10.1 Cleanouts, Manholes, and Access Requirements

Colorado Journeyworker Plumber Journeyman Plumber

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam

1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement

2 Chapter 2: General Regulations (IPC Chapter 3)

2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing

3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)

3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection

4 Chapter 4: Water Heaters (IPC Chapter 5)

4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits

5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)

5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations

6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)

6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1

7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)

7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water

8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)

8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns

9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)

9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings

10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)

10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions

11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)

11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules

12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)

12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building

13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)

13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves

14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)

14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors

15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)

15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage

16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)

16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps

17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)

17.1 Residential Fire Sprinkler Systems (IRC Section P2904)

18 Chapter 18: Isometric Analysis and Plumbing Calculations

18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes

10.1 Cleanouts, Manholes, and Access Requirements

Key Takeaways Explain This Topic AI

IPC 708.1.1 requires cleanouts on horizontal drainage pipes and building drains at intervals of not more than 100 feet, with manholes permitted instead at intervals of not more than 400 feet.

IPC 708.1.2 requires cleanouts on building sewers smaller than 8 inches at intervals of not more than 100 feet, and manholes on sewers 8 inches and larger within 200 feet of the building drain junction and at intervals of not more than 400 feet.

IPC 708.1.4 requires a cleanout at a change of horizontal direction greater than 45 degrees, with one cleanout serving all such changes occurring within 40 feet of developed length.

IPC 708.1.5 sizes cleanouts the same as the piping served, except that cleanouts for piping larger than 4 inches need not be larger than 4 inches.

IPC 708.1.10 requires 18 inches of clearance for cleanouts on 6-inch and smaller piping and 36 inches for 8-inch and larger piping.

Last updated: September 2026

Where cleanouts are required

IPC 708.1 requires cleanouts for drainage piping per Sections 708.1.1 through 708.1.12. Six triggers matter most.

708.1.1 Horizontal drains and building drains

Horizontal drainage pipes in buildings shall have cleanouts located at intervals of not more than 100 feet . Building drains shall have cleanouts located at intervals of not more than 100 feet except where manholes are used instead of cleanouts, in which case manholes shall be located at intervals of not more than 400 feet .

The interval is measured from the cleanout or manhole opening, along the developed length of the piping , to the next drainage fitting providing access for cleaning, the end of the horizontal drain, or the end of the building drain.

Exception: horizontal fixture drain piping serving a nonremovable trap is not required to have a cleanout for the section between the trap and the vent connection for that trap.

708.1.2 Building sewers

  • Sewer size Requirement
  • Smaller than 8 inches Cleanouts at intervals of not more than 100 feet

8 inches and larger A manhole located not more than 200 feet from the junction of the building drain and building sewer, and at intervals of not more than 400 feet

708.1.3 Building drain and building sewer junction

The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction . For the requirements of this section, the removal of the water closet shall not be required to provide cleanout access.

That last sentence retires an old practice: pulling a first-floor toilet is not an acceptable substitute for a cleanout at the sewer junction.

Colorado field note (not exam-scored): Board Rule 1.2(E)(1)(mm) adds that when the cleanout is installed at the junction, it shall be an approved two-way fitting with a single riser not to exceed 4 feet in depth , or a two-riser cleanout using back-to-back combination fittings or equal, of schedule 40 material, installed and tested at underground or rough-in per Section 312.2.

708.1.4 Changes of direction

Where a horizontal drainage pipe, a building drain or a building sewer has a change of horizontal direction greater than 45 degrees , a cleanout shall be installed at the change of direction. Where more than one change of horizontal direction greater than 45 degrees occurs within 40 feet of developed length , the cleanout installed for the first change of direction shall serve all changes within that 40 feet.

The word horizontal is doing real work. A vertical change of direction — a stack landing on a building drain — is not a 708.1.4 trigger.

Cleanout size — IPC 708.1.5

Cleanouts shall be the same size as the piping served , except that cleanouts for piping larger than 4 inches need not be larger than 4 inches .

Three exceptions:

A removable P-trap with slip or ground joint connections can serve as a cleanout for drain piping one size larger than the P-trap size.

Cleanouts located on stacks can be one size smaller than the stack size.

Cleanout size for cast-iron piping may follow the referenced standards for cast-iron fittings in Table 702.4.

So an 8-inch building drain gets a 4-inch cleanout, and a 6-inch stack may carry a 5-inch cleanout.

708.1.6 Cleanout equivalent : a fixture trap or a fixture with an integral trap, removable without altering concealed piping , is acceptable as a cleanout equivalent.

708.1.7 Cleanout plugs : of copper-alloy, plastic or other approved materials ; borosilicate glass systems use borosilicate glass plugs; copper-alloy plugs are limited to metallic piping systems . Plugs have a raised square head, a countersunk square head or a countersunk slot head.

  • Access and clearance
  • 708.1.10 Required clearance
  • Piping size Clearance from and perpendicular to the face of the opening
  • 6 inches and smaller not less than 18 inches
  • 8 inches and larger not less than 36 inches

That clearance is the room needed to swing a cable machine or insert a rod. A cleanout 8 inches from a furnace is unusable, and unusable is non-compliant.

708.1.11 Cleanout access

Required cleanouts shall not be installed in concealed locations.

"Concealed locations" expressly include:

  • inside plenums ,
  • within walls ,
  • within floor/ceiling assemblies ,
  • below grade , and

in crawl spaces where the height from the crawl space floor to the nearest obstruction along the path from the crawl space opening to the cleanout is less than 24 inches .

Additional rules in the same section:

Cleanouts with openings at a finished wall shall have the face of the opening within 1-1/2 inches of the finished wall surface .

Cleanouts below grade shall be extended to grade level so the top of the plug is at or above grade .

A cleanout in a floor or walkway without a trim cover shall have a countersunk plug flush with the finished surface .

708.1.11.1 requires trim covers and access doors designed for the purpose and approved , with corrosion-resistant fasteners, and prohibits covering cleanout plugs with mortar, plaster or any other permanent material .

708.1.11.2 requires ASME A112.36.2M floor cleanout assemblies where a plug must be protected from vehicular traffic loads.

Direction of cleaning and prohibited use

708.1.9 Installation arrangement : the arrangement of a cleanout shall enable cleaning of drainage piping only in the direction of drainage flow . Two exceptions: test tees serving as cleanouts , and an approved two-way cleanout installation meeting 708.1.3.

708.1.12 Prohibited use : using a threaded cleanout opening to add a fixture or to extend piping is prohibited , except where another cleanout of equal size is installed with the required access and clearance. Tapping the cleanout at the base of a stack to pick up a new floor drain destroys the access the code required there.

Manholes — IPC 708.1.8

Manholes and manhole covers shall be of an approved type . Manholes located inside of a building shall have gas-tight covers that require tools for removal.

A cleanout audit

A restaurant's underslab drainage: a 4-inch building drain runs 130 feet from the far end of the kitchen to the foundation, with two 90-degree horizontal offsets 22 feet apart, and connects to a 6-inch building sewer that runs 260 feet to the main.

Requirement Applies?

Cleanouts every 100 feet on the 130-foot building drain Yes — at least one intermediate cleanout, 708.1.1

Cleanout at each 90-degree horizontal offset One cleanout serves both, because the two changes occur within 40 feet of developed length, 708.1.4

Cleanout at the building drain / building sewer junction Yes , at the junction or within 10 feet upstream, 708.1.3

Cleanouts every 100 feet on the 260-foot, 6-inch building sewer Yes — the sewer is smaller than 8 inches, so the 100-foot rule applies, not the manhole rule, 708.1.2

  • Cleanout size 4 inches for the 4-inch drain; for the 6-inch sewer, not required to exceed 4 inches , 708.1.5
  • Clearance at each cleanout 18 inches , since all piping is 6 inches or smaller, 708.1.10
  • Below-grade cleanouts Must be extended to grade , 708.1.11
  • Grease interceptor upstream slope 1/4 inch per foot on the kitchen line feeding the interceptor, 704.1

Loading diagram... Cleanout requirements at a glance