Study guide
10.2 Backwater Valves and Fixtures Below the Sewer Level
Colorado Journeyworker Plumber Journeyman Plumber
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam
1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement
2 Chapter 2: General Regulations (IPC Chapter 3)
2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing
3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)
3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection
4 Chapter 4: Water Heaters (IPC Chapter 5)
4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits
5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)
5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations
6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)
6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1
7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)
7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water
8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)
8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns
9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)
9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings
10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)
10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions
11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)
11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules
12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)
12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building
13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)
13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves
14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)
14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors
15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)
15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage
16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)
16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps
17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)
17.1 Residential Fire Sprinkler Systems (IRC Section P2904)
18 Chapter 18: Isometric Analysis and Plumbing Calculations
18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes
10.2 Backwater Valves and Fixtures Below the Sewer Level
Key Takeaways Explain This Topic AI
IPC 714.1 requires a backwater valve where fixtures are on a floor whose finished elevation is below the elevation of the manhole cover of the next upstream manhole in the public sewer.
IPC 714.1 prohibits fixtures on a floor above that manhole cover elevation from discharging through a backwater valve, except in existing buildings.
IPC 714.2 requires backwater valves to comply with ASME A112.14.1, CSA B181.1 or CSA B181.2.
IPC 714.3 requires backwater valves to be installed so that access is provided to the working parts.
IPC 1111.1 requires a subsoil drain subject to backwater to be protected by an accessibly located backwater valve.
Last updated: September 2026
The reference elevation
The rule is not "below grade" and not "in the basement." It is a specific surveyed elevation:
IPC 714.1: Where plumbing fixtures are installed on a floor with a finished floor elevation below the elevation of the manhole cover of the next upstream manhole in the public sewer , such fixtures shall be protected by a backwater valve installed in the building drain, or horizontal branch serving such fixtures .
The manhole cover elevation is the level at which a surcharged public sewer will relieve itself onto the street. Anything below that level can be flooded by the sewer; anything above it cannot, because the street relieves first.
The prohibition is as important as the requirement
The same sentence continues:
Plumbing fixtures installed on a floor with a finished floor elevation above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve .
Exception: In existing buildings , fixtures above that elevation shall not be prohibited from discharging through a backwater valve.
This is the half of the rule candidates miss. A backwater valve is a moving flapper in a sewage stream; it collects debris, it can be held open by a rag, and it can be held shut by a lodged solid. Routing an entire house through one — including fixtures the public sewer can never reach — multiplies failure risk without adding protection.
The correct arrangement in new construction is a branch-specific valve: put the valve in the horizontal branch serving only the below-grade fixtures, and let the upper floors bypass it and drain to the building drain downstream.
Materials and access
714.2 Material : backwater valves shall comply with ASME A112.14.1, CSA B181.1 or CSA B181.2 .
714.3 Location : backwater valves shall be installed so that access is provided to the working parts .
"Access to the working parts" means the flapper, seat and any manual gate must be reachable for inspection and cleaning. A valve buried under a finished slab with no access box fails 714.3 even if the valve itself is correct.
Where else the code requires backwater protection
- Location Rule
- Sanitary fixtures below the upstream manhole cover elevation 714.1
Storm drainage systems 1101.9 — provided with backwater valves as required for sanitary drainage systems per Section 714
Subsoil drains subject to backwater 1111.1 — protected by an accessibly located backwater valve
Colorado: waste receptor in a crawl space Board Rule 1.2(E)(1)(pp) permits a waste receptor in a crawl space with an approved backwater valve installed
Building subdrains and pumped systems
Where fixtures sit so low that gravity discharge is impossible, a backwater valve is not the answer — a sump is. IPC 712.1 :
Building subdrains that cannot be discharged to the sewer by gravity flow shall be discharged into a tightly covered and vented sump from which the liquid shall be lifted and discharged into the building gravity drainage system by automatic pumping equipment or other approved method. In other than existing structures, the sump shall not receive drainage from any piping within the building capable of being discharged by gravity to the building sewer .
The last sentence mirrors 714.1's prohibition: do not route gravity-capable fixtures through mechanical equipment they do not need. Pumps fail; gravity does not.
Choosing the right protection
Situation Correct solution
Basement bathroom whose floor is below the upstream manhole cover, but the drain can still reach the sewer by gravity Backwater valve in the branch serving only those fixtures (714.1)
- Basement bathroom whose drain cannot reach the sewer by gravity Sewage ejector and sump (712.1, 712.4)
- Upper-floor fixtures in a new building No backwater valve — prohibited by 714.1
Upper-floor fixtures in an existing building already routed through a valve Permitted under the 714.1 exception
Below-grade area drain or trench drain subject to sewer surcharge Backwater valve , plus a sump if gravity discharge is impossible
- Subsoil drain subject to backwater Accessibly located backwater valve (1111.1)
- Worked example: a walk-out basement
A house sits on a sloping lot. The upstream manhole cover in the street is at elevation 100.0 feet . The main floor is at 103.5 feet . The walk-out basement's finished floor is at 95.2 feet , and the building drain leaves the basement at 94.4 feet , reaching the public sewer at 92.0 feet by gravity.
Analysis:
Basement fixtures : finished floor at 95.2 feet is below the 100.0-foot manhole cover elevation. A backwater valve is required in the building drain or the horizontal branch serving those fixtures (714.1).
Main floor fixtures : at 103.5 feet, above the manhole cover elevation. They shall not discharge through the backwater valve in this new construction (714.1).
Arrangement : install the backwater valve in the horizontal branch serving only the basement fixtures , then connect that branch to the building drain downstream of the valve. The main floor stack ties in downstream as well, bypassing the valve entirely.
Gravity check : the basement drain at 94.4 feet reaches the sewer at 92.0 feet by gravity, so no ejector is required (712.1).
Access : the valve must be installed with access to the working parts (714.3) — typically a floor-level access box with a removable cover.
Cleanout : the junction of the building drain and building sewer still needs a cleanout at the junction or within 10 feet upstream (708.1.3).
Reverse one fact — put the basement floor at 91.5 feet, below the sewer invert — and the answer changes entirely to a sump and sewage ejector under 712.1, sized under 712.4.2 and vented per Chapter 9.