Study guide

11.4 Commercial & Multifamily Load Calculations

Colorado Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Colorado Electrical Licensing Laws, DORA Rules & Exam Logistics

1.1 Colorado Electrical Board, Licensure Tiers & Application Process 1.2 Senate Bill 25-165, Apprentice Supervision & Colorado Board Rules 1.3 Permitting, Inspection Procedures, Violations & Penalties 1.4 The Colorado PSI Exam: Open-Book Format, Time Management & Code Navigation

2 Chapter 2: Electrical Theory, Mathematics & Fundamental Concepts

2.1 Ohm's Law, Joule's Law & DC Circuit Analysis 2.2 AC Fundamentals: Inductance, Capacitance & Power Factor 2.3 Three-Phase Electrical Systems: Wye & Delta Configurations 2.4 Voltage Drop Principles & Single/Three-Phase Formulas

3 Chapter 3: General Installation Requirements — NEC Articles 90 & 110

3.1 NEC Structure, Arrangement & Article 90 Fundamentals 3.2 Key Article 100 Definitions for the Exam 3.3 Equipment Examination, Listing & Termination Temperature Limits 3.4 Working Space, Dedicated Electrical Space & Guarding

4 Chapter 4: Branch Circuits & Feeders — NEC Articles 210, 215 & 225

4.1 Branch-Circuit Ratings, Conductor Sizing & Multiwire Branch Circuits 4.2 Dwelling Unit Required Outlets & Receptacle Placement 4.3 Ground-Fault Circuit-Interrupter (GFCI) Protection 4.4 Arc-Fault Circuit-Interrupter (AFCI) Protection & Feeder Rules

5 Chapter 5: Services & Overcurrent Protection — NEC Articles 230, 240 & 242

5.1 Service Conductors, Clearances & Overhead/Underground Drops 5.2 Service Disconnecting Means, Ratings & Surge Protection 5.3 Overcurrent Protection Fundamentals & Standard Ratings 5.4 Feeder & Transformer Tap Rules

6 Chapter 6: Grounding and Bonding — NEC Article 250 Part I (Systems & Electrodes)

6.1 Grounding vs. Bonding: Principles, Functions & Article 250 Architecture 6.2 Grounded Conductors, Main Bonding Jumpers & System Bonding Jumpers 6.3 The Grounding Electrode System 6.4 Grounding Electrode Conductor (GEC) Sizing & Installation

7 Chapter 7: Grounding and Bonding — NEC Article 250 Part II (Equipment & Special Systems)

7.1 Equipment Grounding Conductors (EGC) Types & Identification 7.2 Sizing the Equipment Grounding Conductor 7.3 Separately Derived Systems 7.4 Grounding & Bonding at Separate Buildings or Structures

8 Chapter 8: Wiring Methods & Materials — NEC Chapter 3

8.1 General Wiring Requirements & Underground Installations 8.2 Nonmetallic and Armored Cable Assemblies 8.3 Metallic and Nonmetallic Raceways 8.4 Cable Trays, Wireways, Auxiliary Gutters & Surface Raceways

9 Chapter 9: Conductors, Ampacity & Wire Sizing — NEC Article 310

9.1 Conductor Properties, Insulation Types & NEC Table 310.16 9.2 Temperature Correction Factors 9.3 Conductor Bundling & Adjustment Factors 9.4 Comprehensive Conductor Sizing & Terminal Temperature Coordination

10 Chapter 10: Box Fill, Conduit Fill & Pull Box Calculations

10.1 Outlet and Device Box Fill Calculations — NEC 314.16(A) & (B) 10.2 Conduit Fill Calculations — Chapter 9 Tables 1, 4, 5 & Annex C 10.3 Pull and Junction Box Sizing for Conductors 4 AWG and Larger — NEC 314.28 10.4 Practical Enclosure & Raceway Sizing Exam Scenarios

11 Chapter 11: Load Calculations — Dwellings & Commercial Buildings — NEC Article 120

11.1 General Lighting, Small Appliance & Laundry Loads 11.2 Fixed Appliances, Dryers & Cooking Equipment Calculations 11.3 Standard vs. Optional Calculation Methods for Single-Family Dwellings 11.4 Commercial & Multifamily Load Calculations

12 Chapter 12: Motors, Motor Circuits & Controllers — NEC Article 430

12.1 Motor Nameplate vs. NEC Tables & Motor Full-Load Current 12.2 Sizing Motor Branch-Circuit Conductors & Overload Protection 12.3 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection 12.4 Motor Feeders, Disconnecting Means & Controllers

13 Chapter 13: Transformers, Distribution & Utilization Equipment

13.1 Transformer Overcurrent Protection & Installation — NEC Article 450 13.2 Panelboards, Switchboards & Switchgear — NEC Article 408 13.3 Luminaires, Appliances & Fixed Electric Space Heating 13.4 Generators, Transfer Switches & Standby Systems

14 Chapter 14: Special Occupancies, Renewable Energy & Modern Technologies

14.1 Hazardous (Classified) Locations — NEC Articles 500-516 14.2 Health Care Facilities & Places of Assembly — NEC Articles 517 & 518 14.3 Swimming Pools, Spas, Hot Tubs & Fountains — NEC Article 680 14.4 Solar Photovoltaic (PV) Systems & Energy Storage — NEC Articles 690, 705 & 706

11.4 Commercial & Multifamily Load Calculations

Key Takeaways Explain This Topic AI

Commercial general lighting loads from NEC Table 120.42 are classified as continuous loads under NEC 210.20 and 215.3, requiring feeder conductors and overcurrent devices to be sized at 125%.

Commercial receptacle outlets are calculated at 180 VA per strap under NEC 120.14(I), with feeder demand calculated under Table 120.44 at 100% of the first 10 kVA and 50% of the remainder over 10 kVA.

Show window lighting requires a baseline of 200 VA per linear foot under NEC 120.14(G), and commercial signs require at least one 1,200 VA circuit under NEC 120.14(F), each subject to a 125% continuous load factor.

Commercial kitchen equipment feeder demand factors under NEC 120.56 scale from 100% down to 65% for six or more units, but the calculated load cannot be less than the sum of the two largest units.

Multifamily dwellings can be sized under the NEC 120.84 optional method if all units have electric cooking and electric HVAC, applying declining demand factors based on unit count.

Last updated: September 2026

11.4 Commercial & Multifamily Load Calculations

Exam Fast Fact: Commercial calculations introduce two fundamental engineering shifts from residential: continuous load multipliers and occupancy-specific demand schedules . In commercial installations, general lighting is almost universally considered continuous (operating 3 hours or more), triggering the mandatory 125% factor under NEC 215.3 . For commercial kitchen equipment under NEC 120.56 , always remember the safety floor: the calculated feeder demand can never be less than the sum of the two largest equipment loads!

Commercial and multifamily electrical distribution systems serve diverse occupancies—retail storefronts, office buildings, commercial restaurants, and multi-unit apartment complexes. Calculating these systems requires mastering occupancy-specific unit lighting loads, receptacle derating tables, dedicated storefront requirements, kitchen diversity factors, and multifamily optional methods.

Commercial General Lighting & The 125% Continuous Factor

Under NEC 120.42 and Table 120.42 , general lighting loads in non-dwelling occupancies are calculated on a volt-amperes per square foot basis that varies with the occupancy. The 2026 NEC carried the 2023 substance forward under the new Article 120 numbers. Unlike a dwelling, a commercial occupancy also counts its general-use receptacles separately, at 180 VA per yoke under 120.14(I). REPRESENTATIVE COMMERCIAL LIGHTING UNIT LOADS

  • (NEC TABLE 120.42)
  • ┌────────────────────────────────────┬─────────────────────────────────┐
  • │ Occupancy Classification │ Unit Load (VA / sq ft) │
  • ├────────────────────────────────────┼─────────────────────────────────┤
  • │ Office Buildings │ 1.30 VA/sq ft │
  • │ Retail Stores │ 1.50 VA/sq ft │
  • │ Banks │ 1.00 VA/sq ft │
  • │ Restaurants │ 1.20 VA/sq ft │
  • │ Warehouses (Storage) │ 0.25 VA/sq ft │
  • │ Schools │ 1.20 VA/sq ft │
  • │ Hospitals │ 1.60 VA/sq ft │
  • │ Hotels and Motels │ 1.00 VA/sq ft │
  • └────────────────────────────────────┴─────────────────────────────────┘
  • The Continuous Load Mandate (NEC 210.20(A) & 215.3)

In commercial buildings, lighting circuits routinely remain energized for 8 to 14 hours continuously. Article 100 defines a continuous load as any load where the maximum current is expected to continue for 3 hours or more .

NEC 215.3 Rule: The rating of the overcurrent device and feeder conductors shall not be less than the noncontinuous load plus 125 percent of the continuous load . Commercial Lighting Feeder Conductor / OCPD Size = Calculated Lighting VA × 1.25 \text{Commercial Lighting Feeder Conductor / OCPD Size} = \text{Calculated Lighting VA} \times 1.25 Commercial Lighting Feeder Conductor / OCPD Size = Calculated Lighting VA × 1.25

Where the 125 percent belongs (NEC 120.5(E)): the 2026 edition states that load calculations shall not require continuous loads to be calculated at 125 percent . The multiplier belongs to sizing conductors and overcurrent devices under 210.19, 210.20, 215.2, 215.3, and 230.42 — not inside the Article 120 calculation itself. If you apply it in both places, you oversize the service by counting the same factor twice.

Commercial Lighting Demand Factors (Table 120.45)

Most commercial occupancies — general retail stores, restaurants, and offices — calculate general lighting at 100 percent demand with no reduction. Table 120.45 , the lighting load demand factor table, provides reductions for the non-dwelling occupancies where the lights are not all on at once:

Hospitals: First 50,000 VA at 40%; remainder over 50,000 VA at 20%.

Hotels and Motels: First 20,000 VA at 50%; 20,001 to 100,000 VA at 40%; remainder over 100,000 VA at 30%.

Warehouses: First 12,500 VA at 100%; remainder over 12,500 VA at 50%.

Commercial Receptacle Loads: NEC 120.14(I) & Table 120.44

In commercial occupancies, general convenience receptacles are not included in the lighting unit load. They must be calculated separately:

Baseline Load (NEC 120.14(I)): Receptacle outlets shall be calculated at not less than 180 volt-amperes for each single or for each multiple receptacle on one yoke or strap.

A standard duplex receptacle is mounted on a single strap = 180 VA .

A single receptacle on a single strap = 180 VA .

A quad receptacle (two duplex receptacles on two separate yokes) in a two-gang box = 2 × 180 VA = 360 VA 2 \times 180\text{ VA} = \mathbf{360\text{ VA}} 2 × 180 VA = 360 VA .

Multi-Outlet Assemblies (NEC 120.14(H)): In commercial offices, testing benches, or computer labs using surface plug-strips (such as Wiremold or Plugmold):

Normal Use: 180 VA for each 5-foot section.

Heavy Simultaneous Use: 180 VA for each 1-foot section.

Feeder Demand Factors (NEC 120.44 & Table 120.44): The code recognizes that not all commercial convenience receptacles are loaded simultaneously. Feeder and service loads are permitted to use the demand factors in Table 120.44 : NEC TABLE 120.44 DEMAND FACTORS

  • ┌───────────────────────────────────┬──────────────────────────────────┐
  • │ Connected Receptacle Load (VA) │ Demand Factor (%) │
  • ├───────────────────────────────────┼──────────────────────────────────┤
  • │ First 10,000 VA (10 kVA) │ 100% (1.00) │
  • │ Remainder over 10,000 VA │ 50% (0.50) │
  • └───────────────────────────────────┴──────────────────────────────────┘
  • Worked Example: 150 Duplex Receptacles in an Office

Connected Load = 150 × 180 VA = 27 , 000 VA 150 \times 180\text{ VA} = 27,000\text{ VA} 150 × 180 VA = 27 , 000 VA .

First 10,000 VA @ 100% = 10 , 000 VA 10,000\text{ VA} 10 , 000 VA .

Remainder = 27 , 000 − 10 , 000 = 17 , 000 VA × 0.50 = 8 , 500 VA 27,000 - 10,000 = 17,000\text{ VA} \times 0.50 = 8,500\text{ VA} 27 , 000 − 10 , 000 = 17 , 000 VA × 0.50 = 8 , 500 VA .

Calculated Feeder Demand Load = 10 , 000 + 8 , 500 = 18 , 500 VA 10,000 + 8,500 = \mathbf{18,500\text{ VA}} 10 , 000 + 8 , 500 = 18 , 500 VA .

Show Window & Sign Lighting Loads

Commercial storefronts require dedicated allocations for display windows and outdoor signage under NEC 120.14 and Article 600 : STOREFRONT & COMMERCIAL SIGN REQUIREMENTS

  • │
  • ┌────────────────────────────┴────────────────────────────┐
  • ▼ ▼
  • SHOW WINDOW LIGHTING SIGN LIGHTING
  • (NEC 120.14(G) & 120.43(A)) (NEC 120.14(F) & 600.5)
  • Minimum 200 VA per linear foot • Minimum one 20A branch circuit
  • Measured horizontally along base • Minimum 1,200 VA per tenant
  • Continuous Load: Multiply by 1.25 • Continuous Load: Multiply by 1.25
  • = 250 VA per linear foot for sizing = 1,500 VA for sizing
  • 1. Show Window Lighting (NEC 120.14(G) & 120.43(A))

Show window lighting must be calculated at not less than 200 volt-amperes per linear foot (660 VA/m) of show window, measured horizontally along its base.

Because retail display windows operate continuously throughout evening shopping hours, they are classified as continuous loads. When sizing branch circuits or feeder conductors, the load becomes: Design Load = Length (ft) × 200 VA/ft × 1.25 = Length (ft) × 250 VA/ft \text{Design Load} = \text{Length (ft)} \times 200\text{ VA/ft} \times 1.25 = \text{Length (ft)} \times 250\text{ VA/ft} Design Load = Length (ft) × 200 VA/ft × 1.25 = Length (ft) × 250 VA/ft

2. Commercial Sign Lighting (NEC 120.14(F) & 600.5)

Under NEC 600.5(A) , each commercial building and each commercial occupancy accessible to pedestrians must be provided with at least one dedicated 20-ampere branch circuit for an electric sign or outline lighting system.

Under NEC 120.14(F) , sign and outline lighting outlets must be calculated at a minimum of 1,200 volt-amperes (or the actual nameplate rating if higher).

Because signs operate continuously at night, applying the 125% continuous factor yields: Sign Feeder Demand = 1 , 200 VA × 1.25 = 1 , 500 VA \text{Sign Feeder Demand} = 1,200\text{ VA} \times 1.25 = \mathbf{1,500\text{ VA}} Sign Feeder Demand = 1 , 200 VA × 1.25 = 1 , 500 VA

Commercial Kitchen Equipment: NEC 120.56 & Table 120.56

Commercial restaurant kitchens house high-capacity electrical cooking appliances, dishwashers, water heaters, and booster heaters. Under NEC 120.56 , a feeder or service demand factor is permitted based on the total number of commercially listed appliances installed: NEC TABLE 120.56 DEMAND FACTORS

  • ┌───────────────────────────────────┬──────────────────────────────────┐
  • │ Number of Kitchen Equipment Units │ Demand Factor (%) │
  • ├───────────────────────────────────┼──────────────────────────────────┤
  • │ 1 to 2 Units │ 100% │
  • │ 3 Units │ 90% │
  • │ 4 Units │ 80% │
  • │ 5 Units │ 70% │
  • │ 6 or More Units │ 65% │
  • └───────────────────────────────────┴──────────────────────────────────┘
  • The Critical Safety Floor Rule

NEC 120.56 Mandate: "In no case shall the feeder or service load be less than the sum of the two largest kitchen equipment loads."

This rule prevents an aggressive diversity factor from reducing the service calculation below what the two heaviest commercial appliances draw when firing simultaneously during a lunch or dinner rush.

Worked Example: Commercial Kitchen with 6 Appliances

An electrical contractor is calculating the feeder demand for a commercial kitchen with six pieces of electric equipment:

  • Commercial Convection Oven: 12 kW
  • Commercial Deep Fryer: 10 kW
  • Commercial Range/Flat-top: 14 kW
  • Commercial Dishwasher: 6 kW
  • Booster Water Heater: 9 kW
  • Food Warmer: 4 kW

Step 1: Determine Total Connected Load: Total Connected = 12 + 10 + 14 + 6 + 9 + 4 = 55 kW \text{Total Connected} = 12 + 10 + 14 + 6 + 9 + 4 = 55\text{ kW} Total Connected = 12 + 10 + 14 + 6 + 9 + 4 = 55 kW

Step 2: Apply Table 120.56 Demand Factor: For 6 units, the demand factor is 65 percent (0.65) : Calculated Demand = 55 kW × 0.65 = 35.75 kW \text{Calculated Demand} = 55\text{ kW} \times 0.65 = \mathbf{35.75\text{ kW}} Calculated Demand = 55 kW × 0.65 = 35.75 kW

Step 3: Check Safety Floor (Sum of Two Largest): The two largest loads are the Range (14 kW) and Convection Oven (12 kW): Minimum Allowable Load = 14 kW + 12 kW = 26.00 kW \text{Minimum Allowable Load} = 14\text{ kW} + 12\text{ kW} = \mathbf{26.00\text{ kW}} Minimum Allowable Load = 14 kW + 12 kW = 26.00 kW

Conclusion: Because 35.75 kW > 26.00 kW 35.75\text{ kW} > 26.00\text{ kW} 35.75 kW > 26.00 kW , the calculated feeder demand is 35.75 kW .

Multifamily Dwelling Calculations: NEC 120.84 Optional Method

Calculating main services for apartment buildings and multi-family complexes under the Standard Method requires computing each unit individually and summing them with extensive diversity. However, NEC 120.84 provides an Optional Calculation for Multifamily Dwellings that substantially reduces engineering effort and conductor size.

Qualifying Criteria for NEC 120.84

To utilize the optional multifamily calculation, the installation must satisfy three conditions:

No individual dwelling unit is supplied by more than one feeder.

Each dwelling unit is equipped with electric cooking equipment.

Each dwelling unit is equipped with an electric space-heating system, an electric air-conditioning system, or both. MULTIFAMILY DWELLING DEMAND (NEC TABLE 120.84)

  • ┌───────────────────────────────────┬──────────────────────────────────┐
  • │ Number of Dwelling Units │ Demand Factor (%) │
  • ├───────────────────────────────────┼──────────────────────────────────┤
  • │ 3 Units │ 45% │
  • │ 4 to 5 Units │ 45% │
  • │ 6 to 7 Units │ 44% │
  • │ 8 to 10 Units │ 43% │
  • │ 11 to 13 Units │ 42% │
  • │ 14 to 17 Units │ 41% │
  • │ 18 to 20 Units │ 40% │
  • │ 21 Units │ 39% │
  • │ 22 to 23 Units │ 38% │
  • │ 24 to 25 Units │ 37% │
  • │ 26 to 27 Units │ 36% │
  • │ 28 to 30 Units │ 35% │
  • │ 62 Units and Over │ 23% │
  • └───────────────────────────────────┴──────────────────────────────────┘
  • Step-by-Step Multifamily Procedure (NEC 120.84)

Connected Load per Unit: For each unit, sum:

3 VA per sq ft for general lighting and receptacles.

1,500 VA for each small-appliance circuit (minimum 2 = 3,000 VA).

1,500 VA for the laundry circuit (if provided in the unit).

Nameplate rating of all appliances fastened in place (water heater, dishwasher, disposal).

Nameplate rating of electric cooking equipment.

Larger of electric space heating or air conditioning.

Multiply by Number of Units: Total the connected loads across all identical dwelling units.

Apply Table 120.84 Demand Factor: Multiply the gross connected load by the percentage corresponding to the total unit count.

Add House Loads (Common Areas): Hallway lighting, exterior parking illumination, elevators, common laundry facilities, and fire pumps are house loads . They must be calculated separately under Part III of Article 120 (at 100% plus 125% continuous) and added directly to the diversified multifamily dwelling demand.

Compute Service Amperes: Divide total volt-amperes by the supply voltage ( 240 V 240\text{ V} 240 V for single-phase, or 3 × 208 V = 360.3 V \sqrt{3} \times 208\text{ V} = 360.3\text{ V} 3 ​ × 208 V = 360.3 V for three-phase 120/208V systems).

Practical Jobsite Scenarios & Common Exam Traps

Jobsite / Exam Scenario Technical Reality & Code Mandate Common PSI Exam Trap

Commercial Lighting Continuous Factor: An examinee calculates commercial office lighting at 1.30 VA/sq ft and feeds it directly into breaker sizing without derating. Violation of NEC 215.3: Commercial lighting is continuous. You must multiply the calculated lighting load by 125% to size the feeder conductor and OCPD. Forgetting to apply the 1.25 multiplier to commercial lighting.

Office Receptacle Calculation: An installer calculates 100 commercial duplex receptacles at 3 VA per square foot. NEC 120.14(I) Rule: Commercial receptacles are not included in square footage. Each yoke is 180 VA ( 100 × 180 = 18 , 000 VA 100 \times 180 = 18,000\text{ VA} 100 × 180 = 18 , 000 VA ), then derated via Table 120.44. Assuming commercial convenience receptacles are covered by the Table 120.42 lighting unit load.

Commercial Kitchen Floor Rule: A kitchen calculation yields a 65% demand load of 24 kW, but the two largest appliances are 15 kW and 12 kW ( 27 kW 27\text{ kW} 27 kW ). NEC 120.56 Violation: The demand load cannot be less than the sum of the two largest appliances ( 27 kW 27\text{ kW} 27 kW ). You must use 27 kW. Using the 65% calculated value when it falls below the two largest units.

Show Window Length: Sizing a branch circuit for a 25-foot show window. NEC 120.14(G) & 215.3: 25 ft × 200 VA/ft = 5 , 000 VA 25\text{ ft} \times 200\text{ VA/ft} = 5,000\text{ VA} 25 ft × 200 VA/ft = 5 , 000 VA . Continuous factor: 5 , 000 × 1.25 = 6 , 250 VA 5,000 \times 1.25 = 6,250\text{ VA} 5 , 000 × 1.25 = 6 , 250 VA . Forgetting either the 200 VA/ft baseline or the 125% continuous load factor.