1.2 Senate Bill 25-165, Apprentice Supervision & Colorado Board Rules

Colorado Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Colorado Electrical Licensing Laws, DORA Rules & Exam Logistics

1.1 Colorado Electrical Board, Licensure Tiers & Application Process 1.2 Senate Bill 25-165, Apprentice Supervision & Colorado Board Rules 1.3 Permitting, Inspection Procedures, Violations & Penalties 1.4 The Colorado PSI Exam: Open-Book Format, Time Management & Code Navigation

2 Chapter 2: Electrical Theory, Mathematics & Fundamental Concepts

2.1 Ohm's Law, Joule's Law & DC Circuit Analysis 2.2 AC Fundamentals: Inductance, Capacitance & Power Factor 2.3 Three-Phase Electrical Systems: Wye & Delta Configurations 2.4 Voltage Drop Principles & Single/Three-Phase Formulas

3 Chapter 3: General Installation Requirements — NEC Articles 90 & 110

3.1 NEC Structure, Arrangement & Article 90 Fundamentals 3.2 Key Article 100 Definitions for the Exam 3.3 Equipment Examination, Listing & Termination Temperature Limits 3.4 Working Space, Dedicated Electrical Space & Guarding

4 Chapter 4: Branch Circuits & Feeders — NEC Articles 210, 215 & 225

4.1 Branch-Circuit Ratings, Conductor Sizing & Multiwire Branch Circuits 4.2 Dwelling Unit Required Outlets & Receptacle Placement 4.3 Ground-Fault Circuit-Interrupter (GFCI) Protection 4.4 Arc-Fault Circuit-Interrupter (AFCI) Protection & Feeder Rules

5 Chapter 5: Services & Overcurrent Protection — NEC Articles 230, 240 & 242

5.1 Service Conductors, Clearances & Overhead/Underground Drops 5.2 Service Disconnecting Means, Ratings & Surge Protection 5.3 Overcurrent Protection Fundamentals & Standard Ratings 5.4 Feeder & Transformer Tap Rules

6 Chapter 6: Grounding and Bonding — NEC Article 250 Part I (Systems & Electrodes)

6.1 Grounding vs. Bonding: Principles, Functions & Article 250 Architecture 6.2 Grounded Conductors, Main Bonding Jumpers & System Bonding Jumpers 6.3 The Grounding Electrode System 6.4 Grounding Electrode Conductor (GEC) Sizing & Installation

7 Chapter 7: Grounding and Bonding — NEC Article 250 Part II (Equipment & Special Systems)

7.1 Equipment Grounding Conductors (EGC) Types & Identification 7.2 Sizing the Equipment Grounding Conductor 7.3 Separately Derived Systems 7.4 Grounding & Bonding at Separate Buildings or Structures

8 Chapter 8: Wiring Methods & Materials — NEC Chapter 3

8.1 General Wiring Requirements & Underground Installations 8.2 Nonmetallic and Armored Cable Assemblies 8.3 Metallic and Nonmetallic Raceways 8.4 Cable Trays, Wireways, Auxiliary Gutters & Surface Raceways

9 Chapter 9: Conductors, Ampacity & Wire Sizing — NEC Article 310

9.1 Conductor Properties, Insulation Types & NEC Table 310.16 9.2 Temperature Correction Factors 9.3 Conductor Bundling & Adjustment Factors 9.4 Comprehensive Conductor Sizing & Terminal Temperature Coordination

10 Chapter 10: Box Fill, Conduit Fill & Pull Box Calculations

10.1 Outlet and Device Box Fill Calculations — NEC 314.16(A) & (B) 10.2 Conduit Fill Calculations — Chapter 9 Tables 1, 4, 5 & Annex C 10.3 Pull and Junction Box Sizing for Conductors 4 AWG and Larger — NEC 314.28 10.4 Practical Enclosure & Raceway Sizing Exam Scenarios

11 Chapter 11: Load Calculations — Dwellings & Commercial Buildings — NEC Article 120

11.1 General Lighting, Small Appliance & Laundry Loads 11.2 Fixed Appliances, Dryers & Cooking Equipment Calculations 11.3 Standard vs. Optional Calculation Methods for Single-Family Dwellings 11.4 Commercial & Multifamily Load Calculations

12 Chapter 12: Motors, Motor Circuits & Controllers — NEC Article 430

12.1 Motor Nameplate vs. NEC Tables & Motor Full-Load Current 12.2 Sizing Motor Branch-Circuit Conductors & Overload Protection 12.3 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection 12.4 Motor Feeders, Disconnecting Means & Controllers

13 Chapter 13: Transformers, Distribution & Utilization Equipment

13.1 Transformer Overcurrent Protection & Installation — NEC Article 450 13.2 Panelboards, Switchboards & Switchgear — NEC Article 408 13.3 Luminaires, Appliances & Fixed Electric Space Heating 13.4 Generators, Transfer Switches & Standby Systems

14 Chapter 14: Special Occupancies, Renewable Energy & Modern Technologies

14.1 Hazardous (Classified) Locations — NEC Articles 500-516 14.2 Health Care Facilities & Places of Assembly — NEC Articles 517 & 518 14.3 Swimming Pools, Spas, Hot Tubs & Fountains — NEC Article 680 14.4 Solar Photovoltaic (PV) Systems & Energy Storage — NEC Articles 690, 705 & 706

1.2 Senate Bill 25-165, Apprentice Supervision & Colorado Board Rules

Key Takeaways Explain This Topic AI

C.R.S. 12-115-115(1) caps supervision at three apprentices per licensed electrician at a job site, and the cap is identical for residential, commercial, industrial, and multifamily work.

C.R.S. 12-115-103(2.5) defines direct supervision as the supervising licensed electrician being physically present at the same physical address where the apprentice is working.

Senate Bill 25-165 took effect August 6, 2025; it defined photovoltaic electrical work, set a December 31, 2026 photovoltaic installer registration deadline, and widened the 288-hour training window from four years to eight.

Electrical contractors must register an apprentice within thirty days of initial employment and report each apprentice's cumulative practical and classroom hours to the Board by January 1 each year.

The Board's fine schedule penalizes failure to maintain the one-electrician-to-three-apprentices ratio at $375 for a first offense, $600 for a second, and up to $2,000 per day thereafter.

Last updated: September 2026

1.2 Senate Bill 25-165, Apprentice Supervision & Colorado Board Rules

Exam Fast Fact: Colorado has one apprentice supervision limit and it applies everywhere. Under C.R.S. 12-115-115(1) , "a licensed electrician shall not directly supervise more than three apprentices at a job site." There is no separate commercial ratio and no separate residential ratio. Two licensed electricians on a job site may directly supervise up to six apprentices; three may supervise up to nine. Remote supervision by phone, radio, or video does not count at all.

Colorado enforces electrical safety at the jobsite, not just in the code book. Two rules do most of the work: a hard numerical cap on how many apprentices one licensed electrician may supervise, and a strict statutory definition of what "supervision" means.

Senate Bill 25-165: What the 2025 Act Actually Did

Senate Bill 25-165, "Licensure of Electricians," was signed by the Governor on June 3, 2025 and took effect August 6, 2025 . It is an amendment to the Electricians Practice Act — not a sunset continuation bill — and it did not change Colorado's supervision limit. Its substantive changes:

Change Effect Where it lands

Photovoltaic electrical work defined Adds a statutory definition of electrical work performed on a photovoltaic system that is covered electrical work under the National Electrical Code C.R.S. 12-115-103

Photovoltaic installer registration Contractors performing photovoltaic work with NABCEP-certified employees must register with the Board no later than December 31, 2026 C.R.S. 12-115-110

Board authority over PV work Gives the Board authority to regulate photovoltaic electrical work for installations under 300 kilowatts ; work at or above 300 kW must comply with permitting, be performed by an electrical contractor, include contemporaneous review, and be subject to state compliance checks C.R.S. 12-115-107, 12-115-119

288-hour training window widened The 288 hours of safety and NEC training may now be earned during the last eight years of the applicant's experience, up from the last four years C.R.S. 12-115-110(2)(a)(III)

PV training may substitute for experience Photovoltaic installation training may be credited toward required practical experience C.R.S. 12-115-110(2)(b)

Work-experience credit becomes discretionary The Board may , rather than shall , grant work experience credit for academic or military training C.R.S. 12-115-110(2)(b)(II)

Apprentice reporting and data sharing Contractors and registered apprenticeship programs report each apprentice's name, contact information, and cumulative practical training and certified classroom hours to the Board by January 1 each year C.R.S. 12-115-115(3)(c)

"Direct supervision" extended The statutory definition of direct supervision now names the photovoltaic installer alongside the master electrician, journeyman electrician, and residential wireman C.R.S. 12-115-103(2.5)

Trap to avoid: SB 25-165 is frequently described online as a sunset review that "reauthorized the Board through 2034" and "imposed a 1:1 commercial supervision ratio." Neither claim is in the act. The Board's continuation is handled separately under the sunset provisions at C.R.S. 12-115-105, and the supervision limit in 12-115-115(1) was unchanged by SB 25-165.

The Supervision Limit: One Licensed Electrician to Three Apprentices

C.R.S. 12-115-115(1) contains two independent requirements:

A person may work as an apprentice, but shall not do any electrical wiring for the installation of electrical apparatus or equipment for light, heat, or power except under the direct supervision of a licensed electrician .

A licensed electrician shall not directly supervise more than three apprentices at a job site. SUPERVISION MATH (C.R.S. 12-115-115(1))

  • +----------------------------+--------------------------------+
  • | Licensed electricians | Maximum registered apprentices |
  • | directly supervising | performing electrical wiring |
  • +----------------------------+--------------------------------+
  • | 1 | 3 |
  • | 2 | 6 |
  • | 3 | 9 |
  • +----------------------------+--------------------------------+
  • Same limit for residential, commercial, industrial, and

multifamily work. The occupancy class does not change it.

The Board's own fine schedule confirms the number. It lists the violation as "Failure of an electrical contractor to maintain a supervisory ratio of one licensed electrician to three apprentices," citing 12-115-115(1), at $375 for a first offense, $600 for a second, and up to $2,000 per day for subsequent offenses. A separate line item penalizes "Failure of a licensed electrician to supervise an apprentice" at the same $375 / $600 / up to $2,000-per-day levels.

The Legal Standard of "Direct Supervision"

Colorado does not leave supervision to interpretation. C.R.S. 12-115-103(2.5) defines it in a single sentence:

"Direct supervision" means that the supervising licensed master electrician, journeyman electrician, residential wireman, or photovoltaic installer is physically present at the same physical address where the apprentice is working.

Three consequences follow directly from the words "physically present at the same physical address":

Field practice Compliant? Why

The journeyman is working on the third floor while the apprentice pulls branch-circuit conductors on the sixth floor of the same building. Yes Same physical address. The statute sets a location test, not a line-of-sight test.

The journeyman is running a job in Boulder and coaches the apprentice in Longmont by phone and video. No Different physical address. Electronic contact is not physical presence.

The journeyman drops the apprentice at the site at 7:00 a.m., reviews the prints, leaves for another job, and returns at 4:30 p.m. No The apprentice performed electrical wiring for most of the day with no licensed electrician at the address.

One journeyman supervises four registered apprentices at a single job site. No The fourth apprentice exceeds the three-apprentice cap in 12-115-115(1).

An unlicensed, unregistered worker installs boxes and pulls wire alongside a journeyman. No The worker is not a registered apprentice. This is unlicensed practice by the worker and failure to supervise by the licensee.

Responsibility flows upward. Under 12-115-115(2) , the electrical contractor, journeyman, master, or residential wireman who employs or directly supervises the apprentice is responsible for the work the apprentice performs , and the Board may discipline that licensee under 12-115-122 for the apprentice's improper work. The apprentice's registration is separately subject to discipline.

Apprentice Registration, Records, and Annual Reporting

Apprentice registration is an administrative obligation on the employer , not only on the apprentice.

1. Registration Within Thirty Days of Hire

C.R.S. 12-115-115(3)(a) requires the electrical contractor to register the apprentice with the Board within thirty days after initial employment . The employer must also remove an apprentice who is no longer employed from the apprenticeship program and notify the Board annually of the termination. Board rules require that experience verification forms be provided within 30 days after an employee leaves.

2. Contemporaneous Hour Records by Category

Board Rule 1.7 requires experience to be documented on the Board's Affidavit of Experience , broken out by work performed in commercial, residential, industrial, and maintenance/service categories and reported in increments of hours and months, signed by the master electrician for, or a signatory authority of, the electrical contractor or employer. Applicants may not verify their own experience.

3. Annual Reporting to the Board (New Under SB 25-165)

By January 1 each year , an electrical contractor, a United States Department of Labor registered apprenticeship program, or a recognized state apprenticeship agency that employs an apprentice in Colorado must report to the Board each apprentice's name, contact information, and cumulative practical training hours and certified classroom hours completed toward the journeyman requirements in 12-115-110. The Board keeps that information confidential except to the apprentice through the apprentice's own registration account.

4. Photovoltaic Experience Credit

Only certain direct-current-side photovoltaic tasks count toward electrical experience. Board rules credit qualifying photovoltaic work at two hours of PV work per one hour of electrical experience, capped at 2,000 hours . Alternating-current-side connections must be performed under proper electrical contractor registration.

State Licensing Authority and Home Rule Municipalities

Colorado is a home rule state under Article XX of the Colorado Constitution , and cities such as Denver, Colorado Springs, Aurora, Fort Collins, and Boulder operate their own building departments. The boundaries between state and local authority are well settled: +-------------------------------------------------------------+

  • | 1. STATE LICENSING AUTHORITY (C.R.S. Title 12, Article 115) |
  • | - Trade licensing and examination are statewide. |
  • | - Local governments do not license electricians or set |
  • | apprentice supervision limits. |
  • +-------------------------------------------------------------+
  • | 2. MINIMUM CODE FLOOR (Board Rule 1.5 / 3 CCR 710-1) |
  • | - The Board-incorporated NEC edition is the statewide |
  • | minimum installation standard. |
  • | - Local amendments may be more restrictive, not less. |
  • +-------------------------------------------------------------+
  • | 3. LOCAL ADMINISTRATIVE AUTHORITY |
  • | - Local permits, fees, and inspections. |
  • | - Local business licensing and contractor registration. |
  • +-------------------------------------------------------------+

The general assembly has declared it a matter of statewide concern that people performing electrical work have the necessary skills, and it expressly identified Board enforcement of the licensing requirements and of "the limits on the number of apprentices a licensed electrician is permitted to supervise specified in section 12-115-115(1)" as essential to public safety (C.R.S. 12-115-119(3)(a)). The Board directs its compliance staff to run compliance checks on projects statewide — regardless of whether the permit was issued by the Board, a town, a city, a county, or a state institution of higher education — verifying both licensure and the supervisor-to-apprentice ratio.

Board Rules and Colorado Code Amendments (3 CCR 710-1)

The Board's rules supplement the National Electrical Code rather than replacing it:

Rule 1.5, Incorporation by Reference. The Board incorporates NFPA 70, the National Electrical Code, 2026 Edition , as the statewide minimum installation standard, effective August 1, 2026 . The rule expressly excludes later amendments or editions, so the adopted edition changes only by rulemaking.

Equipment approval. Under Board Rule 1.9(B), the Board accepts conductors and equipment tested and listed by a recognized testing agency such as UL, or field-evaluated by a certified Field Evaluation Body under NFPA 790 and 791 with accreditation from the International Accreditation Service or equivalent. Inspectors retain the right to reject equipment they judge unsafe.

Electric-ready and solar-ready requirements. Under HB 23-1233 and C.R.S. 12-115-107(3)(a), the Board requires permit applicants to comply with the electric vehicle power transfer infrastructure requirements for multifamily buildings in the Model Electric Ready and Solar Ready Code.

Continuing education. Active licensees complete 24 hours of continuing education each three-year renewal period, including at least 4 hours on NEC changes , with no more than 4 hours credited to safety training. Online courses must be interactive and delivered by an approved Attesting Provider.