant cost of $0, whereas fully utilized labour diverted from other profitable work incurs direct wages plus the contribution forgone per hour.
Overheads are relevant only to the extent they represent directly attributable incremental cash disbursements caused solely by the decision.
Last updated: September 2026
Determining the relevant cost of operational resources requires applying specific decision logic to each cost element: direct materials, direct labour, and production overheads. Rather than relying on standard rates or historical ledger entries, the management accountant must examine the current availability, operational deployment, and alternative uses of each resource.
1. Direct Materials Decision Framework
When a specific contract or operational decision requires raw materials, the relevant cost depends entirely on whether the material is currently held in inventory and, if so, whether it is in regular ongoing use.
Case 1: Material Not in Stock
If the material is not currently held in inventory, the business must purchase it on the open market. The relevant cost is the current purchase (replacement) price paid to suppliers, including any necessary delivery or inward freight charges.
Case 2: Material Held in Stock and in Regular Ongoing Use
If the material is already held in warehouse inventory and is continuously consumed by the company's regular product lines, taking units from stock for a special project depletes the inventory. To maintain normal operations, the company must purchase replacement units from the supplier. Therefore, the relevant cost is the current replacement price , NOT the original historical cost paid when the material was bought.
Case 3: Material Held in Stock with No Regular Use (Surplus or Obsolete)
If the material was purchased for a prior discontinued contract and has no ongoing use in normal production, using it for the proposed project does not trigger a replacement purchase. Instead, the relevant cost is the opportunity cost of what the business gives up by consuming it:
Scrap Sale: The net realizable value (NRV) obtained by selling the material to a scrap dealer.
Alternative Substitution: The net cost savings achieved by modifying the material to replace another standard raw material in another department.
Decision Rule: The relevant cost is the higher of the Net Realizable Scrap Value and the Net Value in Alternative Use (the best forgone economic alternative).
Case 4: Obsolete Material Incurring Disposal Costs
Occasionally, surplus chemical or hazardous materials incur legal environmental disposal fees if discarded. If utilizing the material in a new contract safely neutralizes or consumes it, the company avoids paying the disposal fee . This avoided cash outflow is treated as a negative relevant cost (a cash saving / benefit) that reduces the total cost of the contract.
- Inventory Status Operational Context Relevant Cost Rule
- Not in stock Must purchase on market Current purchase / replacement price
- In stock In continuous regular use Current purchase / replacement price
- In stock Obsolete; scrap sale only Net Realizable Value (scrap value)
- In stock Obsolete; can substitute other material Higher of scrap value or net substitution savings
- In stock Hazardous; costs money to dump Negative cost (saving in avoided disposal fee)
Important
The original historical purchase cost (book value) of inventory is ALWAYS a sunk cost. Whether you paid $5, $50, or $500 per unit in the past is completely irrelevant to today's decision.
2. Direct Labour Decision Framework
Direct labour is not automatically a variable cost. In modern business, employment contracts, union agreements, and labor regulations often mean that the basic workforce is paid a fixed salary regardless of actual production output. The relevant cost of labour depends strictly on spare capacity and operational constraints .
Condition 1: Casual or Temporary Labour
If the company hires casual workers, freelancers, or subcontractors specifically for the contract, the entire wage payment is an incremental cash outflow. The relevant cost is the gross wage rate paid .
Condition 2: Permanent Workforce with Spare (Idle) Capacity
If permanent employees are under-utilized and have sufficient idle time to complete the work during normal paid hours, their basic wages will be paid regardless of whether the project is accepted. No additional cash leaves the company bank account. Therefore, the relevant cost of utilizing idle permanent labour is $0 (nil) .
Condition 3: Permanent Workforce at Full Capacity with Overtime Permitted
If permanent employees are fully occupied but management can schedule overtime shifts to complete the project, the incremental cash outflow is the overtime wage rate (basic wage plus overtime premium): Relevant Cost per Hour = Overtime Hourly Wage Rate \text{Relevant Cost per Hour} = \text{Overtime Hourly Wage Rate} Relevant Cost per Hour = Overtime Hourly Wage Rate
Condition 4: Permanent Workforce at Full Capacity with Overtime NOT Permitted (Diverted Labour)
If the workforce is working at 100% capacity and overtime cannot be worked (due to factory operating limits, union rules, or safety legislation), the only way to perform the project is to divert workers away from producing another profitable product (Product X).
Diverting labour causes the business to lose the sales revenue of Product X while saving Product X's direct materials and variable overheads. The net cash lost is Product X's contribution forgone : Contribution Forgone per Hour = Selling Price of Product X − Variable Costs of Product X Direct Labour Hours Required per Unit of Product X \text{Contribution Forgone per Hour} = \frac{\text{Selling Price of Product X} - \text{Variable Costs of Product X}}{\text{Direct Labour Hours Required per Unit of Product X}} Contribution Forgone per Hour = Direct Labour Hours Required per Unit of Product X Selling Price of Product X − Variable Costs of Product X
When evaluating the project, the relevant cost per direct labour hour is: Relevant Cost per Diverted Hour = Direct Wages Paid on Project + Contribution Forgone per Hour \text{Relevant Cost per Diverted Hour} = \text{Direct Wages Paid on Project} + \text{Contribution Forgone per Hour} Relevant Cost per Diverted Hour = Direct Wages Paid on Project + Contribution Forgone per Hour
Alternatively, if the company continues paying normal wages to the diverted workers, the incremental cash effect on the company as a whole is: Direct Wages Paid + Lost Contribution − Normal Wages Paid = Lost Contribution of Diverted Production \text{Direct Wages Paid} + \text{Lost Contribution} - \text{Normal Wages Paid} = \text{Lost Contribution of Diverted Production} Direct Wages Paid + Lost Contribution − Normal Wages Paid = Lost Contribution of Diverted Production . When preparing a full contract cost build-up where the contract is charged for labour wages, the candidate must add the opportunity cost (lost contribution) to the labor charge.
Tip
Always check whether the question asks for the total relevant cost to charge to the job (Direct Wages + Opportunity Cost) or the net change in company profit (Lost Contribution alone if wages are already committed).
3. Relevant Costs of Overheads
Overheads represent indirect production expenditures and are divided into variable and fixed categories:
Variable Production Overheads
Variable overheads (machine power, cutting lubricants, consumables) vary directly with production activity. If undertaking the project requires operating machines for 100 hours at a variable overhead rate of $4 per hour, the $400 expenditure represents an incremental cash outflow and is 100% relevant .
Fixed Production Overheads
General Factory / Corporate Fixed Overheads: Building rent, property rates, factory insurance, and departmental management salaries that are absorbed into production using standard rates are non-relevant . Total fixed spending does not change.
Directly Attributable Incremental Fixed Overheads: Fixed expenditures incurred specifically and exclusively for the contract—such as renting a specialized testing rig for $2,500 or hiring an external site safety supervisor for $1,800—are relevant .
4. Comprehensive Master Numerical Scenario: "Apex Engineering - Contract Titan"
Apex Engineering has received an invitation to submit a competitive tender for Contract Titan . The contract requires the following resources:
1. Direct Materials
Material Alpha: 800 kg required. Apex has 1,200 kg in inventory, purchased six months ago for $14 per kg. Material Alpha is used continuously in regular production. The current supplier replacement price is $18 per kg. Its scrap value is $9 per kg.
Material Beta: 400 units required. Apex holds 400 units in inventory from an aborted job. Original cost was $25 per unit. It has no ongoing use in normal production. It could be sold to a scrap merchant for $8 per unit. Alternatively, it could be modified using $3 per unit of labour to substitute for Material Gamma, which currently costs $16 per unit.
Material Delta: 250 litres required. None in stock. Must be purchased from an overseas supplier at $30 per litre plus $500 total freight for the batch.
Material Epsilon: 60 drums required. Apex has 60 drums in stock of an obsolete toxic solvent. Under environmental regulations, Apex must pay a hazardous waste contractor $10 per drum to dispose of it. Using it in Contract Titan safely consumes it without disposal fees.
2. Direct Labour
Department 1 (Unskilled): 500 hours required. The workforce consists of permanent employees paid $16 per hour. Due to a seasonal lull, Department 1 currently has 700 hours of idle time available.
Department 2 (Semi-Skilled): 300 hours required. The department operates at full capacity. Overtime is permitted and is paid at time-and-a-half ( $ 20 × 1.5 = $ 30 \text{\textdollar}20 \times 1.5 = \text{\textdollar}30 $ 20 × 1.5 = $ 30 per hour).
Department 3 (Skilled Technicians): 200 hours required. Technicians are paid $24 per hour and operate at 100% capacity. Overtime is strictly prohibited. The only way to fulfill Contract Titan is to divert technicians from producing standard Product Z. Product Z sells for $110, incurs direct materials of $40, variable overhead of $10, and requires 2 hours of Department 3 labour. Product Z's contribution after charging its labour is $110 − $40 − $10 − (2 × $24) = $12 per unit, or $6 per technician hour.
3. Overheads
Variable overhead is incurred at $5 per direct labour hour worked.
General factory fixed overhead is absorbed at a standard rate of $12 per direct labour hour.
Specialized diagnostic machinery must be hired specifically for Contract Titan at a cost of $3,200.
Step-by-Step Evaluation and Solution
Direct Materials Analysis:
Material Alpha: In regular use → \rightarrow → Relevant cost is current replacement price: 800 kg × $ 18 = $ 14 , 400 800 \text{ kg} \times \text{\textdollar}18 = \text{\textdollar}14,400 800 kg × $ 18 = $ 14 , 400 .
Material Beta: Obsolete stock. Compare scrap sale versus modification:
Scrap value: 400 × $ 8 = $ 3 , 200 400 \times \text{\textdollar}8 = \text{\textdollar}3,200 400 × $ 8 = $ 3 , 200 .
Net substitution value: 400 × ( $ 16 saved − $ 3 labour ) = 400 × $ 13 = $ 5 , 200 400 \times (\text{\textdollar}16 \text{ saved} - \text{\textdollar}3 \text{ labour}) = 400 \times \text{\textdollar}13 = \text{\textdollar}5,200 400 × ( $ 16 saved − $ 3 labour ) = 400 × $ 13 = $ 5 , 200 .
Higher alternative is substitution: Relevant cost is $5,200 .
Material Delta: Not in stock → \rightarrow → Current purchase price + freight: ( 250 litres × $ 30 ) + $ 500 = $ 7 , 500 + $ 500 = $ 8 , 000 (250 \text{ litres} \times \text{\textdollar}30) + \text{\textdollar}500 = \text{\textdollar}7,500 + \text{\textdollar}500 = \text{\textdollar}8,000 ( 250 litres × $ 30 ) + $ 500 = $ 7 , 500 + $ 500 = $ 8 , 000 .
Material Epsilon: Hazardous waste avoided → \rightarrow → Benefit / negative cost: 60 drums × − $ 10 = − $ 600 60 \text{ drums} \times -\text{\textdollar}10 = -\text{\textdollar}600 60 drums × − $ 10 = − $ 600 .
Total Relevant Direct Material Cost: $ 14 , 400 + $ 5 , 200 + $ 8 , 000 − $ 600 = $ 27 , 000 \text{\textdollar}14,400 + \text{\textdollar}5,200 + \text{\textdollar}8,000 - \text{\textdollar}600 = \text{\textdollar}27,000 $ 14 , 400 + $ 5 , 200 + $ 8 , 000 − $ 600 = $ 27 , 000 .
Direct Labour Analysis:
Department 1: Idle permanent workforce → \rightarrow → Relevant cost is $0 .
Department 2: Full capacity with overtime permitted → 300 hours × $ 30 = $ 9 , 000 \rightarrow 300 \text{ hours} \times \text{\textdollar}30 = \text{\textdollar}9,000 → 300 hours × $ 30 = $ 9 , 000 .
Department 3: Full capacity with labour diverted from Product Z:
Direct wages paid: 200 hours × $ 24 = $ 4 , 800 200 \text{ hours} \times \text{\textdollar}24 = \text{\textdollar}4,800 200 hours × $ 24 = $ 4 , 800 .
Lost contribution from Product Z: Units of Z lost = 200 hours 2 hours/unit = 100 units \text{Units of Z lost} = \frac{200 \text{ hours}}{2 \text{ hours/unit}} = 100 \text{ units} Units of Z lost = 2 hours/unit 200 hours = 100 units Contribution per unit of Z = Selling Price − Variable Costs = $ 110 − $ 40 − $ 10 − ( 2 × $ 24 ) = $ 12 \text{Contribution per unit of Z} = \text{Selling Price} - \text{Variable Costs} = \text{\textdollar}110 - \text{\textdollar}40 - \text{\textdollar}10 - (2 \times \text{\textdollar}24) = \text{\textdollar}12 Contribution per unit of Z = Selling Price − Variable Costs = $ 110 − $ 40 − $ 10 − ( 2 × $ 24 ) = $ 12 Total Lost Contribution = 100 units × $ 12 = $ 1 , 200 \text{Total Lost Contribution} = 100 \text{ units} \times \text{\textdollar}12 = \text{\textdollar}1,200 Total Lost Contribution = 100 units × $ 12 = $ 1 , 200
Total relevant cost of Dept 3: $ 4 , 800 wages + $ 1 , 200 opportunity cost = $ 6 , 000 \text{\textdollar}4,800 \text{ wages} + \text{\textdollar}1,200 \text{ opportunity cost} = \text{\textdollar}6,000 $ 4 , 800 wages + $ 1 , 200 opportunity cost = $ 6 , 000 .
Total Relevant Direct Labour Cost: $ 0 + $ 9 , 000 + $ 6 , 000 = $ 15 , 000 \text{\textdollar}0 + \text{\textdollar}9,000 + \text{\textdollar}6,000 = \text{\textdollar}15,000 $ 0 + $ 9 , 000 + $ 6 , 000 = $ 15 , 000 .
Overheads Analysis:
Variable Overheads: Incurred on incremental hours worked:
- Dept 1 hours worked on contract: 500 hours
- Dept 2 hours worked on contract: 300 hours
- Dept 3 hours worked on contract: 200 hours
Total hours = 500 + 300 + 200 = 1 , 000 hours × $ 5 = $ 5 , 000 500 + 300 + 200 = 1,000 \text{ hours} \times \text{\textdollar}5 = \text{\textdollar}5,000 500 + 300 + 200 = 1 , 000 hours × $ 5 = $ 5 , 000 . (Product Z's own variable overhead is already reflected in the $12 contribution forgone, so the contract is charged the variable overhead on all 1,000 hours it actually uses.)
General Absorbed Fixed Overhead: Standard rate of $12/hour is non-relevant: $0 .
Specific Diagnostic Machine Hire: Directly attributable incremental fixed cost: $3,200 .
Total Relevant Overheads: $ 5 , 000 + $ 3 , 200 = $ 8 , 200 \text{\textdollar}5,000 + \text{\textdollar}3,200 = \text{\textdollar}8,200 $ 5 , 000 + $ 3 , 200 = $ 8 , 200 .
Total Relevant Cost of Contract Titan: Total Relevant Cost = $ 27 , 000 (Materials) + $ 15 , 000 (Labour) + $ 8 , 200 (Overheads) = $ 50 , 200 \text{Total Relevant Cost} = \text{\textdollar}27,000 \text{ (Materials)} + \text{\textdollar}15,000 \text{ (Labour)} + \text{\textdollar}8,200 \text{ (Overheads)} = \text{\textdollar}50,200 Total Relevant Cost = $ 27 , 000 (Materials) + $ 15 , 000 (Labour) + $ 8 , 200 (Overheads) = $ 50 , 200