Study guide

3.1 NEC Structure, Arrangement & Article 90 Fundamentals

Colorado Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Colorado Electrical Licensing Laws, DORA Rules & Exam Logistics

1.1 Colorado Electrical Board, Licensure Tiers & Application Process 1.2 Senate Bill 25-165, Apprentice Supervision & Colorado Board Rules 1.3 Permitting, Inspection Procedures, Violations & Penalties 1.4 The Colorado PSI Exam: Open-Book Format, Time Management & Code Navigation

2 Chapter 2: Electrical Theory, Mathematics & Fundamental Concepts

2.1 Ohm's Law, Joule's Law & DC Circuit Analysis 2.2 AC Fundamentals: Inductance, Capacitance & Power Factor 2.3 Three-Phase Electrical Systems: Wye & Delta Configurations 2.4 Voltage Drop Principles & Single/Three-Phase Formulas

3 Chapter 3: General Installation Requirements — NEC Articles 90 & 110

3.1 NEC Structure, Arrangement & Article 90 Fundamentals 3.2 Key Article 100 Definitions for the Exam 3.3 Equipment Examination, Listing & Termination Temperature Limits 3.4 Working Space, Dedicated Electrical Space & Guarding

4 Chapter 4: Branch Circuits & Feeders — NEC Articles 210, 215 & 225

4.1 Branch-Circuit Ratings, Conductor Sizing & Multiwire Branch Circuits 4.2 Dwelling Unit Required Outlets & Receptacle Placement 4.3 Ground-Fault Circuit-Interrupter (GFCI) Protection 4.4 Arc-Fault Circuit-Interrupter (AFCI) Protection & Feeder Rules

5 Chapter 5: Services & Overcurrent Protection — NEC Articles 230, 240 & 242

5.1 Service Conductors, Clearances & Overhead/Underground Drops 5.2 Service Disconnecting Means, Ratings & Surge Protection 5.3 Overcurrent Protection Fundamentals & Standard Ratings 5.4 Feeder & Transformer Tap Rules

6 Chapter 6: Grounding and Bonding — NEC Article 250 Part I (Systems & Electrodes)

6.1 Grounding vs. Bonding: Principles, Functions & Article 250 Architecture 6.2 Grounded Conductors, Main Bonding Jumpers & System Bonding Jumpers 6.3 The Grounding Electrode System 6.4 Grounding Electrode Conductor (GEC) Sizing & Installation

7 Chapter 7: Grounding and Bonding — NEC Article 250 Part II (Equipment & Special Systems)

7.1 Equipment Grounding Conductors (EGC) Types & Identification 7.2 Sizing the Equipment Grounding Conductor 7.3 Separately Derived Systems 7.4 Grounding & Bonding at Separate Buildings or Structures

8 Chapter 8: Wiring Methods & Materials — NEC Chapter 3

8.1 General Wiring Requirements & Underground Installations 8.2 Nonmetallic and Armored Cable Assemblies 8.3 Metallic and Nonmetallic Raceways 8.4 Cable Trays, Wireways, Auxiliary Gutters & Surface Raceways

9 Chapter 9: Conductors, Ampacity & Wire Sizing — NEC Article 310

9.1 Conductor Properties, Insulation Types & NEC Table 310.16 9.2 Temperature Correction Factors 9.3 Conductor Bundling & Adjustment Factors 9.4 Comprehensive Conductor Sizing & Terminal Temperature Coordination

10 Chapter 10: Box Fill, Conduit Fill & Pull Box Calculations

10.1 Outlet and Device Box Fill Calculations — NEC 314.16(A) & (B) 10.2 Conduit Fill Calculations — Chapter 9 Tables 1, 4, 5 & Annex C 10.3 Pull and Junction Box Sizing for Conductors 4 AWG and Larger — NEC 314.28 10.4 Practical Enclosure & Raceway Sizing Exam Scenarios

11 Chapter 11: Load Calculations — Dwellings & Commercial Buildings — NEC Article 120

11.1 General Lighting, Small Appliance & Laundry Loads 11.2 Fixed Appliances, Dryers & Cooking Equipment Calculations 11.3 Standard vs. Optional Calculation Methods for Single-Family Dwellings 11.4 Commercial & Multifamily Load Calculations

12 Chapter 12: Motors, Motor Circuits & Controllers — NEC Article 430

12.1 Motor Nameplate vs. NEC Tables & Motor Full-Load Current 12.2 Sizing Motor Branch-Circuit Conductors & Overload Protection 12.3 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection 12.4 Motor Feeders, Disconnecting Means & Controllers

13 Chapter 13: Transformers, Distribution & Utilization Equipment

13.1 Transformer Overcurrent Protection & Installation — NEC Article 450 13.2 Panelboards, Switchboards & Switchgear — NEC Article 408 13.3 Luminaires, Appliances & Fixed Electric Space Heating 13.4 Generators, Transfer Switches & Standby Systems

14 Chapter 14: Special Occupancies, Renewable Energy & Modern Technologies

14.1 Hazardous (Classified) Locations — NEC Articles 500-516 14.2 Health Care Facilities & Places of Assembly — NEC Articles 517 & 518 14.3 Swimming Pools, Spas, Hot Tubs & Fountains — NEC Article 680 14.4 Solar Photovoltaic (PV) Systems & Energy Storage — NEC Articles 690, 705 & 706

3.1 NEC Structure, Arrangement & Article 90 Fundamentals

Key Takeaways Explain This Topic AI

Colorado incorporates the 2026 National Electrical Code by reference in Board Rule 1.5 of 3 CCR 710-1, effective August 1, 2026, and PSI examinations given on or after that date are written to the 2026 edition.

The 2026 edition relocated load calculations from Article 220 to Article 120 and energy management systems from Article 750 to Article 130, both into Chapter 1, with section suffixes preserved.

Chapter 8 no longer stands alone: in the 2026 NEC, Chapters 1 through 7 apply to communications systems and Chapter 8 provisions may apply to other installations.

NEC 90.1 establishes that the Code exists solely for the practical safeguarding of persons and property from electrical hazards; it is neither an instruction manual for untrained persons nor a design specification for future expansion.

Mandatory rules use 'shall' or 'shall not', whereas permissive rules use 'shall be permitted' or 'shall not be required'; Informational Notes contain explanatory material and are not enforceable requirements.

Last updated: September 2026

3.1 NEC Structure, Arrangement & Article 90 Fundamentals

To pass the Colorado Journeyman Electrician examination administered by PSI, you must understand not only individual Code rules, but also the legal framework, internal hierarchy, and jurisdictional boundaries governing the National Electrical Code (NEC). Article 90 serves as the administrative introduction and foundational charter of the NEC. It dictates how the entire book is arranged, what falls under its jurisdiction, what is excluded, and how the Authority Having Jurisdiction (AHJ) enforces its mandates.

Which edition are you tested on? The 2026 NEC . The Colorado State Electrical Board incorporates NFPA 70 by reference in Board Rule 1.5 of 3 CCR 710-1, and the Board adopted the 2026 edition effective August 1, 2026 . PSI examinations given on or after that date are written to the 2026 NEC, and the codebook PSI supplies at your test station is the 2026 edition. Colorado's license renewal cycle is deliberately tied to this adoption: licenses expire September 30 every three years so the cycle tracks the Code.

What Moved in the 2026 NEC

The 2026 edition made structural changes that will cost you time on an open-book exam if you go hunting in the wrong chapter. Learn the relocations before you learn anything else.

Content 2023 Location 2026 Location

Branch-circuit, feeder, and service load calculations Article 220 (Chapter 2) Article 120 (Chapter 1) — suffixes preserved, so 220.82 is now 120.82 and Table 220.55 is Table 120.55

Energy management systems Article 750 (Chapter 7) Article 130 (Chapter 1)

Branch circuits, feeders, and services over 1000 V ac / 1500 V dc Article 235 Article 235 deleted; split into 265 (branch circuits), 266 (feeders), 267 (outside branch circuits and feeders), 268 (services)

  • Grounding and bonding over 1000 V ac / 1500 V dc Article 250, Part X Article 270
  • Emergency disconnects at one- and two-family dwellings Article 230.85 Deleted; absorbed into 230.70

Limited-energy and power-limited systems Scattered through Chapters 7 and 8 Consolidated into the new 720-750 series

Two other headline changes matter for calculations and for services: the dwelling unit general lighting load fell from 3 VA to 2 VA per square foot in 120.41 (with new 120.13 keeping the branch-circuit count at 3 VA per square foot), and the service disconnect for a one- or two-family dwelling must now be in a readily accessible outdoor location under 230.70(A)(1).

Purpose of the National Electrical Code (NEC 90.1)

The National Electrical Code is published by the National Fire Protection Association (NFPA 70). Its singular purpose is articulated in NEC 90.1(A) : the practical safeguarding of persons and property from hazards arising from the use of electricity .

Every candidate must recognize what the Code is—and what it is not :

Not an Instruction Manual (NEC 90.1(C)): The NEC is not intended as an instruction manual for untrained persons. It assumes that the installer or designer possesses foundational electrical training, theoretical comprehension, and trade competence.

Adequacy vs. Future Expansion (NEC 90.1(B)): Compliance with the NEC produces an installation that is essentially free from hazard , but not necessarily efficient, convenient, or adequate for good service or future expansion of electrical use. An installation designed strictly to minimum Code requirements may lack spare capacity, convenience outlets, or energy efficiency. Hazards often arise when an initial installation is not designed for future growth, leading to unauthorized overloads and makeshift wiring extensions.

Not a Design Specification: The NEC does not dictate optimal performance; it dictates safety minimums.

Scope: What the Code Covers vs. What It Does Not (NEC 90.2)

NEC 90.2 delineates the precise jurisdictional scope of the Code. On the Colorado exam, questions frequently test your ability to distinguish between covered installations and statutory exemptions.

Covered Installations (NEC 90.2(A))

The NEC applies to the installation of electrical conductors, equipment, and raceways; signaling and communications conductors, equipment, and raceways; and optical fiber cables and raceways for:

Public and private premises, including buildings, structures, mobile homes, recreational vehicles, and floating buildings.

Yards, lots, parking lots, carnivals, and industrial substations.

Installations of conductors and equipment that connect to the supply of electricity.

Installations used by electric utilities—such as office buildings, warehouses, garages, machine shops, and recreational buildings —that are not an integral part of a generating plant, substation, or control center.

Installations Not Covered (NEC 90.2(B))

The NEC explicitly does not apply to:

Marine and Railway Craft: Installations in ships, watercraft other than floating buildings, railway rolling stock, aircraft, or automotive vehicles (other than mobile homes and recreational vehicles).

Underground Mines: Installations underground in mines and self-propelled mobile surface mining equipment and its attendant electrical trailing cable.

Railways for Transportation: Installations of railways for generation, transformation, transmission, or distribution of power used exclusively for operation of rolling stock or installations used exclusively for signaling and communications.

Communications Utilities: Installations of communications equipment under the exclusive control of communications utilities located outdoors or in building spaces used exclusively for such installations.

Electric Utilities (Core Facilities): Installations under the exclusive control of an electric utility where such installations consist of service drops or laterals, are on dedicated utility easements or rights-of-way, or are located in generating plants, substations, or control centers.

  • Facility or Installation Type Covered by NEC? Code Citation Rationale / Key Exam Distinction
  • Commercial Retail Store YES 90.2(A)(1) Public/private commercial premises
  • Electric Utility Headquarters / Office YES 90.2(A)(5) Non-generation/distribution utility building
  • Utility Transmission Line on Right-of-Way NO 90.2(B)(5) Dedicated utility easement/exclusive control
  • Underground Coal Mine Haulage Tunnel NO 90.2(B)(2) Mining installations under MSHA jurisdiction
  • Floating Home permanently moored YES 90.2(A)(1) Floating buildings covered per Article 553
  • Recreational Vehicle (RV) Interior Wiring YES 90.2(A)(1) Mobile homes and RVs covered per Article 551
  • Commercial Cargo Ship Generator System NO 90.2(B)(1) Marine vessels excluded from NEC scope

Exam Trap: Watch out for questions regarding electric power utilities. If the question asks about a utility-owned substation, power plant, or high-voltage transmission line on a public right-of-way , the NEC does not cover it (governed instead by the National Electrical Safety Code, NESC). However, if the question specifies a utility corporate office, customer service center, or storage warehouse , it is fully covered by the NEC under 90.2(A)(5)!

Code Arrangement Hierarchy (NEC 90.3)

NEC 90.3 is the most critical organizational blueprint in the Code. Mastering this hierarchy enables rapid cross-referencing during the open-book portion of the Colorado PSI examination. ┌─────────────────────────────────────────┐

  • │ NEC 90.3 CODE HIERARCHY │
  • └─────────────────────────────────────────┘
  • │
  • ┌────────────────────────────────┴────────────────────────────────┐
  • ▼ ▼
  • ┌──────────────────────────────┐ ┌──────────────────────────────┐
  • │ GENERAL CHAPTERS │ │ SPECIAL CHAPTERS │
  • │ Chapters 1 - 4 │ │ Chapters 5 - 7 │
  • │ • Apply generally to ALL │ │ • Supplement or MODIFY │
  • │ electrical installations │ │ Chapters 1 through 4 │
  • │ • Ch 1: General (100, 110) │ │ • Ch 5: Special Occupancies │
  • │ • Ch 2: Wiring & Protection │ │ • Ch 6: Special Equipment │
  • │ • Ch 3: Wiring Methods │ │ • Ch 7: Special Conditions │
  • │ • Ch 4: Equipment for Gen. │ │ │
  • └──────────────────────────────┘ └──────────────────────────────┘
  • │ │
  • └────────────────────────────────┬────────────────────────────────┘
  • │
  • ┌────────────────────────────────┼────────────────────────────────┐
  • ▼ ▼ ▼
  • ┌──────────────────────────────┐ ┌──────────────────────────────┐ ┌──────────────────────────────┐
  • │ COMMUNICATIONS (CH 8) │ │ TABLES (CHAPTER 9) │ │ INFORMATIVE ANNEXES │
  • │ • 2026: NO LONGER │ │ • Enforceable ONLY when │ │ • Annexes A through L │
  • │ standalone │ │ specifically referenced │ │ • For informational use │
  • │ • Chapters 1-7 now apply │ │ in Chapters 1 through 8 │ │ • NOT part of enforceable │
  • │ to Chapter 8, and vice │ │ • Conduit fill, properties │ │ Code requirements │
  • │ versa │ │ │ │ │
  • └──────────────────────────────┘ └──────────────────────────────┘ └──────────────────────────────┘

The Four Structural Rules of 90.3:

Chapters 1, 2, 3, and 4 apply generally: Unless modified by subsequent chapters, rules in Chapters 1 through 4 apply across every installation.

Chapters 5, 6, and 7 supplement or modify: Chapter 5 (Special Occupancies, e.g., hazardous locations, health care facilities), Chapter 6 (Special Equipment, e.g., electric vehicle chargers, solar PV, cranes), and Chapter 7 (Special Conditions, e.g., emergency standby systems) modify or add to the general rules in Chapters 1 through 4. For instance, while Article 300 generally permits Romex (NM cable) in residential walls, Article 501 (Class I hazardous locations) modifies this rule by prohibiting nonmetallic cable.

Chapter 8 — Integrated in the 2026 NEC (Communications Systems): For decades Chapter 8 stood apart: it applied to communications systems only, and the rest of the Code reached it only where Chapter 8 specifically said so. The 2026 edition ended that isolation. Chapters 1 through 7 now apply to Chapter 8, and Chapter 8 provisions may apply elsewhere. The practical consequences show up immediately in the field: Chapter 3 wiring method rules such as securing and supporting a raceway now apply to communications installations, and the working space requirements of 110.26 apply in front of communications equipment. If you learned the old "Chapter 8 stands alone" rule, unlearn it before test day — it is a favorite way to write a distractor.

Chapter 9 Tables: Tables in Chapter 9 (such as Table 1 for conduit fill percentages, Table 4 for conduit dimensions, Table 5 for conductor dimensions, and Table 8 for conductor DC resistance) are enforceable only where specifically cited by an NEC section.

Informative Annexes: The annexes provide calculation examples (Annex D), conduit fill lookup tables (Annex C), and application guides. They are strictly informative and carry no enforcement power unless the adopting jurisdiction says otherwise. The 2026 edition revised Annex D to track the new Article 120 dwelling calculations and added a new Informative Annex L outlining the wholesale restructuring planned for the 2029 edition.

Mandatory Rules, Permissive Rules & Explanatory Material (NEC 90.5)

The NEC is written in precise legal and technical syntax categorized into three distinct rule classifications:

Mandatory Rules (NEC 90.5(A)): Characterize actions that are specifically required or forbidden. Mandatory rules employ the terms "shall" (must be done) or "shall not" (strictly prohibited).

Permissive Rules (NEC 90.5(B)): Characterize actions that are allowed but not required. They represent options, alternatives, or exceptions. Permissive rules employ the terms "shall be permitted" or "shall not be required" .

Explanatory Material (NEC 90.5(C)): Informational Notes (formerly Fine Print Notes or FPNs) contain explanatory, background, or cross-referencing information. Informational Notes are not enforceable requirements of the Code. If an exam question asks whether an Informational Note is mandatory, the answer is always no .

Enforcement, Interpretation & The Role of the AHJ (NEC 90.4)

Under NEC 90.4 , the Code is intended for suitable enforcement by governmental bodies and inspection agencies. The Authority Having Jurisdiction (AHJ) is the organization, office, or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure.

Statutory Powers of the AHJ:

Interpretation: The AHJ has the sole authority for interpreting the rules of the Code.

Approval: The AHJ decides on the approval of equipment and materials per NEC 90.4 and 110.2.

Special Permission (Article 100 Definition): The AHJ can grant "special permission" to waive specific requirements or permit alternative methods where equivalent safety is maintained. By definition in Article 100, Special Permission is the written consent of the Authority Having Jurisdiction . Verbal agreements or jobsite nods never constitute special permission under the Code.

Alternative Methods and Materials (NEC 90.4(C)): By special permission, the AHJ may waive specific requirements in this Code or permit alternative methods where it is assured that equivalent objectives can be achieved by establishing and maintaining effective safety.

Colorado Jurisdictional Context:

In the State of Colorado, electrical installations are governed under the authority of the Department of Regulatory Agencies (DORA) and the State Electrical Board pursuant to Colorado Revised Statutes (CRS) Title 12, Article 115 . While municipal jurisdictions (such as Denver, Aurora, or Colorado Springs) may adopt local ordinances and enforce local amendments through their municipal building departments, the baseline safety standard across Colorado remains the adopted National Electrical Code edition. Where local jurisdictions do not maintain an independent electrical inspection department, state electrical inspectors from DORA act as the direct AHJ.