Study guide
1.1 Exam Blueprint, Format, and the 2024 Code Changeover
Colorado Journeyworker Plumber Journeyman Plumber
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Passing the Colorado Journeyworker Plumber Exam
1.1 Exam Blueprint, Format, and the 2024 Code Changeover 1.2 Colorado Licenses, Experience Hours, and Apprentice Supervision 1.3 Permits, Inspections, Blue Tags, and Board Enforcement
2 Chapter 2: General Regulations (IPC Chapter 3)
2.1 Approved Materials, Certification, and General Installation Rules 2.2 Protection of Pipes: Contact, Notching, Shield Plates, and Freezing 2.3 Piping Support, Trenching, Bedding, and Backfill 2.4 Required Tests: Water, Air, and Backflow Assembly Testing
3 Chapter 3: Fixtures and Equipment (IPC Chapter 4)
3.1 Minimum Fixture Counts, Separate Facilities, and Toilet Room Location 3.2 Fixture Clearances, Compartments, and Setting Requirements 3.3 Water Closets, Urinals, Lavatories, Sinks, and Flush Devices 3.4 Showers, Bathtubs, Fixture Fittings, and Scald Protection
4 Chapter 4: Water Heaters (IPC Chapter 5)
4.1 Water Heater Installation, Location, Access, and Clearances 4.2 Relief Valves and Discharge Piping 4.3 Water Heater Pans, Pan Drains, and Storage Tank Requirements 4.4 Thermal Expansion Control and Hot Water Temperature Limits
5 Chapter 5: Water Supply Materials and Installation (IPC Chapter 6)
5.1 Water Service and Distribution Materials, and Sewer Separation 5.2 Joints, Connections, and Dissimilar Materials in Water Piping 5.3 Valves, Shutoffs, and Required Valve Locations
6 Chapter 6: Water Supply Sizing and Pressure (IPC Chapter 6 and Appendix E)
6.1 Pressure Limits, Pressure Reducing Valves, and Water Hammer 6.2 Water Supply Fixture Units and Estimating Demand 6.3 Sizing Water Piping with Appendix E and Table E104.1
7 Chapter 7: Cross-Connection Control and Backflow Prevention (IPC Sections 608-610, Chapter 13)
7.1 Cross-Connection Principles, Backsiphonage, and Backpressure 7.2 Air Gaps and the Backflow Preventer Family 7.3 Applying Backflow Protection to Specific Connections 7.4 Nonpotable Water Systems, Identification, and Reclaimed Water
8 Chapter 8: Sanitary Drainage Materials and Fittings (IPC Chapter 7)
8.1 Sanitary Drainage Materials and Where Each May Be Used 8.2 Drainage Joints, Transitions, and Prohibited Connections 8.3 Fittings for Change of Direction and Drainage Flow Patterns
9 Chapter 9: Sanitary Drainage Sizing (IPC Sections 704, 709-711)
9.1 Drainage Fixture Units and Load Estimation 9.2 Slope of Horizontal Drainage and Installation Rules 9.3 Sizing Building Drains, Building Sewers, and Horizontal Branches 9.4 Stacks, Branch Intervals, and Offsets in Tall Buildings
10 Chapter 10: Cleanouts, Sumps and Below-Sewer Drainage (IPC Sections 708, 712-716)
10.1 Cleanouts, Manholes, and Access Requirements 10.2 Backwater Valves and Fixtures Below the Sewer Level 10.3 Sumps, Sewage Ejectors, and Macerating Toilet Systems 10.4 Building Sewers, Private Disposal, and Special Drainage Conditions
11 Chapter 11: Vent Fundamentals and Terminals (IPC Sections 901-905, 908)
11.1 How Vents Work, Trap Seal Loss, and the One-Inch Rule 11.2 Vent Terminals, Roof Penetrations, and Sidewall Terminations 11.3 Vent Connections, Grade, and the Six-Inch Rules
12 Chapter 12: Vent Types and Sizing (IPC Sections 906-911, 917)
12.1 Individual Vents, Common Vents, and Vents for Stack Offsets 12.2 Trap-to-Vent Distance, Trap Arms, and Fixture Drains 12.3 Sizing Stack Vents, Vent Stacks, Branch Vents, and Headers 12.4 Putting a Vent System Together: A Worked Building
13 Chapter 13: Engineered and Special Venting (IPC Sections 912-916, 918-920)
13.1 Horizontal and Vertical Wet Venting 13.2 Waste Stack Vents, Circuit Vents, and Combination Waste and Vent 13.3 Island Fixture Venting and Air Admittance Valves
14 Chapter 14: Traps, Interceptors and Separators (IPC Chapter 10)
14.1 Fixture Traps, Trap Seals, and Prohibited Trap Types 14.2 Trap Seal Protection, Primers, and Barrier Devices 14.3 Grease Interceptors, Oil Separators, and Solids Interceptors
15 Chapter 15: Indirect and Special Waste (IPC Chapter 8)
15.1 Where Indirect Waste Is Required, and Air Gap Versus Air Break 15.2 Waste Receptors, Hub Drains, and Standpipes 15.3 Special Wastes, Chemical Neutralization, and Health Care Drainage
16 Chapter 16: Storm Drainage (IPC Chapter 11 and Appendix B)
16.1 Storm Drainage Scope, Disposal, and Prohibited Connections 16.2 Storm Drainage Materials, Roof Drains, and Conductors 16.3 Secondary Roof Drains, Scuppers, and Controlled Flow Systems 16.4 Rainfall Rates, Roof Area, and the Flow-Rate Conversion 16.5 Sizing Vertical Conductors, Leaders, and Storm Drains 16.6 Gutters, Subsoil Drains, Building Subdrains, and Storm Sumps
17 Chapter 17: Residential Fire Sprinklers (IRC Section P2904)
17.1 Residential Fire Sprinkler Systems (IRC Section P2904)
18 Chapter 18: Isometric Analysis and Plumbing Calculations
18.1 Reading Plumbing Isometrics and Riser Diagrams 18.2 Analyzing a DWV Isometric for Code Compliance 18.3 Offsets, Travel, and the Plumbing Math the Exam Assumes
1.1 Exam Blueprint, Format, and the 2024 Code Changeover
Key Takeaways Explain This Topic AI
The Colorado Journeyworker Plumber exam has 100 scored items and a 240-minute limit, and 70 correct items (70 percent) are required to pass (PSI Candidate Information Bulletin, updated 9/3/2026).
Sanitary Drainage Systems (20 items) and Vents (18 items) together supply 38 percent of the scored exam; Water Supply adds 15 more.
PSI states the test is based solely on the 2021 IPC and 2021 IRC and is not based on Colorado's state amendments to those codes.
Starting November 1, 2026 the Colorado plumbing exams change to the 2024 IPC and IRC, and PSI will supply the 2021 books only on request until February 1, 2027.
The examination fee is $78 and the retest fee is $73; both are non-refundable and valid for one year from the date of payment.
Last updated: September 2026
Why the blueprint comes first
Most candidates fail the Colorado Journeyworker Plumber exam for one of two reasons: they study a generic "plumbing" curriculum that does not match how PSI weights the test, or they study the wrong code book. Both problems disappear once you read the actual Candidate Information Bulletin (CIB) that PSI publishes for the Colorado State Plumbing Board . The version in force as this guide is written was updated September 3, 2026 , and every fact in this section comes from it.
Format at a glance
- Item Journeyworker Plumber
- Scored items 100
- Time limit 240 minutes (4 hours)
- Passing standard 70 percent — 70 items correct
- Non-scored pretest items Up to 10, with 30 extra minutes added
- Delivery Computer-based at a PSI test center
- Books Open book — 2021 IPC and 2021 IRC supplied by PSI
- Exam fee / retest fee $78 / $73
- Score report Displayed immediately, pass/fail only
PSI scores the exam with a compensatory model . Every scored item is worth one point, wrong and blank answers are worth zero, and strength in one content area offsets weakness in another. There is no per-area minimum you can fail on. That matters for study strategy: you do not have to be equally strong everywhere, but you cannot afford to write off a whole content area, because the areas are not equally sized.
Before the clock starts, PSI runs a tutorial with sample questions. Up to 15 minutes spent in the tutorial does not count against your 240 minutes. An online calculator is provided on screen.
The eleven scored content areas
This is the heart of the blueprint. Learn it, and you know exactly where every study hour should go.
- Content area Items Share Where this guide covers it
- Sanitary Drainage Systems 20 20% Chapters 8-10
- Vents 18 18% Chapters 11-13
- Water Supply 15 15% Chapters 5-7
- Storm Drainage Systems 10 10% Chapter 16
- Fixtures and Equipment 8 8% Chapter 3
- Water Heaters 7 7% Chapter 4
- General Regulations 5 5% Chapter 2
- Traps, Interceptors and Separators 5 5% Chapter 14
- Indirect and Special Waste Piping 5 5% Chapter 15
- Isometric Analysis 5 5% Chapter 18
- Residential Fire Sprinklers 2 2% Chapter 17
Two observations change how most candidates study:
Drainage and venting are more than half the exam. Sanitary Drainage, Vents, Storm Drainage and Traps total 53 items . If you can size a drain, size a vent, size a conductor and place a trap arm, you are most of the way to 70.
Storm Drainage is 10 items, not an afterthought. Chapter 11 of the IPC is the single most commonly skipped chapter in self-study, and it is worth five times as much as Residential Fire Sprinklers.
Note what is not on the blueprint: there is no Fuel Gas content area, no Colorado statute area, and no Board Rules area. Fuel gas piping is real licensed work in Colorado and it is inspected under the Colorado Fuel Gas Code, but it is not a scored area on this examination.
Which code book — and the November 1, 2026 changeover
The CIB's Reference List is unambiguous, and it is the single most important paragraph in the bulletin:
All examination questions are consistent with the 2021 edition of the International Plumbing Code (IPC) and the 2021 edition of the I.R.C. for One- and Two-Family Dwellings (IRC). The IPC and IRC will be provided at the test center... the test is solely based on the 2021 IPC and IRC, which is adopted into the Colorado Plumbing Code by reference. The test is not based on state amendments to the 2021 IPC and IRC within the Colorado Plumbing Code. Starting November 1, 2026 the exams will update to the 2024 IRC and IPC. The 2021 IRC and IPC will be available upon request until February 1st 2027.
Three consequences:
Answer from the model code, not from Colorado's amendments. Colorado really does amend the IPC — it deletes the frost-closure rule, permits air testing of plastic piping, fixes the vent roof extension at 6 inches, and more. Those amendments govern your installations and your inspections. They are not the basis for exam scoring. Where an amendment changes the answer, this guide flags it explicitly so you never confuse the two.
Check your test date against November 1, 2026. Test on or after that date and the books on the desk are the 2024 IPC and IRC. Between November 1, 2026 and February 1, 2027 you may request the 2021 books instead. After February 1, 2027 the 2021 editions are gone.
One stale sentence to ignore. The opening paragraph of the same bulletin still says the exams are "referenced in the 2018 edition." That is leftover boilerplate; the dated Reference List and the changeover notice are the operative text.
Book rules, and what you may not do to your code book
The IPC and IRC are provided at the test center . You may not bring your own, and you may not bring anything else:
You may not write in, highlight, underline, or index the reference books.
No tabs, no notes, no personal code book, no printed formula sheet.
Formulas are not provided and are not allowed in. The CIB says so directly: you must know basic plumbing theory formulas because they are needed in the Calculations work.
This single rule should reshape your preparation. Candidates who have spent years working out of a heavily tabbed personal code book lose enormous time on a clean, untabbed copy. Practice navigating a bare code book by chapter number and section number , not by the color of a tab: Chapter 3 general regulations, Chapter 4 fixtures, Chapter 5 water heaters, Chapter 6 water supply, Chapter 7 sanitary drainage, Chapter 8 indirect waste, Chapter 9 vents, Chapter 10 traps, Chapter 11 storm drainage.
Scheduling, sites and check-in
Register online at PSI's Colorado plumbing portal. Colorado test centers listed in the current bulletin include Broomfield (Jeffco Airport), Colorado Springs, Denver-Centennial, Denver-Wheat Ridge, Durango, Englewood (Test Pro Center at Centennial Airport), Fort Collins, Grand Junction, Lakewood (Red Rocks Community College) and Pueblo.
Arrive 30 minutes early for sign-in. Arrive after the start time and you forfeit the fee.
Bring one valid, unexpired, signed photo ID whose name matches your registration exactly.
Cancel at least 2 days before the appointment or you forfeit the fee.
Personal belongings, including phones, smart watches, notes and your own reference material, go into secure storage.
Passing is step one, not the finish line
The CIB is explicit: "Passing of an examination is not a guarantee of licensure." In the current process you pass the examination first, then file the license application with the Division of Professions and Occupations with your experience documentation. Board Rule 1.4(A)(1) states the same order. Older DPO web copy describing an approval-then-schedule sequence predates this; follow the bulletin and the rule.
A four-week study allocation that matches the blueprint
- Week Focus Items covered
- 1 Sanitary drainage: DFUs, slope, sizing, fittings, cleanouts 20
- 2 Vents: trap arms, sizing, wet/circuit/combination, AAVs 18
- 3 Water supply, backflow, water heaters 22
- 4 Storm drainage, fixtures, traps, indirect waste, isometrics, sprinklers 35
Finish with two full 100-item timed runs using a clean code book and the on-screen calculator only.